1 |
Civil Engineering (1998). Case Studies of Japanese Mountain Tunnel Construction. pp.69-88.
|
2 |
Dohwal Design Company (2000). Ulsan Industrial Water Project Design Report. pp.19-21.
|
3 |
Dawid Marin. (1998). Proven TBM's Turn Power up in Norway Tunneling. pp.13-17.
|
4 |
Lee, Y.-I. (1997). "Case law on the TBM tunnel excavation." Korea Journal of the Tunnel, Vol.10, pp.27-38.
|
5 |
Park, Y.-O. (1998). "Case law on the TBM tunnel at hard rock." Korea Journal of Geotechnical Engineering, Vol.12, pp.57-67.
|
6 |
Park, H.-T., Soung, Y.-S. (2010). "A study on efficiency improvement through productivity analysis based on TBM operation data." Journal of the Society of Civil Engineers, Vol.30-1, pp.71-77.
|
7 |
Nishida, T., Matsumura, Y. (1993). Rock Mechnical Viewpoint on Excavation of Pressure Tunnel by TBM. pp.44-45.
|
8 |
Ultra Construction (2010). TBM Tunnel Excavation Process of Technological Innovation. pp.1-55.
|
9 |
Ultra Construction (1993). Tunnel Boring Machine Method. pp.1-68.
|