• 제목/요약/키워드: Standard unit cost

검색결과 197건 처리시간 0.031초

건축주가 직접 발주한 석면해체공사 도급의 타당성에 관한 연구 (Practical Reasonability for Introducing Separate Contract Award System Concerning Asbestos Removal)

  • 손기상;갈원모;김형석
    • 대한안전경영과학회지
    • /
    • 제13권2호
    • /
    • pp.259-266
    • /
    • 2011
  • Project owner, asbestos removal specialist, experts on asbestos removal work, as counter parts to be defined in the study to make out research goals have been asked with questionnaire survey and replied with 65, 275, 32 cases, respectively. And additionally, direct interview 73 sheets have been collected to find out current status of required engineers and equipments assigned and provided to the field, from them, three(3) concerned parties. Questionnaire subjects are composed of common items, reasonable unit cost, need of separate contract-awarding system, status of performing standard contract, status of providing legal engineers and equipments. Concentrated review of two~three questions by subject has been made to find out and compare idea results between three(3) concerned parties. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there is introduction possibility of separate contract-awarding system, it is found out. The possibility of separate contract also has been confirmed by comparison of domestic legal grounds. Justificating grounds to introduce separate contract-awarding system have been shown. Standard contract status between asbestos removal specialists has been compared using two cases of providing removal work contract and receiving it. It is shown that case of 50 percent or less contains 38.5% when they receive contract, but only 10 percent reduction of original contract amount has been made when they provide it. It means that asbestos removal specialists do not keep occupational safety and health regulations.

HEVC의 재귀적 CU 구조에 대한 조건부 확률 기반 고속 탐색 알고리즘 (Conditional Probability Based Early Termination of Recursive Coding Unit Structures in HEVC)

  • 한우진
    • 방송공학회논문지
    • /
    • 제17권2호
    • /
    • pp.354-362
    • /
    • 2012
  • MPEG과 ITU-T에서 최근 표준화가 진행되고 있는 HEVC는 H.264/AVC에 비해, CU(coding unit), PU(prediction unit), TU(transform unit)의 다양한 형태 분할 단위를 갖는 것을 큰 특징으로 한다. 이 중, CU와 TU는 쿼드트리 형태의 재귀적 분할 구조를 가지도록 구성되는데, 압축 효율은 향상시키지만 높은 부호화 복잡도를 갖는 단점이 있다. 본 논문에서는 이러한 재귀적 분할 구조에서의 rate-distortion cost를 조건부 확률을 이용한 통계적 분석 방법을 사용하여, 분할이 일어나는 경우와 그렇지 않은 경우로 분류하는 방법을 제안한다. 제안한 방법을 HEVC의 재귀적 CU 부호화에 적용한 결과, 부호화 복잡도를 32% 가량 감소시키면서 압축 효율하락은 0.4-0.5%로 억제할 수 있었다. 또한, HM4.0에 구현되어 있는 고속 탐색 알고리즘과 함께 사용하는 경우, 압축 효율 하락을 0.9%로 억제하면서 부호화 복잡도를 1/2로 감소시킬 수 있었다.

대표공종 기반의 P.S.C 박스 거더교 개략공사비 산정모델 개발 -상부공사 중심으로- (Development of an Activity-Based Conceptual Cost Estimating Model for P.S.CBox Girder Bridge)

