• Title/Summary/Keyword: Skilled Level

Search Result 145, Processing Time 0.036 seconds

The Kinematic Analysis of Upper Extremities for Badminton Smash and Drop Motions depends on the Player's Level (배드민턴 스매시와 드롭 동작 시 선수의 기량 차이에 따른 상지 동작의 운동학적 비교 분석)

  • Jo, A-Ra;Yoo, Si-Hyun;Yoon, Suk-Hoon
    • Korean Journal of Applied Biomechanics
    • /
    • v.23 no.3
    • /
    • pp.201-208
    • /
    • 2013
  • The aim of this study was to investigate badminton smash and drop motion depends on player's level. To perform this study, ten male badminton players were participated: five skilled players (SG, age: $21.6{\pm}1.1$ yrs, height: $181.4{\pm}6.8$ cm, body mass: $72.4{\pm}5.7$ kg, career: $11.2{\pm}1.1$ yrs) and five less-skilled players (LSG, age: $21.2{\pm}1.1$ yrs, height: $180.2{\pm}5.6$ cm, body mass: $73.6{\pm}6.7$ kg, career: $10.6{\pm}0.9$ yrs). Three-dimensional motion analysis with 7 infrared cameras was performed with a sampling frequency as 200 Hz. Player's swing motion was divided into four events: starting motion (E1), backswing (E2), impact (E3), following (E4). For all upper joints, LSG showed greater angle differences between drop and smash motions than that of SG at E3 (p<.05). For all upper joints, greater angular velocities were found in SG than that of LSG. For both groups, significantly smaller angular velocities were found in drop motion than that of smash motion (p<.05). The greater sequential angular velocities (proximal to distal) were found in SG than LSG during smash motion. Based on our findings, performing the same motion between drop and smash would be related to enhance performance at badminton competition. It is expected that these results will be useful in developing a training program for enhancing performance of badminton athletes.

Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.

Cutting-edge Technologies to Achieve a Higher Level of Modular Construction - Literature Review

  • Lee, Seungtaek;Choi, Jin Ouk;Song, Seung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.536-542
    • /
    • 2022
  • Cost overruns, schedule delays, and a shortage of skilled labor are common problems the construction industry is currently experiencing. Modularization and standardization strategies have the potential to resolve the various problems mentioned above and have been applied for various construction applications for a long time. However, the level of modularization remains low, and modular construction projects have not been getting the full benefits. Thus, this review investigated the cutting-edge technologies currently being utilized to develop the modular construction field. For this paper, qualified research papers were identified using predetermined keywords from previous related research papers. Identified literature was then filtered and analyzed. According to the included reviews, several technologies are being developed for modular construction. For example, automated design and monitoring systems for modularization were developed. In addition, research labs are utilizing robotic arms for modular construction to achieve a high level of completion in the construction industry, as is seen in the manufacturing industry. Despite these efforts, more research and development are necessary because some automation technologies still require manual activities. Thus, there is great potential for further development of modularization techniques, and further research is recommended to achieve high levels of modularization.

  • PDF

A Study on the Pre-fabrication of Three-story Column Re-bars for Saving Construction Time of High-rise Buildings (초고층 건물 공기단축을 위한 기둥철근 3개층 선조립공법에 관한 연구)

  • Kim, Gwang Hee;Kim, Jae Yeob;Seo, Deok Seok;An, Sung Hoon;Choi, Hee Bok;Jung, Beong Won
    • KIEAE Journal
    • /
    • v.7 no.2
    • /
    • pp.39-46
    • /
    • 2007
  • A high-rise building construction in Korea has some problems in engineering, construction and management technologies although the high-rise building construction is recently booming. In addition, the lack of skilled construction labors is increasing, so the development for methods is needed to reduce the labors by prefabrication and mechanization. A re-bar work is one of very important works with regard to cost and schedule management in the high-rise building construction. Nevertheless, the re-bar work has some problems that it is needed many re-bars for joints linking and much time for lifting due to high-rise buildings, and it is difficult to level the skill of labors. So, in this study, the pre-fabrication of three-story height in column re-bars is proposed and the results of an implementation are analyzed and explored by a case study. As the results of case study, the pre-fabrication of three-story heights in column re-bars could reduce the cost in the re-bar work and accelerate the time in the structural frame work. In addition, the pre-fabrication of three-story height in column re-bars could solve the problems such as the waste of many re-bars for joints linking, and the lack of the skilled labors.

The Effects of Patient and Facility Characteristics On the Resource Use by the Elderly in Long-term Care Services (환자 및 시설 특성이 장기요양서비스 이용 노인의 자원소모량에 미치는 영향)

  • 권순만;김홍수;김선민
    • Health Policy and Management
    • /
    • v.12 no.1
    • /
    • pp.21-53
    • /
    • 2002
  • The purpose of this study is to measure the resource use of the elderly in long-term care services and to examine the effects of patient and facility characteristics on their use of resources. The data were collected from 510 old people over sixty years of age, residing in five long-term care hospitals and two skilled nursing homes during the period between December 1, 2000 and February 28, 2001. For a full sample, when the first level of RUG(Resource Use Group)-III categories were employed as the proxy of patient severity, facility characteristics, such as location, size and ownership, have large effects on the resource use measured by service intensity, whereas patient characteristics such as severity have little or no effect. The resource use is significantly high if the facility: (1) is located in rural areas (gun): (2) has mare than 200 beds; (3) is a long-term care hospital; (4) is private; and (5) has a low percentage of medical aid patients. The analysis of the resource use in each RUG-III categories, for which ADL(Ability of Daily Living) were employed as the prosy of patient severity, shows a similar result. The loose relationship between the needs of residents and the resource use seems to be closely associated with the ineffective reimbursement system for providers. The current reimbursement system has no provision for quality improvement and reimburses facilities simply according to their types: fee-for-service for long-term care hospitals, and monthly-flat-rate or full-coverage-national-aid for skilled nursing facilities. It will be necessary to develop a more reasonable reimbursement system that takes patient's severity into account and gives incentives for long-term care providers to offer cost-effective services.

