• Title/Summary/Keyword: Single Supply

Search Result 1,056, Processing Time 0.031 seconds

Analysis of Input Characteristic in the Rectifier for Output Filter with Unbalanced Supply Voltages (불평형 전원전압을 갖는 정류시스템에서 출력필터에 따른 입력 특성 분석)

  • Kang, Su-Heon;Kim, Sang-Hoon
    • Journal of Industrial Technology
    • /
    • v.25 no.B
    • /
    • pp.195-202
    • /
    • 2005
  • The rectifier characteristics and the quality of the input current worsens with the increase of unbalances or harmonics of the supply voltages. Rectifier input current harmonics interfere with proper power system operation, reduce rectifier power factor, and limit the power available from a given source. It is of importance to select appropriately the rectifier's output filter inductance to determine the rectifier input current waveform, the input current harmonics, and the power factor. This paper presents a quantitative analysis of single and three phase rectifier input current harmonics, total harmonic distortion, and power factor as a function of the output filter inductance under balanced and unbalanced conditions. Also, its performance under the supply voltage including harmonics be investigated. These results provide a reference for selecting reasonable rectifier's output filter inductance for given harmonics or power factor criterion.

  • PDF

A Study on the Planning Characteristics of Infill System for Long Life Housing Applied with MC Design (MC설계를 적용한 장수명주택 인필의 계획특성에 관한 연구)

  • Wang, Woo-Chul;Lim, Seok-Ho
    • Journal of the Korean housing association
    • /
    • v.27 no.1
    • /
    • pp.63-70
    • /
    • 2016
  • Domestic apartment housing has been designed in accordance with the new housing supply-driven policies for a long time. As a result, its design, material production, construction, maintenance and remodeling process, rather than being systematically performed, were individually approached to cause insufficient linkage between technologies. For these problems and the supply of long life housing, active research on long life housing has been conducted in Korea since 2005. However, the existing research on long life housing has been focused on a single item with no connection made between infill systems, and no overall interface rule, resulting in no activation of the business. In this study, for the supply and activation of long life housing, we aim to analyze the problems of existing long life housing to set up its matching standards for infill systems.

A Scheduling Problem for Production-Delivery in a Supply Chain (생산 및 배송을 위한 공급사슬망에서의 일정계획에 관한 연구)

  • Yoon, Sang-Hum;Lee, Ik-Sun
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.31 no.4
    • /
    • pp.35-47
    • /
    • 2006
  • This paper considers an integrated scheduling problem for consecutive production and delivery stages in a two-stage supply chain. The Production is performed on a single facility and then the finished products are delivered to the customer by capacitated multiple vehicles. The objective of this paper is to obtain job sequencing and delivery batching minimizing the total cost of the associated WIP inventory, finished product inventory and delivery. The inventory cost is characterized by the sum of weighted flowtime. The delivery cost is proportional to the required number of delivery batches. Some polynomial-solvable cases are derived. For the general case, two efficient heuristic algorithms are suggested, and then the heuristics are tested through some numerical experiments.

Uninterruptible Power Construction Techniques for Changing Single Power Grid to Double Power Grid (사업장 구내 단일 전력계통 이중화시설 무정전 시공기법)

  • Jeong, Han-Sang;Byeon, Il-Hwan;Kim, Woo-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2114-2115
    • /
    • 2011
  • 한국수자원공사는 설립목적에 따라 양질의 생활 및 공업용수를 수용가에게 안정적으로 공급하기 위해 중요시설에 대해서는 예비 또는 이중화를 구축하고 있다. 전기부문에서는 주요사업장의 전력수급 안정성을 높이기 위해 한전으로부터 2회선 수전체계를 구축하고 구내 수전계통 전력설비는 이중화하고 있다. 그리고 이와 같이 전력설비 이중화 공사를 추진시 수용가에 대한 피해를 최소화하기 위해 용수공급의 중단 없이 즉 단수 없이 작업을 해야 되는 경우가 많아 사업장의 특성을 감안한 다양한 무정전 시공법을 개발 적용하고 있다.

  • PDF

Demand Variability Impact on the Replenishment Policy in a Two-Echelon Supply Chain Model (두 계층 공급사슬 모형에서 발주정책에 대한 수요 변동성 영향)

  • Kim Eungab
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.29 no.3
    • /
    • pp.111-127
    • /
    • 2004
  • We consider a supply chain model with a make-to-order production facility and a single supplier. The model we treat here is a special case of a two-echelon inventory model. Unlike classical two-echelon systems, the demand process at the supplier is affected by production process at the production facility as well as customer order arrival process. In this paper, we address that how the demand variability impacts on the optimal replenishment policy. To this end, we incorporate Erlang and phase-type demand distributions into the model. Formulating the model as a Markov decision problem, we investigate the structure of the optimal replenishment policy. We also implement a sensitivity analysis on the optimal policy and establish its monotonicity with respect to system cost parameters.