  • 조지훈;김상범
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.197-201
    • /
    • 2008
  • 국내 도로건설사업은 평균 단가 기준으로 개략공사비를 산정한다. 도로의 기초자료를 갱신함으로써 평균 단가를 수정하고 있으나 공사 특성을 전부 반영하기에는 미흡한 실정이다. 설계 진행단계에서 설계 대안을 평가하는데 활용할 수 있는 공사비 예측모델의 필요성이 제기되는 가운데 대표공정을 통해 표준물량을 산출하고 개략공사비 산정모델개발을 통해 실질적인 공사비 예측이 가능한 모델을 개발하고자 한다. 본 연구에서는 Prestressed Concrete Box Girder Bridge의 상부공사를 중심으로 연구를 수행하며 $2000{\sim}2007$년 사이에 수행되었던 구조물공 41건에 대한 기초자료를 수집하고 토목공사 수량산출기준에 의한 내역서를 기반으로 Grouping을 실시하여 대표적 특수교량인 ILM(Incremental Launching Method), MSS(Movable Scaffolding System), FSM(Full Staging Method), 그리고 FCM(Free Cantilever Method)등 교량 형식별로 총공사비에서 공사비 비중 및 해당 공종에서의 중요도가 높은 항목을 중심으로 설계 초기단계에서 가용한 정보 수준을 고려하여 대표공종 선정한다. 교량 형식별 선정된 대표공종을 살펴보면 P.S.C 강재설치 및 긴장작업/P.S.C BOX/자재대 및 자재운반비/철근가공 및 조립/증기양생/콘크리트 타설/거푸집/교면 방수/동바리 등 교량형식별 특수성을 제외하면 대표공종들이 순공사비에서 차지하는 비중이 비슷함을 알 수 있다. 공종들이 총공사비에서 차지하는 비율은 ILM(99.47%)/ MSS(99.22%)/ FSM(98.18%)/ FCM(98.12%)로 나타났다.

  • PDF

표준 모드를 지원하는 5Q MPI 하드웨어 유닛 설계 (Design 5Q MPI Hardware Unit Supporting Standard Mode)

  • 박재원;정원영;이승우;이용석
    • 한국통신학회논문지
    • /
    • 제37권1B호
    • /
    • pp.59-66
    • /
    • 2012
  • 최근 모바일 장치의 사용의 증가와 복잡한 응용 프로그램의 사용이 증가하면서 MPSoC의 사용이 증가하고 있다. 이러한 MPSoC의 성능을 향상시키기 위해 프로세서의 수가 늘어나고 있는 추세이다. 다수의 프로세서 구조에서 장점이 있는 분산 메모리 구조의 효율적인 데이터 전달하기 위해서 표준 MPI를 이용한다. 표준 MPI는 소프트웨어로 제공되지만, 하드웨어로 구현하면 보다 높은 성능을 얻을 수 있다. 하드웨어로 구현된 MPI의 메시지 전송 방식으로 기존의 동기 방식(Synchronous Mode), 준비 방식(Ready Mode), 버퍼 방식(Buffered Mode)과 이 방식들을 혼합한 형태인 표준 방식(Standard Mode)가 있다. 본 논문에는 기존의 MPI 하드웨어 유닛에서 사용되던 구조에 작은 크기의 데이터를 선별하여 버퍼 방식으로 전송함으로써 전송율을 극대화 하였다. 기존의 구조에서 사용된 3개의 큐(Queue)는 그대로 같은 기능을 하고, 본 논문에서 추가된 2개의 큐(작은 준비 큐와 작은 요청 큐)을 추가하여 임계점보다 작은 크기의 데이터에 대한 처리와 저장을 담당하도록 하여 성능을 향상하였다. 제안된 구조에서 임계점을 32byte로 제한하였을 때 임계점 이하의 데이터에서 20%의 성능 개선 효과를 볼 수 있었다.

V2G 전기자동차의 부하관리 자원 활용을 위한 적정 지원금 산정에 관한 연구 (A Study on the Decision of Appropriate Subsidy Levels Regarding Electric Vehicles for V2G as Load Management Resources)

  • 김정훈;황성욱
    • 전기학회논문지
    • /
    • 제65권2호
    • /
    • pp.264-268
    • /
    • 2016
  • Recently, various energy efficiency optimization activities are ongoing globally by integrating conventional grids with ICT (Information and Communication Technology). In this sense, various smart grid projects, which power suppliers and consumers exchange useful informations bilaterally in real time, have been being carried out. The electric vehicle diffusion program is one of the projects and it has been spotlighted because it could resolve green gas problem, fuel economy and tightening environmental regulations. In this paper, the economics of V2G system which consists of electric vehicles and the charging infrastructure is evaluated comparing electric vehicles for V2G with common electric vehicles. Additional benefits of V2G are analyzed in the viewpoint of load leveling, frequency regulation and operation reserve. To find this benefit, electricity sales is modeled mathematically considering depth of discharge, maximum capacity reduction, etc. Benefit and cost analysis methods with the modeling are proposed to decide whether the introduction of V2G systems. Additionally, the methods will contribute to derive the future production and the unit cost of electric vehicle and battery and to get the technical and economic analysis.