Organizational Citizenship Behaviors of Low-Skilled Immigrant Workers under Employment Permit System: Integrating Cultural Adjustment and Social Support Perspectives (일반 고용허가제 저숙련 이주근로자들의 조직시민행동: 사회적 지원과 문화적 적응 시각의 적용)

  • Chang, Eunmi;Lee, Jeong Won
    • Korean small business review
    • /
    • v.41 no.3
    • /
    • pp.107-128
    • /
    • 2019
  • The Employment Permit System (EPS), a system of bringing in low-skilled foreign workers, has been implemented since 2004 to relieve labor shortages in SMEs. Despite the increasing number of foreign workers under this system, due to lack of research we have very limited managerial understanding. Moreover, previous studies focused on economic or legal perspectives, which calls for a different perspective of business and management. In this study, we examined how to foster organizational citizenship behaviors (OCB) of low-skilled immigrant workers at the workplace by integrating two analytical frames-social support from management studies and cultural adjustment from immigrant literature. We tested our model using a sample of 661 immigrant workers from 11 countries working in Korea. Our results indicated that, social support perception triggered not only a direct effect on organizational citizenship behaviors of immigrant workers but also indirect effects via the level of cultural adaptation. Our findings indicated that two views are all meaningful in explaining OCB of immigrants, and provided practical implications to SMEs using EPS.

A Study on the Train Operation Optimization for Energy Saving (친환경 에너지 절약을 위한 열차운전 최적화 연구)

  • Choi, Ik-Sik;Jang, Woo-Jin;Choi, Kyu-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1059-1065
    • /
    • 2011
  • In line with the expansion of electric railway, reducing carbon emission and optimal train operation are required by economical, eco-friendly and efficient management. Most of the energy consumption in electric railway is consumed by train operation. So it is important that minimize the energy consumption in train operation. An analysis of the operation performance of the new model vehicle which in South Korea, Korail introduced shows that the energy consumption is different in line with the skill level of the engine driver. In this study, the know-how of train operation of a skilled engine driver is systematized by using artificial intelligence, and the technique which supports engine drivers with train operation was offered. As a result of applying in South Korea, the Gyeongbu line by using simulation, it confirmed that the maximum 20% can reduce the energy consumption in comparison with unskilled engine drivers in case of applying the Expert System.

  • PDF

A Note on Determination of Sample Size for a Likert Scale

  • Park, Jin-Woo;Jung, Mi-Sook
    • Communications for Statistical Applications and Methods
    • /
    • v.16 no.4
    • /
    • pp.669-673
    • /
    • 2009
  • When a social scientist prepares to conduct a survey, he/she faces the problem of deciding an appropriate sample size. Sample size is closely connected with cost, time, and the precision of the sample estimate. It is thus important to choose a size appropriate for the survey, but this may be difficult for survey researchers not skilled in a sampling theory. In this study we propose a method to determine a sample size under certain assumptions when the quantity of interest is measured by a Likert scale.

SAITEL : an easy robot language to use for SCARA type robots (사용에 편리한 ROBOT 언어 (SAITEL)의 개발)

  • 이영우;이관형
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1990.10a
    • /
    • pp.502-507
    • /
    • 1990
  • The robot operation by teach playback is easy and was widely used for simple jobs performed by a simple robot manipulator. However, as robots and their control systems and tasks become more and more sophisticated, such a simple robot operation is no longer adequate and programming languages capable for the complicated systems and tasks are greatly needed. In this paper, a high-level robot-specific programming language, SAITEL, is presented. It is an interpreter, based on Assembly, and has form similar to BASIC. SAITEL is easy to use for people who are not skilled programmers, and provides the capability to define robot task very conveniently. SAITEL was implemented on a direct drive SCARA robot developed in the Samsung Advanced Institute of Technology, and proved to be very useful for the operation of SCARA-type robots. It can be used also for other types of robots by slight modification.

  • PDF

The actual condition analysis on the determining factors of foreign workers employment in Korean companies (한국기업의 외국인근로자 고용 결정요인에 관한 실태분석)

  • Yoo, Seung-Gyun
    • International Commerce and Information Review
    • /
    • v.12 no.4
    • /
    • pp.213-234
    • /
    • 2010
  • This study focused on the determining factors of foreign workers employment in Korean companies. To improve our national enterprise's work outcome, it is necessary to establish a rational employment management policy plan so that the Korea can promote influx of foreign workers who have appropriate job skills and are hard-working and well suited for cultural environment. Accordingly, the companies need to develop the program by considering following. First, the duty of skilled foreign workers for employment is an important determinant factor and thus the targeting for foreign workers is necessary to proceed with pre-paced training. Second, reflecting the cultural characteristics of migrant workers, a cultural adjustment program needs to be developed. In this regard, the national program of screening foreign workers at the government level and the adaptation program needs to be launched suitable for local environment.

  • PDF