• 제목/요약/키워드: Standard blasting

검색결과 73건 처리시간 0.019초

터널발파의 수치해석적 모델링 (Numerical Modelling of Tunnel Blasting)

  • 이인모;최종원;김상균;김동현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술발표회 논문집
    • /
    • pp.133-140
    • /
    • 2000
  • Drilling and blasting method for excavating rock mass is generally used in underground construction; but this technique has some shortcomings. For instance, rock mass damage is inevitable during drilling and blasting, and blast-induced vibration frequently causes some problems. Until now, field measurement method is used to predict the overbreak and vibration; but it has many limitations. Therefore, numerical analysis method is needed to overcome such limitations, and to estimate and predict damage and vibration due to tunnel blasting in the design stage. In this study, damage zone of rock mass due to stoping and contour blasting is compared based on standard tunnel blasting pattern, and the propriety of the standard tunnel blasting pattern is estimated. Then, blasting pattern is optimized so that the damage zone due to sloping blasting with reduced charge is consistent with that due to contour blasting.

  • PDF

터널발파시 실제 작업시간과 품셈의 비교 분석 (A Comparison of Operation Time between the Standard of Estimate and Actual Operations in Tunnel Blasting)

  • 김양균;김형목
    • 화약ㆍ발파
    • /
    • 제33권3호
    • /
    • pp.14-20
    • /
    • 2015
  • 발파터널의 건설과정에 있어서 가장 중요한 역할을 차지하는 발파작업은 암질상태, 터널의 규모, 사용 장비의 성능, 작업자들의 숙련도 등 다양한 요인에 의해 작업시간에서 차이를 나타낸다. 본 논문에서는 국내 세 곳의 터널발파 현장에서의 발파작업시간 조사를 통해, 표준품셈에서 계산되는 터널발파 사이클 시간과 실제 시공시간과의 차이를 분석하였다. 그 결과, 정상적인 작업이 이루어진 경우 전체적으로 실제 발파작업시간은 품셈보다 약 8%~ 16% 적게 나타나고 있다. 그러나 예상치 못한 상황으로 인해 지연되는 시간까지 포함한다면 실제 작업시간이 품셈을 초과하는 경우가 상당할 것으로 추정되었다. 본 연구는 향후에도 지속적인 작업시간 조사와 품셈과의 비교 분석을 통해 품셈의 적절성을 판단함과 아울러, 발파 굴착의 생산성을 향상시키는데 도움을 주고자 한다.

발파작업 표준 안전작업지침에 대한 개선안 (Establishing a Standard Work Guideline for Safe Blasting)

  • 김희도;이준원
    • 화약ㆍ발파
    • /
    • 제32권1호
    • /
    • pp.23-30
    • /
    • 2014
  • 국내 화약류에 대한 전반적인 관리와 발파작업에 대한 규정은 총포 도검 화약류등 단속법에 의하여 관리되고 있으나, 세부적인 취급과 사용법에 대한 지침은 산업안전보건법 제27조에 의거하여 발파작업 표준 안전작업지침을 마련하여 발파작업에서의 재해예방을 위한 화약류의 취급, 운반, 저장, 사용 및 관리와 작업상의 안전에 관하여 사업자에게 지도 권고하고 있다. 본 연구에서는 고용노동부에서 고시한 발파작업 표준 안전작업지침에 대하여 검토하였고, 국내화약시장에 도입된 신제품과 최신발파기술이 지침의 개정 시 반영될 수 있도록 화약류에 대한 용어의 정의와 추가로 포함해야 하는 에멀젼계 폭약과 벌크형태의 폭약, 그리고 최근 국내 발파현장에서 사용이 증가하고 있는 전자뇌관에 대하여 수록을 제안하였다. 또한, 작업지침에 대해서는 비전기식 뇌관과 전자뇌관의 대표적인 취급 방법을 예시를 들어 제안하여 지침안 개정 시 보완된 발파작업 표준 안전작업지침을 마련하도록 제안하였다.

