• 제목/요약/키워드: Statistical Control Chart

검색결과 220건 처리시간 0.02초

AN INTEGRATED PROCESS CONTROL PROCEDURE WITH REPEATED ADJUSTMENTS AND EWMA MONITORING UNDER AN IMA(1,1) DISTURBANCE WITH A STEP SHIFT

  • Park, Chang-Soon
    • Journal of the Korean Statistical Society
    • /
    • 제33권4호
    • /
    • pp.381-399
    • /
    • 2004
  • Statistical process control (SPC) and engineering process control (EPC) are based on different strategies for process quality improvement. SPC re-duces process variability by detecting and eliminating special causes of process variation, while EPC reduces process variability by adjusting compensatory variables to keep the quality variable close to target. Recently there has been need for an integrated process control (IPC) procedure which combines the two strategies. This paper considers a scheme that simultaneously applies SPC and EPC techniques to reduce the variation of a process. The process model under consideration is an IMA(1,1) model with a step shift. The EPC part of the scheme adjusts the process, while the SPC part of the scheme detects the occurrence of a special cause. For adjusting the process repeated adjustment is applied according to the predicted deviation from target. For detecting special causes the exponentially weighted moving average control chart is applied to the observed deviations. It was assumed that the adjustment under the presence of a special cause may increase the process variability or change the system gain. Reasonable choices of parameters for the IPC procedure are considered in the context of the mean squared deviation as well as the average run length.

터널 시공 중 이상 거동 예측을 위한 계측 변위의 x-MR 관리도 활용 (Application of x-MR control chart on monitoring displacement for prediction of abnormal ground behaviour in tunnelling)

  • 윤현석;송규진;신영완;김창용;추석연;서용석
    • 한국터널지하공간학회 논문집
    • /
    • 제16권5호
    • /
    • pp.445-458
    • /
    • 2014
  • 터널 시공 중 측정된 계측 데이터는 굴진면 전방에 분포하는 지반과 터널 거동을 예측하는데 있어 중요한 요소이다. 그러나 현장에서 측정된 계측 데이터의 변동성을 객관적으로 분석할 수 있는 관리 기준이 명확하게 설정되어 있지 않다. 본 연구에서는 응용 통계 관리기법의 일종인 x-MR 관리도기법을 이용하여 시공 중 붕괴 또는 구조물 균열 등을 발생시키는 현장의 계측 데이터를 분석하고 분석기법의 적용성을 검토하였다. x-MR 관리도를 통해 관리 한계선을 설정하여 분석한 결과, 붕괴 발생 전 약 5~13m 이전에 이상 거동에 대한 예측이 가능하였으며, 시간에 따른 변위의 분석 결과, 최소 1일 전에 예측이 가능하였다. 또한, x-MR 관리도 작성시 이동 범위(k)는 5~10으로 설정하는 것이 이상 거동 예측에 적절한 것으로 판단된다.

기하분포에 기초한 관리도에서 베이즈추정량과 최대우도추정량 사용의 성능 비교 (Comparisons of the Performance with Bayes Estimator and MLE for Control Charts Based on Geometric Distribution)

  • 홍휘주;이재헌
    • 응용통계연구
    • /
    • 제28권5호
    • /
    • pp.907-920
    • /
    • 2015
  • 기하분포에 기초한 관리도는 불량품이 드물게 발생하는 고품질공정에서 불량률의 변화를 효율적으로 탐지할 수 있다고 알려져 있다. 이러한 관리도를 사용할 때 기본적인 가정은 관리상태일 때의 불량률이 알려져 있거나 또는 정확하게 추정되었다는 것이다. 그러나 고품질공정에서 불량률은 아주 작기 때문에 이를 정확하게 추정하기가 쉽지 않으며 또한 아주 큰 표본크기가 필요한 경우도 종종 발생한다. 일반적으로 제1국면에서 관리상태의 불량률을 추정할 때 최대우도추정량을 사용하지만, 이 논문에서는 베이즈추정량의 사용을 제안하였다. 베이즈추정량을 사용할 경우 실무자의 사전지식을 반영할 수 있으며 표본에 불량품이 발견되지 않을 경우 발생하는 최대우도추정량의 문제점을 해결할 수 있다는 장점이 있다. 기하 관리도와 기하누적합 관리도에서 베이즈추정량을 사용한 경우와 최대우도추정량을 사용한 경우를 비교한 결과, 표본의 크기가 크지 않은 경우 베이즈추정량을 사용하는 것의 효율이 더 좋음을 알 수 있었다.

