• 제목/요약/키워드: Standard Construction Period

검색결과 202건 처리시간 0.032초

해저 송유배관 유지관리를 위한 기준 보완 제시 (Supplementation of Regulation on the Offshore Oil Pipeline for Maintenance)

  • 강찬성;문승재
    • 플랜트 저널
    • /
    • 제8권2호
    • /
    • pp.70-81
    • /
    • 2012
  • The study aims to supplement facility management plan and safety regulations & standard of oil pipeline by searching and reviewing related regulation & standard inside and outside of the country. Korean regulation & standard is reviewed based on harbor and fishery design standard of the ministry of maritime affairs and fisheries, general technology standard of oil pipeline safety regulation, gas excavation construction and safety maintenance indicator of Korea gas corporation. Global regulation & standard is reviewed based on U.S standard inspection for offshore pipeline and Europe/Mexico standard inspection for offshore pipeline. The contents of offshore pipeline installation is inserted into pipeline sector for objected facilities of safety inspection regulation & standard and, the standard of safety inspection for offshore pipeline is newly presented into pipeline maintenance part of the planning facilities management with its inspection period and method.

  • PDF

공공 건축사업의 공사기간 산정 현황 분석을 통한 개선방안 (Improvement Plan Through Analysis of the Current Status of Construction Period Calculation of Public Construction Projects)

  • 이종태;윤현도
    • 한국건설관리학회논문집
    • /
    • 제22권3호
    • /
    • pp.12-20
    • /
    • 2021
  • 건설 품질 및 안전 확보, 비용분쟁 방지를 위해 최근, '적정 공사기간' 산정의 중요성이 부각되었다. 건축공사기간 산정기준 마련을 위해서는 상당량의 과거자료 분석이 필요하다. 그러나, 근로시간 단축, 품질규정 강화 및 기후조건 변화 등 건설사업 환경이 이미 변경되어 과거자료의 사용에 대해 많은 전문가들이 의문을 제기하고 있는 실정이다. 또한, 건축공사는 공사 여건에 따라 작업순서, 생산성 등이 매우 다양해 과거 통계치를 활용한 획일적인 공사기간 산정 시 오류 가능성이 상승한다. 따라서, 적극적인 '생각의 전환'을 통해 과거자료 분석 방식에서 현재생산자료 검토 방식으로 변경하는 새로운 해법을 본 연구를 통해 제시하였다. 즉, 설계단계에 '공정관리 전문가' 및 '공종별 시공전문가'를 투입하여, '적정 공사기간'을 검토·산정하는 절차를 제도화하였다.

노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구 (A Study on Normal Project Period for Parking Lot of Aged Apartment Housing)

  • 방성배;장준영;구충완;김태완;이찬식
    • 한국건설관리학회논문집
    • /
    • 제22권6호
    • /
    • pp.107-119
    • /
    • 2021
  • 최근 노후 공동주택의 주차면수 부족 등의 문제로 공동주택 리모델링에 대한 관심이 높아지고 있다. 하지만 공동주택 리모델링 사업의 공사기간을 예측하기 위한 방법은 제시되지 않았다. 공동주택 리모델링 공사는 일반적인 공동주택 신축공사와 달리 철거공사나 보강공사가 수반되기 때문에 기존 공사기간 산정방안과 차별화된 현실성있는 리모델링 공사기간 산정방안이 제시되어야 한다. 따라서 이 연구에서는 공동주택 리모델링 공사의 지하주차장 공사기간을 도출하기 위한 모델을 제시하고자 한다. 선행 연구 고찰 및 전문가 자문을 통해 지하주차장 리모델링 공사의 19가지의 액티비티를 기준으로 각각의 공사기간을 산정하였다. 공사기간 산정을 위해 액티비티의 작업량데이터와 생산성데이터를 도출하였고, 생산성데이터의 보정을 위해 액티비티별 투입인원 및 장비투입대수를 결정하였다. 도출된 데이터를 활용하여 액티비티의 공사기간을 산출하였고, 액티비티 별 중첩기간 산정기준을 제시해 현실적인 공사기간과 예정공정표 작성이 가능하도록 하였다. 사례단지 검증을 통해 공사기간 정확도 예측 결과 정확도는 90%이상 일치하는 것으로 나타나 향후 공동주택 리모델링 공사의 지하주차장 개략 공사기간 예측과 공정표 작성이 가능할 것으로 기대된다.