건공화 공법의 발파 성능 평가를 위한 현장 시험에 관한 연구 (A Study of a Pilot Test for a Blasting Performance Evaluation Using a Dry Hole Charged with ANFO)

  • 이승훈;정성훈;최형빈
    • 대한토목학회논문집
    • /
    • 제42권2호
    • /
    • pp.197-208
    • /
    • 2022
  • 암반층이 얕은 깊이에서 출현하는 국내 지층 조건과 지하 공간의 활용도 증가로 인해서, 발파에 의한 굴착은 여전히 이용되고 있다. 발파 천공 이후에 존재하는 물이 있는 조건에서 실시되는 표준 발파는 폭굉압력 감소, 일정 장약량 사용, 디커플링과 같은 기술적인 어려움이 있다. 하지만, 기존의 표준 발파 공법을 대체할 만한 공법이 없는 실정이다. 본 논문에서는 건공화 펌프 시스템을 이용하여, 천공 내부에 존재하는 물을 제거하는 건공화 ANFO (Ammonium Nitrate Fuel Oil) 발파와 발파 성능의 비교를 위해서 추가적으로 표준 발파를 수행하였다. 각각의 발파 공법에서 계측된 진동 속도 데이터들과 환산거리의 함수로 이루어진 경험적인 발파진동 추정식을 이용하여, 최소제곱법에 의한 선형회귀분석을 실시하고, 궁극적으로 발파 성능을 정량적으로 분석하였다. 그 결과, 건공화 ANFO 발파에서 진동 감쇠가 더 크게 발생하고, 암반 파쇄에 더 많은 에너지를 소비하여, 더 가까운 거리에서 진동 허용 기준을 만족하는 진동 속도를 보였다. 또한, 표준 발파의 발파 진동 영향권이 건공화 ANFO 발파보다 더 멀리 있고, 발파 패턴의 범위가 더 넓은 것으로 나타났다. 본 연구에서 수행된 현장 발파 실험 결과로부터, 건공화 ANFO 발파 공법의 발파 성능이 효율적임을 확인하였다.

국토해양부 표준발파패턴의 셰일암반 적용성에 관한 사례 연구 (Review of Applicability of the Standard Blasting Patterns of MLTM to Various Rock Types)

  • 김세현
    • 화약ㆍ발파
    • /
    • 제27권1호
    • /
    • pp.47-52
    • /
    • 2009
  • 우리나라는 산악지역이 70%이산 분포되어 있는 지형적 특성으로 인하여 굴착작업 시 발파작업은 필수사항으로 되어있으며, 발파작업이 이루어지는 곳에는 발파진동 소음으로 인한 민원이 부수적으로 발생하고 있다. 발파작업을 위해 경제성과 안정성, 시공성에 따라 발파패턴이 선정되어진다. 하지만 민원의 해결을 위한 공법의 무절제한 변경 등이 이루어지고 있는 일들이 발생되는 경우가 빈번하여 이를 방지하기 위해 국토해양부는 설계 및 시공에 대한 표준발파공법을 제시하였다. 그러나 국토해양부표준발파공법(2006년)은 암종에 상관없이 일괄적인 발파패턴으로 설계되어 있으므로 셰일암반 등과 같이 낮은 강도의 암반, 절리가 많이 포함되어 있는 암반에 적용한다고 할 때에 이들 암반의 특성이 고려되지 않은 상태에서 일괄적인 장약량 등의 발파제원에 따라서 경제적인 손실이 생길 수 있다고 생각되어진다. 따라서 이와 같은 셰일 및 응회암반에서 현지암반의 특성을 고려하여 공간격과 저항선의 길이를 조정한 발파제원을 적용하여 시험발파를 수행하여 어느 정도의 경제성 증대 가능성의 결과를 도출하였다. 이를 시작으로 좀더 많은 사례를 통한 정량적 결과를 도출하여 설계 및 시공에 적용한다면 경제성 향상을 기대할 수 있을 것이라 사료되어진다.

