• Title/Summary/Keyword: Steelwork

Search Result 17, Processing Time 0.024 seconds

Experimental Verification on the Use of Steelwork as a Down-Conductor in Lightning Protection System (인하도선으로 활용하기 위한 철근콘크리트구조물의 전기 및 기계적 소요 특성에 대한 실험적 검증)

  • Lee, Ki-Hong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.9
    • /
    • pp.94-99
    • /
    • 2011
  • This paper verified the characteristics of electrical continuity and mechanical strength of steelwork required to use it as a down-conductor in lightning protection system. It was proven that the steelwork in reinforced concrete apartment has an excellent electrical continuity with low resistance(less than 0.2[${\Omega}$].). But it was confirmed that a poor connection between two reinforcement bars can easily cause serious damages of the concrete even with the impulsive current of 50[kA], 10/350[${\mu}s$]. These results of experiments mean that the additional measures are necessary in using the steelwork as the down-conductor of the lightning protection system.

Evaluation of Steelwork Continuity within Reinforced Concrete Apartment Structures (철근콘크리트 아파트의 철근구조체에 대한 전기적 연속성 평가)

  • Lee, Ki-Hong;Lee, Taek-Soeb;Kim, Oun-Seok
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.125-127
    • /
    • 2005
  • This paper conducted to evaluate electrical continuity of steelworks within reinforced concrete apartment structures as the down conductor in external lightning protection system. The reinforcing bars in reinforced concrete structures can be used as the down conductor when their overall electrical resistance is not greater than the resistance value of 0.2 ohm between the uppermost part and the ground level. According to the results of electrical resistances measured by 4-terminal low resistance measurements, the steelworks in reinforced concretes structures exhibited the electrical continuity with low electrical resistance.

  • PDF

STEP기술개발 현황

  • 김인한
    • Proceedings of the CALSEC Conference
    • /
    • 2000.08a
    • /
    • pp.99-114
    • /
    • 2000
  • ㆍ General - ISO 10303-202 : Associative draughting (CDS initiatve) ㆍ Building Construction - ISO 10303-225 : Building elements using explicit shape representation - ISO 10303-230 : Building structural frames : steelwork (CIMSTEEL) (중략)

  • PDF

Design and Construction of GINZA KABUKIZA

  • Kawamura, Hiroshi;Ishibashi, Yoji;Morofushi, Tsutomu;Saragai, Yasuyuki;Inubushi, Akira;Yasutomi, Ayako;Fuse, Naohiko;Yoshifuku, Manabu;Saitoh, Kouji
    • International Journal of High-Rise Buildings
    • /
    • v.5 no.3
    • /
    • pp.233-241
    • /
    • 2016
  • This paper describes the structural solution for the design of a 29-story high-rise tower, which features a large office space above the Kabukiza Theatre. Kabuki is a type of Japanese traditional drama, and Kabukiza is the home building of Kabuki. GINZA KABUKIZA is the fifth generation of the Kabukiza Theatre, the first of which was built in 1889. In order to support 23 stories of office space above the theater - featuring a large void in plan - two 13-meter-deep mega-trusses, spanning 38.4 meters, are installed at the fifth floor of the building. Steelwork is used as a primary material for the structure above-ground, and a hybrid response control system using a buckling-restrained brace and oil damper is adopted in order to achieve a high seismic performance. This paper also describes the erection process of installing hydraulic jacks directly above the mega-truss at column bases, in order to keep the structure above the truss level during construction. The temple architecture of the previous Kabukiza is carefully restored by incorporating contemporary light-weight materials supported by steelwork.

Assessment of Equipotential Bonding and Electrical Continuity in Buildings (건축물의 등전위 본딩 및 전기적 연속성 평가)

  • Gil, Hyoung-Jun;Kim, Dong-Woo;Kim, Dong-Ook;Lee, Ki-Yeon;Moon, Hyun-Wook;Kim, Hyang-Kon
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.06a
    • /
    • pp.385-386
    • /
    • 2009
  • This paper deals with assessment of equipotential bonding and electrical continuity in Buinding by investigation on the spot at construction site. The assessment was carried out for continuity of steelwork in reinforced concrete structure, bonding conductor, protective conductor. A new grounding system based on international standards includes unity grounding system, structure grounding utilizing steel reinforced concrete, equipotential bonding, use of surge protective device.