국내외 표준 시방서의 거푸집 및 동바리 시공.해체 관련 규정의 비교 (Comparison of Prescription Regarding Form Work in Standard Specifications among Domestic and Foreign Countries)

  • 전규남;최성용;노상균;백대현;한민철;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.195-198
    • /
    • 2009
  • In this paper, regulation for form work in standard specification among Korea and foreign countries are studied and compared. Within the scope of this paper, regulation regarding fabrication of form and form removal are mainly focused on. Standard specification prescribed by construction temporary equipment association provides detailed regulations and well arranged. ACI 347-04, CEB-FIP and BS EN 13670 had different style and scope compared to domestic specification. Especially, regulation for form removal in ACI prescribed in terms of minimum period.

  • PDF

A STUDY OF SHOULDERING OF COMPENSATORY LIABILITY FOR DELAYED CONSTRUCTION FERIODS FOLLOWING BAD WEATHER CONDITIONS

  • Tae-Sang Jeong ; Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.705-708
    • /
    • 2005
  • In the case that construcion period is delayed because of the force majeure such as a typhoon or a flood, the owners in general should compensate the damages caused by those. But with exception the weather worsening of ordinary level is paid by contractors, while that of exceptional level by the owners. It is critical that it is difficult to distinguish objectively between ordinary and exceptional level weather worsening. Although the term of "ordinary" itself is too abstractive, we can reduce the disputes between owners and contractors by setting the appropriate and objective standard of distinction. For example in the case of rainfall it may be the standard of distinction whether the days of actual rainfall exceed those of average rainfall or not. If the days of actual rainfall don't exceed those of average rainfall contracters should pay the damages because it is distinguished with a ordinary level weather worsening. Besides the standard of distinction in another weather worsening such as severe cold/hot, strong wind etc. which have a effect on delaying the term of works could be settled as a similar model.

  • PDF

지역별 기본풍속과 공사기간을 반영한 시스템 동바리 설계 풍하중 분석 (Analysis of Design Wind Load Level for System Supports Considering Local Basic Wind Velocity and Construction Period)

  • 이선우;원정훈;마호성
    • 한국안전학회지
    • /
    • 제29권2호
    • /
    • pp.53-61
    • /
    • 2014
  • This study evaluated wind loads considering a local basic wind velocity and construction periods to define the level of applied wind loads for system supports. Structural responses of system supports were examined and compared to those of system supports with the level of wind loads following various standards and specifications for permanent and temporary structures. And, the maximum combined stress ratios were estimated to evaluate the structural safety of a considered system support. From results, it was found that the wind load level should be applied in accordance with construction periods when estimating the safety of system supports. Looking into the response by change of the basic wind velocity according to local regions, it is no need to consider wind loads in regions with the basic wind velocity of 30 m/s. However, it was analyzed that wind loads should be considered in the regions with the basic wind velocity of 40 m/s or above. In addition, wind loads should be considered in designing system supports located at the region with the basic wind velocity of 35 m/s starting from construction period of 1.5 years. The standard specification for temporary work was analyzed as an incorrect standard in evaluating wind loads, since it underestimated the response of system supports in accordance with the local basic wind velocity and construction periods.

온도추종 양생 장치에 의한 플라이애쉬 치환 콘크리트의 강도 발현 성상 (Study on the Strength Development of Fly ash Replace Concrete by a In-situ Temperature System)

  • 이건철;윤승조;이건영;최중구;김경민
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.126-127
    • /
    • 2014
  • At construction sites, due to the reason of inconvenience and difficulties of producing and using curing equipment and when it comes to measuring compression strength of the actual structure, strength of structure concrete according to general standards which are suggested in concrete standard specification are assessed. However, this method does not consider various variables of the sites such as kinds concretes and sizes of frame works so that it is not easy to measure proper curing period and strength. Thus, this study reviews description of strength development according to In-situ temperature system and analyzes and compares properties of strength development of the existing curing methods such as sealing curing so that it provides basic materials for period of removal of molds.