노천시험발파의 진동평가와 개선방안 (A Vibration Evaluation and Improvement Scheme for Open Test Blasting)

  • 김응록
    • 한국산학기술학회논문지
    • /
    • 제18권1호
    • /
    • pp.310-315
    • /
    • 2017
  • 대규모 건설공사 현장에서는 발파공사에 대한 표준발파패턴과 시험발파패턴의 발파진동추정식의 상이에 따른 설계변경의 반영 문제로 시공사, 건설사업관리자, 발주처간의 갈등요인을 해소하기 위한 체계적인 자료의 수집 및 분석 과정을 통하여 효율적인 대책수립이 필요한 실정이다. 발파진동에 의한 인접 구조물에 미치는 영향을 여러 각도로 평가하려는 연구들은 계속 되어 왔으나, 노천발파를 수행하면서 현장계측의 진동파형을 분석하여 인접 건축물의 안전성을 확보하고 현장여건에 적합한 발파공법을 연구한 사례는 미미한 실정이다. 따라서 현장여건에 적합하고 경제적이며 효율적인 발파작업을 수행할 수 있도록 시험발파를 통하여 발파패턴 선정의 개선방안을 제시하는 것이 필요하다. 본 연구에서는 실제 도로확장공사 현장에서 시험발파를 통한 표준발파공법 및 진동규제기준별로 적용되는 이격 거리를 기준으로 노천 발파작업을 수행하여 발파진동 값을 계측하고 이를 통한 발파공법별 진동예측식을 회귀분석 전산프로그램을 이용하여 신뢰수준 95%의 K, n, R등을 산출하였다. 시험발파 대상지역의 발파허용진동기준을 0.3cm/sec로 설정하고 노천발파지침의 발파진동추정식과 시험발파의 발파진동추정식에 따른 이격 거리별 장약량과 발파공법을 비교분석한 결과 사업비가 증가하는 요인을 도출할 수 있었다. 또한, 노천발파 작업 중 인접 구조물에 대한 계측 및 분석을 수행하고 노천발파지점과 가장 인접한 구조물을 선정하여 발파진동 계측 및 평가를 시행하여 노천발파공사를 완료하는 과정에서 나타난 노천발파 설계 시공 지침에서의 시험발파 절차 및 해석방법에 대한 문제점을 분석하여 개선방안을 제시하였다.

토목 발파가 소음, 진동, 부유 분진에 미치는 영향 (Effects of Civil Blasting on Noise, Vibration and Total Suspended Particles)

  • 정진도;정영국
    • 한국환경과학회지
    • /
    • 제13권1호
    • /
    • pp.99-107
    • /
    • 2004
  • This research is to determine the level of environmental pollution at a blasting construction area which is the origin of noise, vibration, and suspended particle, and to compare the results with other domestic and international standard data. This experiment is also to find out the effects resulting from blasting construction and to propose a plan that can decrease environmental pollution. The blasting construction area is a factory site which is about one and half million square meter and sewage disposal plant is about ninety thousand square meter. Both were selected as the areas for the tests to be conducted in determination test. The test to determine the level of noise, vibration, and total suspended particle was conducted thirty times around the blasting construction area by comparing measurement results and numerical analysis. However, as the test was not conducted in the laboratory but in the actual blasting construction area, it was not possible to do the test with the same exact conditions each true. Therefore, the test was not ideal as conditions could change from test to test. For the most part, the level of noise was below the standard level of 70dB. Every vibration test was under the standard limitation. For example, a house, 200m away was tested for noise and vibration and the level was found to be under the 0.2 cm/sec which is the standard for specialty designed cultural sites., i.e very low level. Also a buried oil pipeline that was 30m away also marked under 2.0cm/sec which is the norm for an industrial area. However, if there were an oil pipeline under the house, the amount of charging gunpowder per hole should be decreased compared to the amount used in the test. The test result for suspended particles under the standard limitation which is 24hour average 300$\mu\textrm{g}$/㎥ at a distance from blasting wavelength, but at detonator, total suspended particle from the blast origin exceeded the standard limitation. If explosion occurs when it detonates in the hole, most of the energy would be absorbed in the crushing of rocks, but some remaining energy would make noises and vibration inevitable. So the important thing is how to minimize the environmental pollution from the blasting. There should be regulations in order that the standard limitation is not exceeded, and to decrease the environmental pollution from the blasting.

