Application of x-MR control chart on monitoring displacement for prediction of abnormal ground behaviour in tunnelling |
Yun, Hyun-Seok
(Chungbuk National University, Dept. of Earth and Environmental Sciences)
Song, Gyu-Jin (Chungbuk National University, Dept. of Earth and Environmental Sciences) Shin, Young-Wan (Hakyong Engineering) Kim, Chang-Yong (Geotechnical Engineering Research Division, Korea Institute of Construction Technology) Choo, Seok-Yeon (Danwoo E&C) Seo, Yong-Seok (Chungbuk National University, Dept. of Earth and Environmental Sciences) |
1 | Kim, K.Y. (2009), "Characteristics of tunnel convertgence behaviour based on variation of rock mass rating", The Journal of Engineering Geology, Vol. 18, No. 4, pp. 545-553. |
2 | Kim, J.G., Um. S.J., Kim, S.K., Choi, S.W., Song, J.M. (2010), "Research results and trends analysis on process control charts for detecting small shift", The Spring Conference of the Korean Institute of Industrial Engineers, pp. 834-842. |
3 | Kwon, O.I., Baek, Y., Seo, Y.S. (2008), "Development of slope displacement data analysis system using control chart theory", Conference of the Korean Society of Engineering Geology, pp. 137-143. |
4 | The Japanese Geotechnical Society (1999), "Prediction and practice in NATM", pp. 239-242. |
5 | Park, S.H., Lee, T.J., Park, C.S. (2008), "A study on evaluation of tunnel stability by ground displacament under construction", Conference of the Korean Society of Engineering Geology, pp. 95-103. |
6 | Shewhart, W.A. (1924), "Some applications of statistical methods to the analysis of physical and engineering data", Bell System Technical jounal, Vol. 3, No. 1, pp. 43-87. DOI |
7 | Yim, S.B., Kim, S.K., Seo, Y.S., Park, S.H. (2007), "A study on convergency of tunnel displacement using conrol chart method", The Journal of Engineering Geology, Vol. 17, No. 2, pp. 197-204. |
8 | Yim, S.B., Jeong, H.G., Seo, Y.S. (2009), "Assessment of tunnel displacement with weak zone orientation using 3-D numerical analysis", The Journal of Engineering Geology, Vol. 19, No. 1, pp. 43-50. 과학기술학회마을 |
9 | Yim, S.B., Kim, K.Y., Kim, C.Y., Seo, Y.S. (2010), "New approach on prediction of fault zone ahead of tunnel face by using x-Rs control chart for RMR parameters", Journal of Korean Tunnelling and Underground Space Association, Vol. 12, No. 6, pp. 463-473. 과학기술학회마을 |
10 | Yun, H.S., Seo, Y.S., Kim, K.Y. (2014), "Prediction of fault zone ahead of tunnel face using x-Rs control chart analysis for crown settlement", Journal of Korean Tunnelling and Underground Space Association, Vol. 16, No. 4, pp. 361-372. 과학기술학회마을 DOI |
11 | Park, S.H., Park, Y.H. (2013), "Statistical quality control", Minyoungsa, pp. 574-578. |