1 |
Moon, S., .U, Sun, J. W., Lee, S.,Cha, C. N., Han, K. H., Hong, S. P., and Hwang, H. (1996), Production Planning and Scheduling System Development for Vehicle Side Frame Process, IE Interface, 9(2).
|
2 |
Robinson, Powell, Arunachalam Narayanan, Funda Sahin (2009), Coordinated deterministic dynamic demand lot-sizing problem : A review of models and algorithms, Omega, 37, 3-15.
DOI
ScienceOn
|
3 |
Shmanske, S. (2003), JIT and the Complementarity of Buffers and Lot Size, American Business Review, 21(1), 100-106.
|
4 |
Zangwill, W. I. (1987), From EOQ towards ZI, Management Science, 33(10), 1216-1223.
|
5 |
Askin, R. G. and Goldberg, J. B. (2002), Design and Analysis of Lean Production Systems, Wiley.
|
6 |
Jamshidi, H. (2005), Lean Manufacturing and Formation of Production Cycles with the Wagner-Whitin Algorithm, The Journal of Global Business Issues, 3(1).
|
7 |
Ha, Y. H., U, S. B., An, H. S., Han, H. S., and Park, Y. J. (2003), An Implementation of the Production Sequence Module in Automobile Production Scheduling Sysemm using Constraint Satisfaction Method, IE Interface, 16(3).
|
8 |
Hopp and Spearman (2000), Factory Physics, 2nd, Ed., McGrawHill.
|
9 |
Jans, R. and Degraeve, Z. (2008), Modeling industrial lot sizing problems : a review, International Journal of Production Research, 46(6), 1619-1643.
DOI
ScienceOn
|