  • PDF

MITIGATION AND REMISSION OF CONTRACTOR'S DEFECTS LIABILITY IN KOREAN CONSTRUCTION CONTRACTS

  • Jong-Gwang Lee ;Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.447-451
    • /
    • 2005
  • The purpose of this study is to improve regulations such as law and standard contract forms related to defects liability in Korea. Defects liability has been one of the major causes of construction contract disputes in Korea in recent years. It is important to avoid or resolve disputes regarding defects liability through regulations containing clear criteria and to specify the standard regarding the mitigation and remission of the contractor's defects liability. This study was carried out through document research and analysis of judicial precedents. The following are the courses of improvement regarding the mitigation and remission of defects liability in Korea. First, laws and standard contract forms must contain more detailed clauses regarding exemption of a contractor's defects liability, which clearly set out the scope of the defects liability of the contractor. Second, the current system for defects liability favors the owner rather than the contractor - it is necessary to change the defects liability system in order to give the owner and the contractor an equal standing. Third, strict liability is taken on by the contractor even when the term of guarantee for defects lasts longer than the legally set period of liability for defects. Hence, it is necessary to improve the system by alleviating the liability of the contractor through applying negligence liability as opposed to strict liability during the term of guarantee.

  • PDF

TBM 굴착 공법 적용 구경별 표준 공사비 및 공사기간 분석 연구 (Analysis of Standard Cost and the Construction Period Applied TBM Excavation Method)

  • 박홍태
    • 한국재난정보학회 논문집
    • /
    • 제8권4호
    • /
    • pp.319-327
    • /
    • 2012
  • 본 연구는 대표적인 TMB 장비 회사인 독일 WRITH사에서 개발한 TMB 공법 적용 현장의 굴진보고서를 수집하여 작업운영 생산성을 분석하였다. 그리고 분석된 자료를 근거로 구경별(2.6m, 3.0m, 3.5m, 5.0m, 8.0m) 월굴진속도(m/월)를 도출하였다. 또한, 도출된 구경별 월 굴진속도를 근거로 독일의 WRITH사에서 구경별로 제시한 1m당 굴진에 소요되는 공사비 와 총공사기간을 산출하였다. 경암 40.0%, 연암 30.0%, 보통암 20%, 풍화암 10.0%로 구성된 암질을 기준으로 구경별로 도출된 월굴진속도, m당 공사비, 총공사기간은 향후 TBM 공법 적용시 기본계획단계와 기본설계단계에서 구경별 공사기간 및 공사비를 추정하는데 효과적인 활용 자료가 될 것으로 사료된다.

서중(暑中) 환경에서 현장 콘크리트 시험을 통한 재료 품질관리 방안 (A Study on Concrete Material Quality Management Based on Various Test of Construction Condition under Hot Weather Circumstance)

  • 박신
    • 한국건축시공학회지
    • /
    • 제5권3호
    • /
    • pp.91-99
    • /
    • 2005
  • It is required to study systematical on the concrete quality management to extend structure life because rebuilding effect is reducing under present condition of large sized and high stories structure. Concrete, which shows its intensity by hydrating action and a big change in quality according to hot weather and temperature, produces a lot of qualify problem under hot and cold weather Because of each specification and construction plan which does not have basic standard on site, concrete's quality is irregular and makes some defect. As a result, Daegu is turned out to be the longest area after investigating application period and days focused on 8 cities weather information about relationship between hot weather circumstance and construction environment. Therefore, we first surveyed the concrete material in the region and found out the problem of quality nanagement. Then figure out the way of solution. Moreover, we integrated concrete material quality management, which is applied differently to each site, to have equal quality and to reduce defect from construction site. And then, based on various test of construction condition and analysis of quality management item, we suggest effective concrete quality management to make concrete material construction standard guide and plan under hot weather.