• Title/Summary/Keyword: Settlement stability

Search Result 361, Processing Time 0.029 seconds

Evaluation of Stability for Settlement Free Reinforced Earth Retaining Wall by Centrifuge Model Tests (원심모형실험에 의한 침하자유형 보강토 옹벽의 안정성 평가)

  • Ahn, Kwangkuk;Bae, Wooseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.6
    • /
    • pp.23-34
    • /
    • 2006
  • In this study, the centrifugal tests were performed to evaluate the behavior of reinforced retaining wall that allows the settlement of reinforcement strip. To analyze the stability of reinforced retaining wall, which drives the settlement of reinforcement strip, the results were compared with the conventional reinforced retaining wall. In the centrifugal tests, the aluminum plate for the face was used and the aluminum foil was used as a reinforcement. The decomposed granite soil was adopted as a backfill. As a result, the settlement free reinforced retaining wall reached to the failure at 80g-level. In contrast, the conventional reinforced retaining wall was collapsed at 69g-level. It means that the settlement free reinforced retaining wall has the stronger stability than the conventional reinforced retaining wall. Also, vertical earth pressure of the settlement free reinforced retaining wall near the base of wall was higher 16% than that of the conventional reinforced retaining wall.

  • PDF

The Characteristic of Track Settlement : State of the Arts (궤도침하 특성 : State of the Arts)

  • Jang, Sun-Jae;Lim, Nam-Hyoung;Choi, Jin-Yu;Lee, Woo-Chul
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1672-1675
    • /
    • 2008
  • The track is an important component of rail structures. The characteristic of the track settlement must be confirmed in order to evaluate the stability of the track. It is effected by action load and the characteristic of the track material. This study investigates the mechanism of the track settlement and the effect of initial settlement and long-term settlement on the characteristic of the track settlement through literature survey. It tries to observe the future research direction of track settlement.

  • PDF

Estimation of the Roadbed Settlement and Bearing Capacity According to Radius of Curve and Cant in Railroad (철도의 곡선반경 및 캔트에 따른 노반의 침하 및 지지력 산정)

  • Jeon, Sang-Soo;Eum, Gi-Young;Kim, Jae-Min
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.7 no.1 s.24
    • /
    • pp.29-38
    • /
    • 2007
  • The research on the track performance and stability of the tilting-train was performed and the settlement of the roadbed was estimated as the tilting train was being operated on the rail joint under the allowable velocity subjected to the track performance and the stability of the tilting-train. Since the impact on the continuous welded rail (CWR) induced by the tilting-train loading is different from the impact on the rail joint, it needs to investigate the settlement of the roadbed beneath the CWR. In this study, when the tilting-train is being operated on the CWR under the allowable velocity subjected to the track performance and the stability of the tilting-train, the settlement and bearing capacity of the roadbed beneath the CWR have been evaluated using numerical analysis and compared with those beneath the rail joint. The numerical results show that the settlements of the roadbed beneath CWR and rail joint are amount to 71.2% and 88.8% of the allowable settlement, respectively. And the stresses are amount to 10.4% and 12.1% of the allowable bearing capacity, respectively.

Clinical Significance of Radiological Stability in Reconstructed Thoracic and Lumbar Spine Following Vertebral Body Resection

