• Title/Summary/Keyword: Size system

Search Result 13,442, Processing Time 0.041 seconds

Effect of Mechanical Milling Parameters on the Particle Size of Silver Flake (은 플레이크 분말의 입자크기에 미치는 기계적 밀링 공정변수의 영향)

  • Lee, Gil-Geun;Jeong, Hae-Young
    • Journal of Powder Materials
    • /
    • v.21 no.4
    • /
    • pp.307-312
    • /
    • 2014
  • This study is focused on investigating the relation between the particle size of silver flake powder and mechanical milling parameters. Mechanical milling parameters such as ball size, impeller rotation speed and milling time of the attrition ball-mill were controlled to produce silver flake powder. The particle size of the silver flake powder increased with increasing ball size and impeller rotation speed. The change of the particle size of the silver flake powder with mechanical milling parameters was analyzed based on balls motion in the mill container of the attrition ball-mill. The silver flake particles were formed at the elastic deformation area of the ball due to the collision between balls. The change of the particle size of the silver flake powder with mechanical milling parameters well consists with the change of the collision energy of ball with parameters mentioned above.

A Case Study of an Optimum Lot Size of Press Line (프레스 라인 적정 로트 크기의 결정에 관한 사례 연구)

  • Kim, Yearn-Min
    • IE interfaces
    • /
    • v.24 no.3
    • /
    • pp.241-247
    • /
    • 2011
  • This paper develops a mathematical model which searches an optimum lot size of a press line, and applies this model to the scheduling of the press line. This mathematical model is not a widely studied cost model but a model which considers the utilization of the press line under a lean production system. In this paper, the optimum lot size is a minimum lot size which does not exceed the total work time of the press line. A production volume and the priority of the production in the press line are adjusted using this optimum lot size. A mathematical model developed in this paper will allow determining the optimum lot size easily in case of variable production environments such as an introduction of a new product and a fluctuation of production volume of each item. Therefore, our model will make a better scheduling of the press line and will enhance the utilization of it.

A study on Determination of the Optimum Farm size based on Shadow Price of Rice (잠재가격에 의한 수도작 적정 영농규모 결정에 관한 연구)

  • Park, Jae Keun;Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.32 no.2
    • /
    • pp.127-150
    • /
    • 2005
  • Under the WTO system, the farm size expansion or the existing korean agricultural structure should be improved to cope with farm income decrease and to continue rice cultivation for food security in the future. This study is aimed at identifying optimum farm size under trade liberalization and import and export parity price system of inputs and outputs. The optimum farm size expressed the minimum point of long run average cost is determined as 15.1ha. The farm size to be equalized as urban laborer's income of 37,361 thousand won per year was revealed 30ha. Therefore the G't recommended farm size of 6ha should be changed to 30ha and the concerned policies for agricultural structure improvement also should be changed to more flexibilitiy.

  • PDF

An Analysis of the Group Decision Making for the Development of a Korean Group Support System: The Field Experiment using Office Workers (우리나라 Group Support System 개발을 위한 집단 의사 결정 특성 분석: 사무실 근로자들을 대상으로 한 실험 연구)

  • Chun, Ki-Jeong
    • Asia pacific journal of information systems
    • /
    • v.9 no.1
    • /
    • pp.143-163
    • /
    • 1999
  • This study investigates the effect of group size on group performance, here the quality of group decision, Four effects are proposed and tested in a field experimental setting : (1) the relationship between the group size and the distribution of individual's problem-solving ability ; (2) the change of the group decision quality as group size increases ; (3) the relationship between the group decision quality and the quality of the best/worst member as group size increases ; (4) the relationship between the group decision quality and the average quality of individuals in the group as group size increases. Data showed that contrary to the exiting results, group decision quality was not improved with the group size. Rather, it showed a little tendency that group decision quality was worsened with the group size. Data also showed that consensus-oriented group decision making process produced the compromised output. Thus, group decision quality was not better than the average group members'. The opinion of the best member was not accepted. The implications of the findings are discussed for the development of a Korean GSS.

  • PDF

Development of Algorithm for Fault Diagnosis (고장진단 알고리즘 개발)

  • Seo, Gyu-Seok;Ok, Chi-Yun;Baek, Young-Sik;Kim, Jung-Nyun
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.248-250
    • /
    • 2003
  • Recently, electric power system's situation grows gradually so Fault Diagnosis is being complicated and is felt difficult. And ability that operator who is using electric power system must do correct judgment of power system state, and can cope at fault of power system state is required. Therefore, large size power system is divided into predefined minimum module, and define each module accident type. We use and compare defined accident type, we can know easily accident that happen forward. Therefore, large size power system using module that is defined to each section common accident type search in this paper. Therefore, large size power system using module that is defined to each section, we search for common accident type. And when accident in electric power system happens, I wish to explain about process that can do fault diagnosis in more easy and fast time, because using accident type that it is verified in front.