도심지 NATM 터널 굴착시 적용된 미진동발파 공법 개선사례 (A Case of the Alternative Method to Improve the Ambient Vibration Blasting Method Applied NATM Tunnel Construction in Urban Areas)

  • 이종윤;황연수;최학용;배효진
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.535-542
    • /
    • 2010
  • Various difficulties have been increased in the construction of public structure; like the road in the overcrowding urban area, because of civil complaint, cost and period of construction. In oder to overcome these social problems, the tunnel has been planned the road design. Despite the resolution, there are many technical problems when constructed near facilities. The design of new tunnel below the existing service reservoir is applied to the ambient vibration blasting using Plasma. The result of test blasting was exceeded the standard ("2kine"). So it was considered a countermeasure for the vibration reduction applied to change the controlled blasting method, reduce the charge, add the pre middle horizontal hole in the cut blasting site, and so on. The result was satisfied the standard. Accordingly, if the quality of blasting process can be managed well, the application of this alternative method is highly effective one. Also, based on cost analysis between two methods, the alternative method is very competitive.

  • PDF

발파소음의 예측기법과 환경규제 기준으로의 변환 연구 (A Study on the Prediction & Transformation of Blasting Noise for Environmental Regulation Standard)

  • 김남수;양형식
    • 화약ㆍ발파
    • /
    • 제18권2호
    • /
    • pp.14-22
    • /
    • 2000
  • 발파소음을 계측하여 예측방법의 타당성을 검토하였고, 환경규제 기준으로의 변환방식을 규명하였다. 환산거리에 따른 발파소음의 예측은 환산거리와 음압레벨의 상관성이 더 좋았으나, 상관계수가 낮아서 환산거리 설계 의한 발파소음의 조절은 어려움이 있었다. 발파시 동시에 측정된 음압레벨과 소음레벨의 상관식에 의한 변환과, 음압레벨의 우세주파수에 해당하는 청감보정회로의 보정치만큼 간이 보정하여 변환하는 방법과, 퓨리에 변환을 하여 청감보정한 후 소음레벨을 구하는 방법을 시도하였다. 세 가지 방법 모두 변환하는 데에는 많은 오차가 발생하였으나 우세주파수, FFT를 이용한 변환보다는 발파시 동시에 측정된 음압레벨과 소음레벨의 상관식에 의한 변환 방법이 가장 실용적인 방법이었다.

  • PDF

미진동화약을 적용한 터널발파 사례 연구 (A Case Study on the Application of Low Vibration Explosives(LoVEX) in Tunnel Blasting)

  • 이동훈;박윤석;이동희;유정훈
    • 화약ㆍ발파
    • /
    • 제30권2호
    • /
    • pp.59-65
    • /
    • 2012
  • 본 고에서는 기존 기계식 굴착공법 및 암파쇄공법(플라즈마, 겔파쇄 등)의 단점인 시공성 및 경제성을 개선하고, 발파진동을 최소화한 미진동화약(LoVEX)의 개발 및 현장적용 사례를 소개하였다. 이 미진동화약은 국토해양부 표준발파패턴중(中) Type-1(미진동굴착공법, 125g 미만의 폭약 사용)에 부합하며, 지발발파가 가능하고, 시공성 및 작업효율을 대폭 개선하는 반면 진동수준은 일반 에멀젼폭약의 약 60~70% 수준으로 나타났다. 추가적으로 현장 적용시 표준발파패턴, 발파진동추정식, 시공방법 등을 본 연구에 제시하였다.