• Title/Summary/Keyword: Series-Parallel

Search Result 968, Processing Time 0.029 seconds

Analysis of a New Parallel Three-Level Zero-Voltage Switching DC Converter

  • Lin, Bor-Ren;Chen, Jeng-Yu
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.1
    • /
    • pp.128-137
    • /
    • 2015
  • A novel parallel three-level zero voltage switching (ZVS) DC converter is presented for medium voltage applications. The proposed converter includes three sub-circuits connected in parallel with the same power switches to share load current and reduce the current stress of passive components at the output side. Thus, the size of the output chokes is reduced and the switch counts in the proposed converter are less that in the conventional parallel three-level DC/DC converter. Each sub-circuit combines one half-bridge converter and one three-level converter. The transformer secondary windings of these two converters are connected in series in order to reduce the size of output inductor. Due to the three-level circuit topology, the voltage stress of power switches is equal to $V_{in}/2$. Based on the resonant behavior by the output capacitance of power switches and the leakage inductance (or external inductance) at the transition interval, each switch can be turned on under ZVS. Finally, experiments based on a 2 kW prototype are provided to verify the performance of the proposed converter.

Kinematics Analysis of a 2-DOF Parallel Manipulator (2개의 자유도를 가진 병렬 매니퓰레이터의 기구학 해석)

  • Lee, Jong-Gyu;Lee, Sang-Ryong;Lee, Choon-Young;Yang, Seung-Han
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.29 no.1
    • /
    • pp.64-71
    • /
    • 2012
  • In this paper, a parallel manipulator is comprised of two sliders and four links. Sliders execute a linear reciprocating motion depending on parallel guides and make the connected links rotate. A couple of links connected by sliders do coupling motion. The end-effector called a link tip has orientation angle. Through the kinematics analysis of this manipulator, we found displacement, velocity and acceleration using direct and inverse kinematics. We used equations that derived from this analysis and determined five constraint conditions. These conditions had much to do with rotation states of links, the relative relation of link length and coupling motion state. To verify those, we suggest a new algorithm regarding constraint conditions of a manipulator. With the result which performed the algorithm, we found out that operation range of coupled links was limited by relative relation of link length and that manipulator was not able to carry out a series of link motion, in case of being the link vertical between two parallel guides.

Development of Real time Air Quality Prediction System

  • Oh, Jai-Ho;Kim, Tae-Kook;Park, Hung-Mok;Kim, Young-Tae
    • Proceedings of the Korean Environmental Sciences Society Conference
    • /
    • 2003.11a
    • /
    • pp.73-78
    • /
    • 2003
  • In this research, we implement Realtime Air Diffusion Prediction System which is a parallel Fortran model running on distributed-memory parallel computers. The system is designed for air diffusion simulations with four-dimensional data assimilation. For regional air quality forecasting a series of dynamic downscaling technique is adopted using the NCAR/Penn. State MM5 model which is an atmospheric model. The realtime initial data have been provided daily from the KMA (Korean Meteorological Administration) global spectral model output. It takes huge resources of computation to get 24 hour air quality forecast with this four step dynamic downscaling (27km, 9km, 3km, and lkm). Parallel implementation of the realtime system is imperative to achieve increased throughput since the realtime system have to be performed which correct timing behavior and the sequential code requires a large amount of CPU time for typical simulations. The parallel system uses MPI (Message Passing Interface), a standard library to support high-level routines for message passing. We validate the parallel model by comparing it with the sequential model. For realtime running, we implement a cluster computer which is a distributed-memory parallel computer that links high-performance PCs with high-speed interconnection networks. We use 32 2-CPU nodes and a Myrinet network for the cluster. Since cluster computers more cost effective than conventional distributed parallel computers, we can build a dedicated realtime computer. The system also includes web based Gill (Graphic User Interface) for convenient system management and performance monitoring so that end-users can restart the system easily when the system faults. Performance of the parallel model is analyzed by comparing its execution time with the sequential model, and by calculating communication overhead and load imbalance, which are common problems in parallel processing. Performance analysis is carried out on our cluster which has 32 2-CPU nodes.