Distribution Planning for Capacitated Supply Chains Using Tabu Search Approach (타부 탐색을 이용한 생산능력 제한하의 공급망 분배계획)

  • Kwon, Ick-Hyun;Baek, Jong-Kwan;Kim, Sung-Shick
    • IE interfaces
    • /
    • v.18 no.1
    • /
    • pp.63-72
    • /
    • 2005
  • In this paper, we present a distribution planning method for a supply chain. Like a typical distribution network of manufacturing firms, we have the form of arborescence. To consider more realistic situation, we investigated that an outside supplier has limited capacity. The customer demands are given in deterministic form in finite number of discrete time periods. In this environment, we attempt to minimize the total costs, which is the sum of inventory holding and backorder costs over the distribution network during the planning horizon. To make the best of the restricted capacity, we propose the look-ahead feature. For looking ahead, we convert this problem into a single machine scheduling problem and utilize tabu search approach to solve it. Numerous simulation tests have shown that the proposed algorithm performs quite well.

Stochastic Programming for the Optimization of Transportation-Inventory Strategy

  • Deyi, Mou;Xiaoqian, Zhang
    • Industrial Engineering and Management Systems
    • /
    • v.16 no.1
    • /
    • pp.44-51
    • /
    • 2017
  • In today's competitive environment, supply chain management is a major concern for a company. Two of the key issues in supply chain management are transportation and inventory management. To achieve significant savings, companies should integrate these two issues instead of treating them separately. In this paper we develop a framework for modeling stochastic programming in a supply chain that is subject to demand uncertainty. With reasonable assumptions, two stochastic programming models are presented, respectively, including a single-period and a multi-period situations. Our assumptions allow us to capture the stochastic nature of the problem and translate it into a deterministic model. And then, based on the genetic algorithm and stochastic simulation, a solution method is developed to solve the model. Finally, the computational results are provided to demonstrate the effectiveness of our model and algorithm.

Design of Voltage Controller of DVR based on DSP (DSP를 기반으로한 DVR의 전압제어기 구현)

  • Lee won-sun;Kim soo-gon;Lim Byung-Kuk;Jeon hee-Jong
    • Proceedings of the KIPE Conference
    • /
    • 2004.07b
    • /
    • pp.566-569
    • /
    • 2004
  • The recent growth in the use of impactive and nonlinear loads, electronic devices sensitive to power quality has caused many power quality problems. Recently, in power system, not only the reliability of the power supply but also the DVR(Dynamic Voltage Restorer) are being studied more and more. The DVR is a series compensator which can instantaneously compensate a voltage variation in supply side, and is a more effective than a existing UPS(Uninterruptible Power Supply) which can be only used in limited range of loads such as single load. Hence, in this paper, a study of inverter side L-C filter output Voltage for DVR is discussed.

  • PDF

A review of the train position detection method for neutral section with energized condition (무절연구간을 위한 열차위치검지방식 검토)

  • Lee, Tae-Hoon;Lee, See-Bin;Hong, Hyun-Pyo;Lee, Hee-Soon;Park, Ki-Bum
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1100-1105
    • /
    • 2010
  • The high speed line and conventional line are a single-phase AC feeding system; and power supplies of different phases meet at SS(SubStation)s or SP(Sectioning Post)s. These sections should be negotiated with the main circuit breaker in the traction vehicle switched off, whereby the length of the neutral zone prevents the pantographs shunting adjacent overhead line section. In order for electric railway vehicles to make power running there, there must be a power supply changeover section (approx. for 1km), where a changeover switch changes a power supply to the other power supply of a train running direction sequentially. For a thorough changeover switching control, the precise train position detection is necessarily required. In this paper, to realize the ground-based train position detection method, configuration scheme of train position detection equipment is suggested by using track circuit and axle counter.

  • PDF

Influence of a simple fracture intersection on density-driven multiphase flow

  • Seong-Hun, Ji;M.J., Nicholl;R.J., Glass;Gang-Geur, Lee
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2004.09a
    • /
    • pp.89-92
    • /
    • 2004
  • The influence of a single fracture intersection on density-driven immiscible flow is compared between wetting (water into air) and nonwetting (Trichloroethylene into water) flows. At low supply rates, the intersection acted as a hysteretic gate to pulsed flow of the wetting phase, but had minimal influence on nonwetting phase flow. For both cases, increasing the supply rate led to the formation of continuous fluid tendrils that crossed the intersection without interruption. The wetting experiment returned to pulsed flow as the supply rate was decreased, while the nonwetting experiment maintained a continuous flow structure. Results suggest a fundamental difference between wetting and nonwetting phase flows in fracture network.

  • PDF