Comparative analysis of Bayesian and maximum likelihood estimators in change point problems with Poisson process

  • Kitabo, Cheru Atsmegiorgis;Kim, Jong Tae
    • Journal of the Korean Data and Information Science Society
    • /
    • 제26권1호
    • /
    • pp.261-269
    • /
    • 2015
  • Nowadays the application of change point analysis has been indispensable in a wide range of areas such as quality control, finance, environmetrics, medicine, geographics, and engineering. Identification of times where process changes would help minimize the consequences that might happen afterwards. The main objective of this paper is to compare the change-point detection capabilities of Bayesian estimate and maximum likelihood estimate. We applied Bayesian and maximum likelihood techniques to formulate change points having a step change and multiple number of change points in a Poisson rate. After a signal from c-chart and Poisson cumulative sum control charts have been detected, Monte Carlo simulation has been applied to investigate the performance of Bayesian and maximum likelihood estimation. Change point detection capacities of Bayesian and maximum likelihood estimation techniques have been investigated through simulation. It has been found that the Bayesian estimates outperforms standard control charts well specially when there exists a small to medium size of step change. Moreover, it performs convincingly well in comparison with the maximum like-lihood estimator and remains good choice specially in confidence interval statistical inference.

계량형 관리도의 관리규격 계산에 사용되는 여러 계수값 사이의 관계 (Relationships among various factors used in calculating control limits of control chart for variable data)

  • 박성균;김영균
    • 품질경영학회지
    • /
    • 제30권4호
    • /
    • pp.86-93
    • /
    • 2002
  • There are many different factors used in calculating control limits of control chart for variable data. Specially these factors are divided into two groups such as "no given standard" and "given standard"(namely, for analysis and management), but many kind of factors give rise to confusion. Therefore, It is necessary to manifest relationships among factors for easy application regardless of subgroup size. Many SQC textbooks show us plainly these factors, but do not have enough for adequate explanation of relationships among factors. Besides, notation of these factors of SQC textbook isn't coincide with another one, so necessity to the coincidence for the notation of the factors is highlighted during my work recently. In this study, the close examination about relationships among various factors (A-A3, B3-B6, D1-D4, C4, d2, d3 etc) was carried out. Spread sheet results are presented for getting factors according to subgroup size, by grouping as the case of "no given standard" and "given standard". How are these factors to be applied in statistical package (ex, Minitab) have been analyzed using a series of sample data. analyzed using a series of sample data.

공정개선을 위한 인공신경망의 실험적 적용에 관한 연구 (A Study on the Experimental Application of the Artificial Neural Network for the Process Improvement)

  • 한우철
    • 한국컴퓨터정보학회논문지
    • /
    • 제7권1호
    • /
    • pp.174-183
    • /
    • 2002
  • 본 연구에서는 자동화된 데이터의 수집과 자동화된 제조환경하에서 수행될 수 있는 공정관리도의 패턴양상에 대하여 인공지능의 대표적인 기법인 인공신경망을 이용하여 각 패턴의 인식과 이의 검증, 그리고 이상패턴의 발생상황을 모니터링할 수 있는 지능형 공정관리 시스템을 개발하는데 중점을 두었다 개발된 패턴인식시스템을 이용하여 공정의 상태를 관리하는 작업자의 부담을 한층 덜어줄 수 있으며 작업자는 공정에 이상패턴이 발생하는 경우에 패턴인식시스템을 통하여 공정상태에 대한 정보를 전달받을 수 있어서 지속적인 품질개선활동을 수행할 수 있게 된다.

  • PDF

제1형 우측중도절단된 로그정규 수명 자료를 모니터링하는 누적합 관리도 (CUSUM charts for monitoring type I right-censored lognormal lifetime data)

