• Title/Summary/Keyword: Shipbuilding Process

Search Result 431, Processing Time 0.028 seconds

Decision Supporting Methodology and System Based on Theory of Constraints for Optimal Product Portfolio Strategy in Shipbuilding Industry (제약이론을 기반으로 한 최적제품조합 의사결정 지원 방법론 및 시스템)

  • Kim, In-Il;Han, Seong-Hwan;Kwon, Min-Chull
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.3
    • /
    • pp.362-371
    • /
    • 2009
  • Shipbuilding is a typical 'build to order' industry. It has a business model that generates revenues from building various ships and offshore products in accordance with owner's requirements at each production stage. Under uncertainty in shipping market, it is very essential for the shipbuilder to prepare the fast and competitive decision for product portfolio strategy in order to maximize contribution margin by exploiting production facilities and constraints. In this study, we introduce the unique decision supporting methodology for the optimal product portfolio sets based on Theory of Constraints(TOC). This methodology is established by adopting the concept of Drum Buffer Rope(DBR) in constraints planning and Throughput Accounting (TA) in management accounting of TOC. In addition, Decision Supporting System(DSS) is implemented. This DSS system provides a throughput estimator with reflecting the cost structure of shipbuilding industry and a resource simulator built on heuristic algorithms to operate major constraint-resources in shipyard such as dock, quay and pre-erection area etc. Several examples are presented to show that the proposed methodology and system can effectively support the strategic decision-making process of a global shipbuilding company.

Development of Multi-pass Welding Method for Lifting Lug by Robot Weaving (로봇 위빙에 의한 리프팅 러그 다층 용접법 개발)

  • Kim, Young-Zoo;Kim, Kang-Uk;Kim, Suk-Hyoung;Kang, Sung-Won;Kim, Soo-Ho
    • Journal of Welding and Joining
    • /
    • v.25 no.6
    • /
    • pp.44-52
    • /
    • 2007
  • A welding process of a lifting lug for lifting heavy objects is one of the important welding processes directly related to the safety in shipbuilding. Welding a lifting lug is done in the manually and takes about forty minutes. Working environment for the lifting lug welding is very poor due to an radiant heat and a harmful fume. The purpose of this study is to develop methods of multi-pass welding using the lifting lug welding robot system. This study shows robot welding methods to achieve proper corner, straight and connection welding and an effectiveness of application.

Digital Manufacturing based Modeling and Simulation of Production Process in Subassembly Lines at a Shipyard (디지털 생산을 기반으로 한 조선 소조립 공정 모델링 및 시뮬레이션)

  • 이광국;신종계;우종훈;최양렬;이장현;김세환
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2003.11a
    • /
    • pp.185-192
    • /
    • 2003
  • Digital Manufacturing-based production could be very effective in shipbuilding in order to save costs and time, to increase safety for workers, and to prevent bottleneck processes in advance. Digital shipbuilding system, a simulation-based production tool, is being developed to achieve such aspects in Korea. To simulate material flow in a subassembly line at a shipyard, the product, process and resources was modeled for the subassembly process which consisted of several sub-processes such as tack welding, piece alignment, tack welding, and robot welding processes. The analysis and modeling were carried out by using the UML(Unified Modeling Language), an object-oriented modeling method as well as IDEF(Integration DEFinition), a functional modeling tool. Initially, the characteristics of the shop resources were analyzed using the shipyard data, and the layout of the subassembly line was designed with the resources. The production process modeling of the subassembly lines was performed using the discrete event simulation method. Using the constructed resource and process model, the productivity and efficiency of the line were investigated. The number of workers and the variations In the resource performance such as that of a new welding robot were examined to simulate the changes in productivity. The bottleneck process floated according to the performance of the new resources. The proposed model was viewed three-dimensionally in a digital environment so that interferences among objects and space allocations for the resources could be easily investigated

  • PDF

An Implementation Case of Ergonomics Program at a Shipbuilding Company (조선회사 인간공학 프로그램의 운용사례)

  • Pyo, Yeon;Jeong, Byung-Yong
    • Journal of the Ergonomics Society of Korea
    • /
    • v.26 no.3
    • /
    • pp.45-52
    • /
    • 2007
  • Shipbuilding workers are potentially exposed to ergonomic hazards in the manufacturing process. The purpose of this study is to describe the impact of an ergonomic intervention and the implementation effect of ergonomics program at a shipbuilding company. This study portrays an implementation procedure of ergonomics program over a period of two years concerning ergonomic hazard analysis and improvement, along with medical management. After implementation of the ergonomics program, the productivity improved, and the rate of accidental incidents decreased, also the loss of workdays decreased largely. The implementation effect of ergonomics program presented in this study can be used to provide baseline information for the prevention of musculoskeletal disorders in the shipbuilding industry.

A Study on the Development of Rescheduling Procedure for Shipbuilding Master Production Schedule (조선 기준일정계획을 위한 재계획 절차의 개발)

  • Park, Ju-Chull;Hwang, Ha-Yong
    • IE interfaces
    • /
    • v.11 no.3
    • /
    • pp.129-141
    • /
    • 1998
  • In this paper, a rescheduling procedure is developed for shipbuilding master production schedule. Shipyard initially develops backward production schedules for the entire shipbuilding process, and then refines the schedule by stage. The rescheduling procedure of this paper tries to resolve the schedule discrepancies between the outdoor backward schedule and the refined indoor schedule. Through the proposed rescheduling procedure, outdoor schedule can be successfully adjusted using buffer days and duration reduction. An Object-oriented program is also developed to automate the procedure. We can observe the improvement on productivity and quality of rescheduling works from the application of the developed procedure.

