Browse > Article
http://dx.doi.org/10.6109/jkiice.2013.17.8.1761

Strategy Planning of Digital Shipbuilding Simulation byWorkflow Analysis of Production Planning in a Shipyard  

Lee, Kwangkook (Department of Naval Architecture & Ocean IT Engineering, Kyungnam University)
Abstract
Digital shipbuilding is a technology to reduce the total cost and lead time inevitably made by reschedule and rework in a shipyard. Strategic planning should be undertaken in order to have an effect on the applicable field. We aim at planning a strategy of digital shipbuilding technology by analysis of production planning workflow in this paper. In the basis of BPR methodology, the as-is business process is analyzed to build an workflow model, and derive the bottleneck business process. We dig into the inside details of the process to illustrate an diagram of the core improvement opportunities, and perform process simulation not only to create the application scenarios but also to expect the main effects. The application strategy will make a basic sketch to save both the production cost and time for high quality products in the shipyards.
Keywords
Digital shipbuilding; Production planning; Workflow analysis; Process simulation;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 H. J. Hwang, I. Y. Gong, "Integrated production simulation framework for shipbuilding and offshore industry", Bulletin of the Society of Naval Architects of Korea, Vol.48, No.4, pp.4-9, 2011.
2 S. H. Kang, "Introduction to Industrial Engineering", Youngji Publishers, 2002.
3 J. H. Yu, R. S. Lim, H. K. Kim, "Digitalization of Shipbuilding Industry", Bulletin of the Society of Naval Architects of Korea, Vol. 48, No. 4, pp. 40 43, 2011.
4 K. Y. Kim, S. D. Noh, "Workflow Analysis of Product Development in the Automotive and Shipbuilding Industries using BPR Methodology and Comparison Study on the Application of Digital Virtual Manufacturing", Proceedings of the Society of CAD/CAM Engineers Conference, pp.653-657, 2007.
5 J. M. Kim, D. S. Lim, H. S. Ham, "Development direction of IT based ship total solution technology", Information and Communications Magazine, Vol. 25, No. 6, 2008. 6.
6 J. G. Shin, J. H. Lee, J. H. Woo, "Concept of Digital Shipbuilding", Bulletin of the Society of Naval Architects of Korea, Vol.38, No.1, pp. 54-62, 2001.
7 K. Y. Kim, T. K. Park, S. K. Noh, S. D. Hahn, J. G. Shin, "Workflow Analysis of Shipbuilding for Digital Virtual Manufacturing", Proceedings of the Society of CAD/CAM Engineers Conference, pp.1-6, 2005.
8 Gregoriades, A. and Sutcliffe, A., "A Socio- technical Approach to Business Process Simulation", Decision Support Systems, Vol. 45, No.4, pp.1017- 1030, 2008.   DOI   ScienceOn
9 S. Y. Park, K. H. Kim, J. H. Kim, J. J. Kim "Analysis of Business Process for Customizing Interior Design Introducing BIM", Journal of KIBIM, Vol. 2, No. 1, pp.18-26, 2012.   과학기술학회마을
10 M. J. Son, T. W. Kim, "High-level Discrete-event Modeling-based Business Process Simulation for the Scheduling of the Ship Hull Production Design", Transactions of the Society of CAD/CAM Engineers, Vol. 18, No. 3, pp. 224-233. June 2013.   DOI   ScienceOn
11 Lee, J. M., "An Integrated Process and Measurement Framework for Planning Production of Large Shipyards", Ph.D. Thesis, Seoul National University, 2007.
12 CIMData, "The Benefits of Digital Manufacturing", A CIMdataWhite Paper, pp.1-7, Mar. 2003.