  • Sung, Sang-Hyun;Chang, Ung-Kyu
    • Journal of Korean Neurosurgical Society
    • /
    • v.56 no.4
    • /
    • pp.323-329
    • /
    • 2014
  • Objective : Vertebral body replacement following corpectomy in thoracic or lumbar spine is performed with titanium mesh cage (TMC) containing any grafts. Radiological changes often occur on follow-up. This study investigated the relationship between the radiological stability and clinical symptoms. Methods : The subjects of this study were 28 patients who underwent corpectomy on the thoracic or lumbar spine. Their medical records and radiological data were retrospectively analyzed. There were 23 cases of tumor, 2 cases of trauma, and 3 cases of infection. During operation, spinal reconstruction was done with TMC and additional screw fixation. We measured TMC settlement in sagittal plane and spinal angular change in coronal and sagittal plane at postoperative one month and last follow-up. Pain score was also checked. We investigated the correlation between radiologic change and pain status. Whether factors, such as the kind of graft material, surgical approach, and fusion can affect the radiological stability or not was analyzed as well. Results : Mean follow-up was 23.6 months. During follow-up, $2.08{\pm}1.65^{\circ}$ and $6.96{\pm}2.08^{\circ}$ of angular change was observed in coronal and sagittal plane, respectively. A mean of cage settlement was $4.02{\pm}2.83mm$. Pain aggravation was observed in 4 cases. However, no significant relationship was found between spinal angular change and pain status (p=0.518, 0.458). Cage settlement was seen not to be related with pain status, either (p=0.644). No factors were found to affect the radiological stability. Conclusion : TMC settlement and spinal angular change were often observed in reconstructed spine. However, these changes did not always cause postoperative axial pain.

Mechanical characteristics + differential settlement of CFG pile and cement-soil compacted pile about composite foundation under train load

  • Cheng, Xuansheng;Liu, Gongning;Gong, Lijun;Zhou, Xinhai;Shi, Baozhen
    • Geomechanics and Engineering
    • /
    • v.20 no.2
    • /
    • pp.155-164
    • /
    • 2020
  • In recent years, the stability, safety and comfort of trains has received increased attention. The mechanical characteristics and differential settlement of the foundation are the main problems studied in high-speed railway research. The mechanical characteristics and differential settlement of the foundation are greatly affected by the ground treatment. Additionally, the effects of train load and earthquakes have a great impact. The dynamic action of the train will increase the vibration acceleration of the foundation and increase the cumulative deformation, and the earthquake action will affect the stability of the substructure. Earthquakes have an important practical significance for the dynamic analysis of the railway operation stage; therefore, considering the impact of earthquakes on the railway substructure stability has engineering significance. In this paper, finite element model of the CFG (Cement Fly-ash Gravel) pile + cement-soil compacted pile about composite foundation is established, and manual numerical incentive method is selected as the simulation principle. The mechanical characteristics and differential settlement of CFG pile + cement-soil compacted pile about composite foundation under train load are studied. The results show: under the train load, the neutral point of the side friction about CFG pile is located at nearly 7/8 of the pile length; the vertical dynamic stress-time history curves of the cement-soil compacted pile, CFG pile and soil between piles are all regular serrated shape, the vertical dynamic stress of CFG pile changes greatly, but the vertical dynamic stress of cement-soil compacted pile and soil between piles does not change much; the vertical displacement of CFG pile, cement-soil compacted pile and soil between piles change very little.

Evaluation of Internal Settlement of Rockfill Dam under Construction (석괴댐의 축조 중 내부 침하 거동 평가)

  • Seo, Min-Woo;Kim, Yong-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.4
    • /
    • pp.45-52
    • /
    • 2010
  • The purposes of this research are to analyze the internal settlement behavior of Concrete Faced Rockfill Dam (CFRD) typed 'D dam' and to evaluate the stability of the 'D dam' during dam construction using internal settlement measurements and results of numerical analysis. The field measurements were obtained during dam construction period. The numerical analysis was also carried out for the same construction period. The numerical analysis focused mainly on prediction of stress and displacement behavior of 'D dam' during dam construction stage using input parameters obtained from laboratory tests, i.e. large triaxial tests. The behavior of 'D dam' was evaluated to be stable from comparing the results of field measurements and numerical analysis. A simple empirical equation is also presented to predict final settlement at the completion of dam construction, using settlement measurement monitored during dam embankment.