  • PDF

A Study on the Application of Line Array Roll Set Process to Shipbuilding Industry (선형 배열 롤 셋 공정의 조선 산업 적용에 관한 연구)

  • Shim, D.S.;Yang, D.Y.;Chung, S.W.;Han, M.S.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2009.10a
    • /
    • pp.289-292
    • /
    • 2009
  • The line array roll set process, as one of many kinds of incremental forming processes, is a continuous process in which a flat metal plate is formed into a singly or doubly curved plate through successive passes of forming rolls. It was found that the curvature level of the formed plates in the previous study was well over the curvature required in shipyards. This fact shows that the LARS method has considerable potential for shipbuilding applications. In a shipbuilding yard, hull forming is an important fabrication process in which flat plates are deformed into singly or doubly curved plates. The major purpose of the present study is to estimate experimentally the general applicability of the line array roll set process for the manufacture of ship hull plates. In this study, the target shapes are selected through investigation of the shape classification of ship hull plates that comprise a certain vessel. Forming processes for twisted shapes are analyzed with the finite element method (FEM). Finally, the results of experimental work for two types of target shapes are presented.

  • PDF

Engineering Process Management System for Commercial ship Design (상선 설계를 위한 엔지니어링 프로세스 관리 시스템)

  • Park, Kwang-Phil;Suh, Heung-Won;Lee, Sung-Geun
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2007.09a
    • /
    • pp.57-67
    • /
    • 2007
  • As the competition among commercial shipyards gets more intense and the number of ships to be designed is increasing significantly, the state is that engineering work volume has increased proportionately. Under these conditions, various attempts have been tried to improve performance in design activities and it has come to a vital issue as to how the design process should be managed and conducted in more efficient manner. To achieve this goal, an engineering process management system has been developed, named 'DSME Engineering Wizard System'. It aims to accelerate process performance by managing execution, promoting collaboration and maximizing engineering data reusability based on workflow concept. For the application of this system, Marketing Design which is one of the major processes for commercial ship design was analyzed and established into a unique workflow template consisting of activities, getting design experiences organized into a best practice in which engineering tasks are performed in the way proven most efficient.

  • PDF

Strategy Planning of Digital Shipbuilding Simulation byWorkflow Analysis of Production Planning in a Shipyard (조선소 생산계획 업무 프로세스 분석을 통한 디지털 선박생산 시뮬레이션 적용 전략 수립)

  • Lee, Kwangkook
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.8
    • /
    • pp.1761-1768
    • /
    • 2013
  • Digital shipbuilding is a technology to reduce the total cost and lead time inevitably made by reschedule and rework in a shipyard. Strategic planning should be undertaken in order to have an effect on the applicable field. We aim at planning a strategy of digital shipbuilding technology by analysis of production planning workflow in this paper. In the basis of BPR methodology, the as-is business process is analyzed to build an workflow model, and derive the bottleneck business process. We dig into the inside details of the process to illustrate an diagram of the core improvement opportunities, and perform process simulation not only to create the application scenarios but also to expect the main effects. The application strategy will make a basic sketch to save both the production cost and time for high quality products in the shipyards.

Weld Characteristic Analysis for Weld Process Variables of Tip-Rotating Arc Welding in Butt Joint of Shipbuilding Steels (조선용 강재의 맞대기 이음에서 팁회전 아크 용접의 공정 변수에 따른 용접 특성 분석)

  • Lee, Jong Jung;Ahn, Sang Hyun;Park, Young Whan
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.20 no.7
    • /
    • pp.105-112
    • /
    • 2021
  • Reduction of weld distortions and increase in productivity are some of the major goals of the shipbuilding industry. To address these issues, many researchers have attempted to apply new welding processes. In the shipbuilding industry, steel is the candidate material of choice owing to its good weldability. However, conventional welding techniques are not feasible for avoiding welding problems. Tip-rotating arc welding is one of the high-efficiency welding process that has several advantages, such as high welding speed, high melting rate, low heat input, and less distortion. The present study investigates the influence of the welding variables on the weld characteristics of tip-rotating arc welding. Welding was performed using EH36 as the base metal and SM-70s as the filler metal, which are widely used in shipbuilding. Basic experiments were conducted to understand the effects of the major welding variables, such as welding and tip-rotating speeds. The distortion and mechanical properties of the optimal welding conditions were used to evaluate the tip-rotating arc welding performance. Consequently, the feasibility of the tip-rotating arc welding process for joining steel components was investigated, so that the optimized welding conditions could be applied directly to ship body welding to enhance the quality of the welded joints.

A Study on the Spatial Features of Shipbuilding Subcontract Structures (조선산업 하청구조의 공간 특성에 관한 연구)

  • 우연섭
    • Journal of the Korean Geographical Society
    • /
    • v.39 no.1
    • /
    • pp.116-131
    • /
    • 2004
  • The purpose of this study is to inquiry spatial features of shipbuilding subcontract structures. These days, firms are trying to get their goals by wav of production system which is related to other firm. Shipbuilding subcontract structures which builds complex and grand plant show a different peculiarity according to spatial features having rules of business relations with contracting firms. First of all, internal subcontracting firms which takes part in the production process of contracting firm and shipbuilding cooperative complex firms which showing a peculiarity of spin-off firms are closely related with contracting firm. And firms in Changwon that have a specialized with machine industry and those of Busan that have made development in marine equipment industries traditionally are connected with subcontract relations because of a high level of specialization relatively. On the other hand, subcontracting firms which range from non-localized and provide standardized products are less connected with contracting firm. In order to develop of Korea' shipbuilding industry, first, close cooperative relation is important with subcontracting firms which concentrate internal and outside contacting firm. And, it is necessary to strengthen selective business relations with far distance firms which are specialized in technology.