  • PDF

Equivalent Design Parameter Determination for Effective Numerical Modeling of Pre-reinforced Zones in Tunnel (터널 사전보강 영역의 효과적 수치해석을 위한 등가 물성치 결정 기법)

  • Song, Ki-Il;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.2
    • /
    • pp.151-163
    • /
    • 2006
  • Although various methods for effective modeling of pre-reinforced zones have been suggested for numerical analysis of large section tunnels, tunnel designers refer to empirical cases and literature reviews rather than engineering methods because ones who use commercial programs are unfamiliar with a macro-scale approach in general. Therefore, this paper suggests a simple micro-scale approach combined with the macro-scale approach to determine equivalent design parameters for effective numerical modeling of pre-reinforced zones in tunnel. This new approach is to determine the equivalent stiffness of pre-reinforced zones with combination of ground, bulb, and steel in series or/and parallel. For verification, 3-D numerical results from the suggested approach are compared with those of a realistic model. The comparison suggests that two cases make best approximation to a realistic solution: One is related to the series-parallel stiffness system (hereafter SPSS) in which bulb and steel are coupled in parallel and then connected to the ground in series, and the other is the series stiffness system (hereafter SSS) in which only bulb and steel are coupled in series. The SPSS is recommended for stiffness calculation of pre-reinforced zones because the SSS is inconvenient and time-consuming. The SPSS provides slightly bigger vertical displacement at tunnel crown in weathered rock than other cases and give almost identical results to a realistic model for horizontal displacement at tunnel spring line and ground surface settlement. Displacement trends on weathered rock and weathered soil are similar. The SPSS which is suggested in this paper represents the behavior mechanism of pre-reinforced area effectively.

  • PDF

Comparison of slot sizes and parallelism of metal brackets manufactured through metal injection molding and computerized numerical control

  • Park, Jae-Sung;Song, In-Tae;Bae, Jae-Hee;Gil, Soo-Min;Kang, Kyung-Hwa
    • The korean journal of orthodontics
    • /
    • v.50 no.6
    • /
    • pp.401-406
    • /
    • 2020
  • Objective: To investigate and compare the slot sizes and parallelism of metal injection molding (MIM) and computerized numerical control (CNC) brackets. Methods: The following four MIM bracket series with 0.022-inch (in) slots were selected for investigation: Di MIM mini Twin (Ortho Organizers), Mini Diamond Roth (Ormco), Gemini MBT (3M Unitek), and Formula R Roth (Tomy). The following four CNC bracket series with 0.022-in slots were selected for investigation: Econoline MBT (Adenta), Legend mini MBT (GC Orthodontics), Crown mini MBT (Adenta), and Evolve MBT (DB Orthodontics). The slot dimensions were measured using an optical microscope (XTCam-D310M; Mitutoyo) with a resolution of 1 ㎛. The results were statistically analyzed using one-way analysis of variance and the Tukey post-hoc test with a significance level of 0.05. Results: The results indicated that all the investigated slot sizes were oversized with respect to the manufacturers' specifications (0.022 in). Among the eight bracket series, the Di MIM bracket (MIM) was the most oversized by 10.4%, whereas the Evolve bracket (CNC) was the least oversized by 2.6%. The slots in seven of the bracket series had divergent walls instead of parallel ones. The Evolve bracket alone had parallel slot walls. Conclusions: Regardless of the manufacturing method, all the slot sizes of the brackets investigated in this study were significantly oversized; most of the slot walls were nonparallel, except for those of the Evolve bracket. This study could not establish that the CNC method was more accurate than the MIM method in manufacturing bracket slots.

A Design of Power System Stabilization of TCSC System for Power system Oscillation Damping (전력 시스템의 동요 억제를 위한 TCSC용 안정화 장치 설계)

  • 정형환;허동렬;왕용필;박희철;이동철
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.16 no.2
    • /
    • pp.104-112
    • /
    • 2002
  • In this paper, it is suggested that the selection method of parameter of Power System Stabilizer(PSS) with robustness in low frequency oscillation for Thyristor Controlled Series Capacitor(TCSC) using Geletic Algorithm(GA). A TCSC meddle consists of a stories capacitor and a parallel path with a thyristor valve and a series inductor. Also in in parallel, as is typical with series capacitor applications, is a metal-oxide varistor(MOV) for overvoltage protection. The proposed PSS parameters are optimized using GA in order to maintain optimal operation of TCSC which is expected to be applied in transmission system to achieve a number of benefits under the various operating conditions. In order to verify the robustness of the proposed method, we considered the dynamic response of angular velocity deviation and terminal voltage deviation under a power fluctuation and rotor angle variation.