메뉴 엔지니어링, CMA분석방법에 의한 일식 메뉴 비교분석 - 특 1급 A호텔 레스토랑 사례 - (Analysis of the Menu from a Japanese Restaurant Using Menu Engineering and Cost/Margin Analysis - A Case of a Restaurant at a First Class (A) Hotel -)

  • 정우석;변광인;박성수
    • 한국식생활문화학회지
    • /
    • 제23권5호
    • /
    • pp.595-604
    • /
    • 2008
  • This study was conducted to evaluate the menu of a Japanese restaurant in a first class tourism hotel. The calculations used for the menu analysis were conducted using MS Excel 2003. Several previous studies have been conducted to analyze menus. For example, Pavesic used of the weighted contribution margins (WCM) and potential food cost (PFC%) to evaluate menus, while Kasavana & Smith used the mix margin (MM%) and unit contribution margin (CM) to evaluate menus. The menu engineering method focused on the customer's viewpoints, while the Cost/Margin analysis method considered the manager's viewpoints. The menus that need continuous keeping Kasavana & Smith (Star) and Pavesic (Standard) included 'Assorted sashimi with side dishes (big), 'Lunch box special', 'Tempura course', 'Broiled Spanish mackerel and side dishes', 'Shrimp tempura', 'Special sushi', 'Seafood Udong', 'Buckwheat noodles'. The results of this study should increase customer satisfaction and profits at the Japanese Restaurant.

Method Decoder for Low-Cost RFID Tags

  • Juels, Ari
    • 한국정보컨버전스학회:학술대회논문집
    • /
    • 한국정보컨버전스학회 2008년도 International conference on information convergence
    • /
    • pp.47-52
    • /
    • 2008
  • A radio-frequency identification(RFID) tag is a small, inexpensive microchip that emits an identifier in response to a query from a nearby reader. The price of these tags promises to drop to the range of $0.05 per unit in the next several years, offering a viable and powerful replacement for barcodes. The challenge in providing security for low-cost RFID tags is that they are computationally weak devices, unable to perform even basic symmetric-key cryptographic operations. Security researchers often therefore assume that good privacy protection in RFID tags is unattainable. In this paper, we explore a notion of minimalist cryptography suitable for RFID tags. We consider the type of security obtainable in RFID devices with a small amount of rewritable memory, but very limited computing capability. Our aim is to show that standard cryptography is not necessary as a starting point for improving security of very weak RFID devices. Our contribution is threefold: 1. We propose a new formal security model for authentication and privacy in RFID tags. This model takes into account the natural computational limitations and the likely attack scenarios for RFID tags in real-world settings. It represents a useful divergence from standard cryptographic security modeling, and thus a new view of practical formalization of minimal security requirements for low-cost RFID-tag security. 2. We describe protocol that provably achieves the properties of authentication and privacy in RFID tags in our proposed model, and in a good practical sense. Our proposed protocol involves no computationally intensive cryptographic operations, and relatively little storage. 3. Of particular practical interest, we describe some reduced-functionality variants of our protocol. We show, for instance, how static pseudonyms may considerably enhance security against eavesdropping in low-cost RFID tags. Our most basic static-pseudonym proposals require virtually no increase in existing RFID tag resources.

  • PDF

병원서비스별 원가분석모형의 개발과 적용 (Development of a Hospital Service-based Costing System and Its Application)