  • 최민재;이재헌
    • 응용통계연구
    • /
    • 제34권5호
    • /
    • pp.735-744
    • /
    • 2021
  • 제품의 수명을 유지시키는 것은 품질관리의 주요 목표 중 하나이다. 실제 공정에서는 시간 및 비용의 문제로 인해 모든 표본의 수명을 측정할 수 없는 경우가 많이 발생하기 때문에, 대부분 중도절단된 자료를 포함시켜 표본을 구성한다. 이 논문에서는 제1형의 우측중도절단된 수명 자료가 로그정규분포를 따르는 경우, 제품 수명의 평균을 모니터링하는 두 가지 누적합 관리도 절차를 제안한다. 하나는 우도비에 기초한 누적합 관리도이고, 다른 하나는 이항분포에 기초한 누적합 관리도 절차이다. 모의실험을 통해 평균런길이를 비교하는 방법으로 제안된 두 관리도 절차의 성능을 비교하였다. 모의실험 결과, 중도절단율이 낮은 경우, 형상모수값이 작은 경우, 평균의 감소 변화량이 큰 경우에는 우도비 누적합 관리도가 더 효율적이며, 반대로 중도절단율이 높은 경우, 형상모수값이 큰 경우, 평균의 감소 변화량이 적은 경우에는 이항 누적합 관리도가 더 효율적인 것으로 나타났다.

다변량 공정 모니터링에서 이상신호 발생시 원인 식별에 관한 연구 (Notes on identifying source of out-of-control signals in phase II multivariate process monitoring)

  • 이성임
    • 응용통계연구
    • /
    • 제31권1호
    • /
    • pp.1-11
    • /
    • 2018
  • 최근 다변량 공정관리는 다양한 응용 분야에서 중요해지고 있는 추세이다. 예를 들어, 제조 산업 분야에서는 다변량 품질특성치를 동시에 모니터링할 필요가 있다. 그러나, 다변량 관리도는 이상신호가 발생한 경우 그 원인이 되는 개별적인 변수를 식별하기가 어렵기 때문에, 실제로는 기대만큼 유용하게 쓰이고 있지 않은 형편이다. 이에 본 논문에서는 새로운 관측치에 대한 개별적인 신뢰구간을 사용하여 이상신호의 원인을 탐지하는 세 가지 방법을 소개하고, 시뮬레이션 연구를 통해 이상신호의 원인이 되는 개별적인 변수를 식별하고 해석하는 데 있어 주의할 점이 무엇인지 살펴보기로 한다.

미래손실에 기초한 통합공정관리계획 (An Integrated Process Control Scheme Based on the Future Loss)

  • 박창순;이재헌
    • 응용통계연구
    • /
    • 제21권2호
    • /
    • pp.247-264
    • /
    • 2008
  • 통합공정관리의 기본절차는 잡음이 내재하는 공정에 대하여 수정조치를 취하고, 수정활동 중 공정에 이상원인이 발생하면 관리도를 통하여 발생을 탐지하고 교정활동을 통하여 이를 제거하게 된다. 그러나 공정의 교정활동은 많은 시간과 비용을 수반하는 비생산적 요인을 유발할 수 있기 때문에 무조건적 교정활동은 생산성을 저하시키는 반대 급부도 동시에 내포하고 있다. 이 논문에서는 공정모형으로 ARIMA(0,1,1) 모형을 가정하고 공정 평균과 분산에 이상원인이 발생하는 경우 이를 탐지하는 절차를 소개하고, 이상신호의 시점에서 공정 잔여시간 동안 발생할 수 있는 미래손실에 기초하여 교정 활동의 여부를 판단하는 통합공정관리 절차를 제안한다.

가변 샘플링간격 EPC/SPC 결합시스템의 개발 (Development of Integrated Variable Sampling Interval EngineeringProcess Control & Statistical Process Control System)

  • 이성재;서순근
    • 대한산업공학회지
    • /
    • 제32권3호
    • /
    • pp.210-218
    • /
    • 2006
  • Traditional statistical process control (SPC) applied to discrete part industry in the form of control charts can look for and eliminate assignable causes by process monitoring. On the other hand, engineering process control (EPC) applied to the process industry in the form of feedback control can maintain the process output on the target by continual adjustment of input variable. This study presents controlling and monitoring rules adopted by variable sampling interval (VSI) to change sampling intervals in a predetermined fashion on the predicted process levels under integrated EPC and SPC systems. Twelve rules classified by EPC schemes(MMSE, constrained PI, bounded or deadband adjustment policy) and type of sampling interval combined with EWMA chart of SPC are proposed under IMA (1,1) disturbance model and zero-order (responsive) dynamic system. Properties of twelve control rules under three patterns of process change (sudden shift, drift and random shift) are evaluated and discussed through simulation and control rules for integrated VSI EPC and SPC systems are recommended.