A SURFACE RECONSTRUCTION METHOD FOR SCATTERED POINTS ON PARALLEL CROSS SECTIONS

  • Kim, Phil-Su
    • Journal of the Korean Society for Industrial and Applied Mathematics
    • /
    • v.9 no.2
    • /
    • pp.29-43
    • /
    • 2005
  • We consider a surface reconstruction problem from geometrical points (i.e., points given without any order) distributed on a series of smooth parallel cross sections in ${\mathbb{R}}^3$. To solve the problem, we utilize the natural points ordering method in ${\mathbb{R}}^2$, described in [18], which is a method of reconstructing a curve from a set of sample points and is based on the concept of diffusion motions of a small object from one point to the other point. With only the information of the positions of these geometrical points, we construct an acceptable surface consisting of triangular facets using a heuristic algorithm to link a pair of parallel cross-sections constructed via the natural points ordering method. We show numerical simulations for the proposed algorithm with some sets of sample points.

  • PDF

Boundary estimation in electrical impedance tomography with multi-layer neural networks

  • Kim, Jae-Hyoung;Jeon, Hae-Jin;Choi, Bong-Yeol;Lee, Seung-Ha;Kim, Min-Chan;Kim, Sin;Kim, Kyung-Youn
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.40-45
    • /
    • 2004
  • This work presents a boundary estimation approach in electrical impedance imaging for binary-mixture fields based on a parallel structured multi-layer neural network. The interfacial boundaries are expressed with the truncated Fourier series and the unknown Fourier coefficients are estimated with the parallel structure of multi-layer neural network. Results from numerical experiments shows that the proposed approach is insensitive to the measurement noise and has a strong possibility in the visualization of binary mixtures for a real time monitoring.

  • PDF

Development of a Novel 3-DOF Hybrid Robot with Enlarged Workspace (확장 작업업영역을 갖는 고속 3자유도 하이브리드 로봇 개발)

  • Jeong, Sung Hun;Kim, Giseong;Gwak, Gyeong Min;Kim, Han Sung
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.5
    • /
    • pp.875-880
    • /
    • 2020
  • In this paper, a novel 3-DOF hybrid robot with enlarged workspace is presented for high speed applications. The 3-DOF hybrid robot is made up of one linear actuator and 2-DOF planar parallel robot in series. The actuation consists of one ball-screw to make one linear motion and two rotary ball-screws to transmit rotational motion to 2-DOF parallel robot. The workspace can be enlarged according to ball-screw stroke and the moving inertia can be reduced due to locating all the heavy actuators at the fixed base. The inverse kinematics and workspace analyses are presented. The robot prototype and PC-based control system are developed.

A Genetic Algorithm for Scheduling Sequence-Dependant Jobs on Parallel Identical Machines (병렬의 동일기계에서 처리되는 순서의존적인 작업들의 스케쥴링을 위한 유전알고리즘)

  • Lee, Moon-Kyu;Lee, Seung-Joo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.25 no.3
    • /
    • pp.360-368
    • /
    • 1999
  • We consider the problem of scheduling n jobs with sequence-dependent processing times on a set of parallel-identical machines. The processing time of each job consists of a pure processing time and a sequence-dependent setup time. The objective is to maximize the total remaining machine available time which can be used for other tasks. For the problem, a hybrid genetic algorithm is proposed. The algorithm combines a genetic algorithm for global search and a heuristic for local optimization to improve the speed of evolution convergence. The genetic operators are developed such that parallel machines can be handled in an efficient and effective way. For local optimization, the adjacent pairwise interchange method is used. The proposed hybrid genetic algorithm is compared with two heuristics, the nearest setup time method and the maximum penalty method. Computational results for a series of randomly generated problems demonstrate that the proposed algorithm outperforms the two heuristics.

  • PDF