  • 박하영
    • 보건행정학회지
    • /
    • 제5권2호
    • /
    • pp.35-69
    • /
    • 1995
  • The managerial environment of hospitals in Korea characterized by low levels of medical insurance fees is worsening by increasing government regulations as to the utilization of medical services, rising costs of labor, material, and medical equipments, growing patient expectations concerning the quality of services, and escalating competitions among large hospitals in the market. Hospitals should seek for their survival strategies in this harsh environment and they should have information about costs of their products in doing so. However, it has not been available due to the complexity of the production process of hospital services. The objectives of this study were to develop a service-based cost accounting model and to apply the developed model to a study hospital to obtain cost information of hospital services. A model commonly used for the job-order product cost accounting in the manufacturing industry was modified for the use in hospitals in Korea. Actual costs, instead of standard costs, incurred to produce a unit of services during a given period of time were estimated in the model. Data required to implement the model included financial information, statistics for the allocation of supportive cost center costs to final cost centers, statistics for the allocation of final cost center costs to services, and the volume of each services charged to patients during a study period. The model was executed using data of a university teaching hospital located in Seoul for the fiscal year 1992. Data for financial information, allocation statistics fo supportive service costs, and the volume of services, most of them in electronic form, were available to the study. Data for allocation statistics of final cost center costs were collected in the study. There were 15 types of evaluation and management service, 2, 923 types of technical service, and 2, 608 types of drug and material service charged to patients in the study hospital during the fiscal year 1992. Labor costs of each of seven types of pesonnel, material costs of 611 types of drugs and materials, and depreciation costs of 212 types of medical equipments, miscellaneous costs, and indirect costs incurred in producing a unit of each services were estimated. Medical insurance fees for basic services such as evaluation and management of inpatients and outpatients, injection, and filling prescriptions, and for operating procedures were found to be set lower than costs. Infrequent services which use expensive medical equipments showed negative revenuse as well. On the other hand, fees for services not covered by the insurance such as CT, MRI and Sonogram, and for laboratory tests were higher than costs. This study has a significance in making it possible for a hospital to obtain cost information for all types of services which produced income based on all types of expenses incurred during a given period of time. This information can assist the management of a hospital in finding an effective cost reduction strategy, an efficient service-mix strategy under a given fee structure, and an optimum strategy for within-hospital resource allocations.

  • PDF

근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석 (The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project)

  • 박태일;김경훈;신은영
    • 한국건설관리학회논문집
    • /
    • 제20권2호
    • /
    • pp.37-43
    • /
    • 2019
  • 주당 최장 법정 근로시간을 단축하는 내용의 '근로기준법 개정안'이 통과됨에 따라 근로시간 단축에 따른 근로자 소득감소, 공사기간 연장, 공사비 증가 등 다양한 문제가 발생하고 있다. 특히 다른 산업과 비교할 때, 생산성을 중시하는 건설 프로젝트의 경우 공종에 따라 주 52시간 근무제에 따른 영향의 정도가 더 클 것으로 예상되나 이에 대한 연구는 미흡한편이다. 이에 본 연구에서는 NATM 터널 공사를 대상으로 표준품셈 기반의 표준공정과 굴착 사이클 타임 그리고 공종별 단위 공기를 제시하고, 이를 통해 주 52시간 근무 적용에 따른 실제 작업조의 변화와 이에 따른 표준 공기 및 공사비의 영향을 분석하였다. 분석결과 굴착 공기와 총 공기는 각각 20%, 8.9% 증가하였으나, 굴착공사비와 총 공사비는 오히려 각각 1.2%, 0.5% 감소하는 것으로 확인되었다.

물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안 (Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation)

  • 정기창;김영애;김용수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.540-545
    • /
    • 2008
  • 본 연구의 목적은 물가변동에 따른 실적공사비 등락률 산출 과정의 문제점과 개선방안을 제시하고자 수행되었다. 이 연구를 수행하기 위해서, 실적공사비 내역이 포함된 현장을 표본으로 실적공사비적용 방식 및 품셈적용 방식으로 물 가변동률을 산출하여 문제점을 분석하고 물가변동금액 산출에 대한 개선방안을 제안하였다. 이에 따른 연구의 결과는 다음과 같다. 1) 전체공사 내역 중 실적공사비 단가로 작성된 내역에 대해선 품셈 방식을 준용하여 물가변동 부분을 산출하는 것이 더 적정한 것으로 나타났다. 2) 산출방식에 혼선이 없도록 관련 법령 및 규정에서의 실적공사비 등락률 산출부분을 품셈으로 풀어 산정하도록 일부개정이 이루어져야 하는 것으로 나타났다.

  • PDF