  • PDF

A Study on the Automatic Inspection System using Invariant Moments Algorithm with the Change of Size and Rotation

  • 이용중
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.164-169
    • /
    • 2003
  • The purpose of this study is to develop a practical image inspect ion system that could recognize it correctly, endowing flexibility to the productive field, although the same object for work will be changed in the size and rotated. In this experiment, it selected a fighter, rotating the direction from 30$^{\circ}$ to 45 simultaneously while changing the size from 1/4 to 1/16, as an object inspection without using another hardware for exclusive image processing. The invariant moments, Hu has suggested, was used as feature vector moment descriptor. As a result of the experiment, the image inspect ion system developed from this research was operated in real-time regardless of the chance of size and rotation for the object inspection, and it maintained the correspondent rates steadily above from 94% to 96%. Accordingly, it is considered as the flexibility can be considerably endowed to the factory automat ion when the image inspect ion system developed from this research is applied to the product ive field.

  • PDF

Development of A Pneumatic Actuation System with Damping Pist (감쇄피스톤을 이용한 공압구동장치 설계)

  • 문의준
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1987.10b
    • /
    • pp.370-375
    • /
    • 1987
  • Damping piston with an orifice in the piston head is utilized to improve the damping characteristics of a pneumatic push-push type rotary actuator. Through linearized analysis, the optimum size of orifice, which gives maximum damping effect at the frequency where damping is desired. most, is predicted. The frequency response test of teal system were carried out to see the effects of damping piston and to obtain true optimum size of orifice by trying orifices of various size near the predicted value. During the tests, both air and helium were tried as working fluid, and a lag-lead compensation circuit was incorporated to improve system dynamics. The finally chosen orifice size is a little bigger than that predicted from analysis, however it gives high damping effects for the finally designed pneumatic system enough to have wide frequency response bandwidth.

  • PDF

Balking Phenomenon in the $M^{[x]}/G/1$ Vacation Queue

  • Madan, Kailash C.
    • Journal of the Korean Statistical Society
    • /
    • v.31 no.4
    • /
    • pp.491-507
    • /
    • 2002
  • We analyze a single server bulk input queue with optional server vacations under a single vacation policy and balking phenomenon. The service times of the customers as well as the vacation times of the server have been assumed to be arbitrary (general). We further assume that not all arriving batches join the system during server's vacation periods. The supplementary variable technique is employed to obtain time-dependent probability generating functions of the queue size as well as the system size in terms of their Laplace transforms. For the steady state, we obtain probability generating functions of the queue size as well as the system size, the expected number of customers and the expected waiting time of the customers in the queue as well as the system, all in explicit and closed forms. Some special cases are discussed and some known results have been derived.

The Economic Design of the Multi-stage Distribution System Using Different Supplier according to Order Size (주문크기에 따라 다른 공급처를 이용하는 다단계 물류시스템의 경제적 설계)

  • 장석화
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.1
    • /
    • pp.85-94
    • /
    • 2003
  • In this paper, a mathematical model is developed for economic design of multi-stage distribution system that consists of factory, central distribution centers, local distribution centers and retailers. The retailers are supplied products from different stage suppliers according to order size. The retailers are supplied products from factory if demand amount is large, central distribution center if medium, local distribution center if small. The economic design is to determine the economic size of facility factors that consist of distribution system. The cost factors are transportation cost from supply places to demand places, handling cost at distribution centers and inventory holding cost at retailers. It is to determine the transportation route of each retailer, the size and number of the vehicle at factory and distribution centers, the handling amount at distribution centers in order to minimize the total costs. The mathematical model is represented, the solution procedure is developed, and a numerical example is shown.

Selection of Optimal Location and Size of Distributed Generation Considering Power Loss (전력손실을 고려한 분산전원의 최적 위치 및 용량 선정)

  • Lee, Soo-Hyoung;Park, Jung-Wook
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.4
    • /
    • pp.551-559
    • /
    • 2008
  • Increase in power consumption can cause a serious stability problem of an electric power system without construction of new power plants or transmission lines. Also, it can generate large power loss of the system. In costly and environmentally effective manner to avoid constructing the new infrastructures such as power plants and transmission lines, etc, the distributed generation(DG) has paid great attentions so far as a solution for the above problem. Selection of optimal location and size of the DG is the necessary process to maintain the stability and reliability of existing system effectively. However, the systematic and cardinal rule for this issue is still open question. In this paper, the method to determine optimal location of the DG is proposed by considering power loss when the DG is connected to an electric power grid. Also, optimal size of not only the corresponding single DG but also the multi-DGs is determined with the proposed systematic approach. The IEEE benchmark 30-bus test system is analyzed to evaluate the feasibility and effectiveness of the proposed method.