  • PDF

Temperature on structural steelworks insulated by inorganic intumescent coating

  • Choi, J. Yoon;Choi, Sengkwan
    • Steel and Composite Structures
    • /
    • v.15 no.1
    • /
    • pp.1-14
    • /
    • 2013
  • Predicting the fire resistance of structures has been significantly advanced by full scale fire tests in conjunction with improved understanding of compartmental fire. Despite the progress, application of insulation is still required to parts of structural steelwork to achieve over 60 minutes of fire rating. It is now recognised that uncertainties on insulation properties hinder adaptation of performance based designs for different types of structures. Intumescent coating has recently appeared to be one of most popular insulation types for steel structures, but its design method remains to be confirmed by empirical data, as technical difficulties on the determination of the material properties at elevated temperatures exist. These need to take into account of further physiochemical transitions such as moving boundary and endothermic reaction. The impetus for this research is to investigate the applicability of the conventional differential equation solution which examines the temperature rise on coated steel members by an inorganic intumescent coating, provided that the temperature-dependent thermal/mechanical insulation properties are experimentally defined in lab scale tests.

A new model for transient heat transfer model on external steel elements

  • Chica, J.A.;Morente, F.
    • Steel and Composite Structures
    • /
    • v.8 no.3
    • /
    • pp.201-216
    • /
    • 2008
  • The Eurocode system provides limited information regarding the structural fire design of external steel structures. Eurocode 1 provides thermal action for external member but only in steady-state conditions. On the other hand, Eurocode 3 provides a methodology to determine heat transfer to external steelwork, but there is no distinction in cross section shapes and, in addition, the calculated temperature distribution is assumed to be uniform in the cross section. This paper presents the results of a research carried out to develop a new transient heat transfer model for external steel elements to improve the current approach of the Eurocodes. This research was carried out as part of the project EXFIRE "Development of design rules for the fire behaviour of external steel structures", funded by the European Research Programme of the Research Fund for Coal and Steel (RFCS).

Investigation on the Spot for Grounding Systems in Buildings

  • Gil, Hyoung-Jun;Kim, Dong-Woo;Kim, Dong-Ook;Kim, Hyang-Kon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.3
    • /
    • pp.39-45
    • /
    • 2010
  • This paper deals with investigation on the spot for grounding systems of buildings based on international standards at construction sites. The investigation was carried out for grounding method, grounding type, shape of grounding electrode, grounding for a lightning protection system, continuity of steelwork in reinforced concrete structures, etc. The investigation on the spot was performed by a researcher and engineer with over fifteen years of industry experience all over the country. As a result of the investigation on the spot in 13 buildings, common grounding and structure grounding methods were dominant. The safety improvement methods include installation of equipotential bonding conductors for the connection to the main earthing terminal, equipotential bonding conductors for supplementary bonding, use of Surge Protective Devices (SPD), and safe connections between earthing conductors and the rebar.

On the numerical assessment of the separation zones in semirigid column base plate connections

  • Baniotopoulos, C.C.
    • Structural Engineering and Mechanics
    • /
    • v.2 no.3
    • /
    • pp.295-309
    • /
    • 1994
  • The present paper concerns the mathematical study and the numerical treatment of the problem of semirigid connections in bolted steel column base plates by taking into account the possibility of appearance of separation phenomena on the contact surface under certain loading conditions. In order to obtain a convenient discrete form to simulate the structural behaviour of a steel column base plate, the continuous contact problem is first formulated as a variational inequality problem or, equivalently, as a quadratic programming problem. By applying an appropriate finite element scheme, the discrete problem is formulated as a quadratic optimization problem which expresses, from the standpoint of Mechanics, the principle of minimum potential energy of the semirigid connection at the state of equilibrium. For the numerical treatment of this problem, two effective and easy-to-use solution strategies based on quadratic optimization algorithms are proposed. This technique is illustrated by means of a numerical application.

Assessment of Electrical Safety for Grounding System by Investigation on the Spot (현장조사에 의한 접지시스템의 전기안전성 평가)

  • Gil, Hyoung-Jun;Kim, Dong-Woo;Kim, Dong-Ook;Lee, Ki-Yeon;Kim, Hyang-Kon
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.361-364
    • /
    • 2008
  • This paper deals with assessment of electrical safety for grounding system of buildings by investigation on the spot at construction site. The investigation was carried out for grounding method, grounding type, shape of grounding electrode, grounding for lightning protection system, continuity of steelwork in reinforced concrete structure and so on. The investigation on the spot was performed by researcher, engineer with over fifteen years of industry experience all over the country. As a result of investigation on the spot to 13 buildings, common grounding method was dominant. A new grounding system based on international standards includes unity grounding system, structure grounding utilizing steel reinforced concrete, equipotential bonding. use of surge protective device.

  • PDF