Stability Evaluation of Shallow Foundation by Plate Bearing Test (PBT에 의한 직접기초의 안정성 평가)

  • Ki Wan-Seo;Joo Seung-Wan;Kim Sun-Hak
    • The Journal of Engineering Geology
    • /
    • v.15 no.4 s.42
    • /
    • pp.423-433
    • /
    • 2005
  • For the design of spread foundation and the stability evaluation, we compared and analyzed it for theoretical, empirical bearing capacity formulas, and various settlement computation formulas, by conducting the plate bearing test at the site of A and B, which consisted of gneiss weathered soil. In addition, we considered the effective method of stability evaluation by carrying out the plate bearing test carried out on the ground consisted of weathering soil of gneiss. Consequently, it was found out that the allowablebearing capacity by the theoretical formula of Terzaghi was too excessive in comparison with the result of the plate bearing test and the Terzaghi-Peck method, which was used widely domestically in designing the spread foundation. It was more effective for a stable design. As a result of the plate bearing test carried out, on the ground consisted of weathering soil. It was found that reviewing the stability by the bearing capacity calculated with load-settlement curve. It is evaluated in a safer side than the point of view of the settlement.

Reliability Analysis for Optimization of Construction Method of Drain Material (배수재 시공의 최적화를 위한 신뢰성 해석)

  • Ahn, Hyeon-Min;Kim, Moon-Chae;Kim, Daehyeon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.4
    • /
    • pp.87-96
    • /
    • 2014
  • In this paper, reliability analysis was done on the characteristics of consolidation and settlement for the inner temporary dike where a weak ground improvement construction was applied. When the consolidation analysis on the foundation ground was done, the following conclusions were obtained by conducting the stability analysis on the effect of space of drains, the effect of consolidation time, and the residual settlement and differential settlement. When construction was done with a drain space which satisfied 95% probability of reaching a target consolidation in each divided area, the occurrence of a residual settlement was within the range, which did not exceed 10cm. It was shown that there was almost no possibility of the occurrence of differential settlement, which was above the permissible differential settlement slope.

An Evaluation of the Settlement and Stability in the Reclaimed Revetment by Field Monitoring Method (현장계측을 이용한 호안의 침하 및 안정성의 평가)

  • Kim, Hyeong-Ju;Yang, Tae-Seon;Choe, Deok-Chan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1992.10a
    • /
    • pp.149-155
    • /
    • 1992
  • In case of construction of the final refuse disposal site on the ground where 20m soft clay layer is deposited, Sand Compaction Pile(SCP) was driven with a view to increase the strength and reduce the settlement when the reclaimed revetment intend to be constructed first in a short time. Field monitoring method is carried out in order to overcome the problems of settlement and stability in the construction of the reclaimed revetment and the assumed problems in the design of composite ground. In this paper the observed data from monitoring sections are analysed, fedback to the desigh and field, and compared with FEM analysis. Conclusions are as follow: in case of 70% replacement the use of modified soilparameters makes the FEM analysis of SCP possible. In case of 27% replacement, n(stress concentration ratio)=0.2-0.3, B(measured settleme reduction coefficient)=0.43 are evalated. Also, horizontal displacement is remarkably happened around the ground.

  • PDF

Effects of Relief Shelves on Stability of Retaining Walls

  • Ahn, Taebong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.9
    • /
    • pp.25-31
    • /
    • 2022
  • Attaching shelf to retaining structure leads to a decrease in the total lateral earth pressure. This decrease enables the retaining structures to become more stable, to have small displacement, and to exhibit lower bending moments, the relief shelves effects are analyzed using FEM in order to understand how they stabilize cantilever wall in this study. Several models are varied by changing location and width of shelves to realize earth pressure and displacements of retaining wall. The displacement is getting smaller because earth pressure acting on shelf increases as shelves locations are lower and width is longer. The ground settlement variation effects caused by relief shelves are studied also. The ground settlement increases abruptly where shelf location is between of 0.5H and 0.625H, and settlement decreases suddenly where shelf width is between b/h=0.375 and b/h=0.500. The shelf significantly reduces earth pressure and movement of the wall. This decrease in the lateral pressure increases the retaining structure stability.