• Title/Summary/Keyword: Sequence Management

Search Result 839, Processing Time 0.028 seconds

Development of Maintenance Sequence System by Using Modified FMEA and CBR (FMEA 개념과 사례베이스추론 기법을 이용한 보전작업순서결정시스템의 개발)

  • 김광만
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.4
    • /
    • pp.103-112
    • /
    • 2001
  • In Factory, as the number of machine is increased the more maintenance efforts are necessary. Multi maintenance issues may occur at a certain time and the determination of maintenance sequence is needed. In this study, we first compare the priority of machines and the impact value using modified FMEA(Failure Mode Effect and Analysis) method. Also, CBR(Case-based Reasoning) approach is applied to retrieve similar fault cases of current machine problem. The proposed methodology will be useful to implement decision support system of maintenance sequence for CMMS/EAM (Computerized Maintenance Management System/Enterprise Asset Management).

  • PDF

A Study on the Optimal Signal Timing for Area Traffic Control (지역 교통망 관리를 위한 최적 신호순서에 관한 연구)

    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.24 no.2
    • /
    • pp.69-80
    • /
    • 1999
  • A genetic algorithm to determine the optimal signal sequence and double cycle pattern is described. The signal sequence and double cycle pattern are used as the input for TRANSYT to find optimal signal timing at each junction in the area traffic networks, In the genetic process, the partially matched crossover and simple crossover operators are used for evolution of signal sequence and double cycle pattern respectively. A special conversion algorithm is devised to convert the signal sequence into the link-stage assignment for TRANSYT. Results from tests using data from an area traffic network in Leicester region R are given.

  • PDF

MODEL FOR DESIGN MANAGEMENT IN COLLABORATIVE ENVIRONMENT USING DESIGN STRUCTURE MATRIX AND DESIGN PARAMETERS' INFORMATION

  • Salman Akram;Jeonghwan Kim;Jongwon Seo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1307-1312
    • /
    • 2009
  • Design is an act based on multidisciplinary information. The involvement of various stakeholders makes it difficult to process, plan, and integrate. Iteration is frequent in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. The simple project management techniques are insufficient to fulfill the requirements of integrated design. This paper entails two things: design structure matrix and design parameters' information based model. The emphasis has been given to optimal sequence and crucial iteration using design structure matrix analysis technique. The design projects have been studied using survey data from industry. The optimal sequence and crucial iterations results have been utilized for proposed model. Model integrates two things: information about produced- required key design parameters and information of design changes during the design process. It will help to get familiar with Design management in order to fulfill contemporary needs.

  • PDF

A Novel Calibration Method Using Zadoff-Chu Sequence and Its FPGA Implementation (Zadoff-Chu sequence를 이용한 실시간 Calibration 알고리즘과 FPGA 구현)

  • Jang, Jae Hyun;Sun, Tiefeng;Yang, Hyun Wook;Choi, Seung Won
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.9 no.3
    • /
    • pp.59-65
    • /
    • 2013
  • This paper presents a novel calibration method for a base station system adopting an antenna array. The proposed technique utilizes Zadoff-Chu sequence, which is included in the LTE pilot signal periodically, in order to compute the phase characteristic of each antenna channel. As the Zadoff-Chu sequence exhibits an excellent autocorrelation characteristic, it is possible for the receiving base station to retrieve the Zadoff-Chu sequence transmitted from each mobile terminal. In addition, we can obtain the phase characteristic of each antenna channel, which is the ultimate goal of the calibration procedure. The proposed calibration algorithm has been implemented using an FPGA (Field Programmable Gate Array). We have applied the proposed algorithm to an array consisting of 2 antenna elements for simplicity. the phase value implied to the first and second antenna path is very accurately calculated from the proposed procedure. From the experimental test, the proposed method provides accurate calibration results.

Common Due-Date Assignment and Scheduling on Parallel Machines with Sequence-Dependent Setup Times

  • Kim, Jun-Gyu;Yu, Jae-Min;Lee, Dong-Ho
    • Management Science and Financial Engineering
    • /
    • v.19 no.1
    • /
    • pp.29-36
    • /
    • 2013
  • This paper considers common due-date assignment and scheduling on parallel machines. The main decisions are: (a) deter-mining the common due-date; (b) allocating jobs to machines; and (c) sequencing the jobs assigned to each machine. The objective is to minimize the sum of the penalties associated with common due-date assignment, earliness and tardiness. As an extension of the existing studies on the problem, we consider sequence-dependent setup times that depend on the type of job just completed and on the job to be processed. The sequence-dependent setups, commonly found in various manufacturing systems, make the problem much more complicated. To represent the problem more clearly, a mixed integer programming model is suggested, and due to the complexity of the problem, two heuristics, one with individual sequence-dependent setup times and the other with aggregated sequence-dependent setup times, are suggested after analyzing the characteristics of the problem. Computational experiments were done on a number of test instances and the results are reported.

Environmental Test Specifications for Automotive Electrical Units (자동차 전장품의 환경시험규격에 관한 연구)

  • Kim, Yong Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.46 no.2
    • /
    • pp.311-326
    • /
    • 2018
  • Purpose: Using international specifications, this study classified international standards and automobile manufacturers' test items based on the kind of test used and determined the test order for ISO 16750. Methods: The effects of international standards' environmental factors were examined, based on the major impacts of the product and the results of product failure. Automobile manufacturers' test items were compared with the test item in the ISO 16750. A generic algorithm was then used to determine the test sequence for ISO 16750. Results: International standards and automobile manufacturers' common test items were classified. The test sequence of ISO 16750 was determined for five cases. Conclusion: Although mechanical and environmental tests share many common features, there are differences in the details of the tests. There is a common sequence of tests, but weights are allocated tests differently.

Scheduling of Production Process with Setup Cost depending Job Sequence (작업순서에 따라 달라지는 준비 비용을 갖는 PCB 생산 공정의 일정계획)

  • Yu, Sungyeol
    • Management & Information Systems Review
    • /
    • v.34 no.2
    • /
    • pp.67-78
    • /
    • 2015
  • In this paper, we consider a scheduling problem of printed circuit board production process with setup cost depending job sequence. Given a set of PCBs, these are produced in single surface mounting device. The problem is to define job sequence with the objective of minimizing the total seutp cost. We propose a mathematical formulation and the problem is proven to be NP-hard. So, a meta heuristic based on genetic algorithm is developed.

  • PDF

A Study on the Implementation Effect of Accident Management Strategies on Safety

  • Moosung Jae;Kim, Dong-Ha;Jin, Young-Ho
    • Nuclear Engineering and Technology
    • /
    • v.28 no.3
    • /
    • pp.247-256
    • /
    • 1996
  • This paper presents a new approach for assessing accident management strategies using containment event trees (CETs) developed during an individual plant examination (IPE) for a reference plant (CE type, 950 MWe PWR). Various accident management strategies to reduce risk have been proposed through IPE. Three strategies for the station blackout sequence are used as an example : 1) reactor cavity flooding only, 2) primary system depressurization only, and 3) doing both. These strategies are assumed to be initiated at about the time of core uncovery. The station blackout (SBO) sequence is selected in this paper since it is identified as one of the most threatening sequences to safety of the reference plant. The effectiveness and adverse effects of each accident management strategy are considered synthetically in the CETs. A best estimate assessment for the developed CETs using data obtained from NUREG-1150, other PRA results, and the MAAP code calculations is performed. The strategies are ranked with respect to minimizing the frequencies of Various containment failure modes. The proposed approach is demonstrated to be very flexible in that it can be applied to any kind of accident management strategy for any sequence.

  • PDF

A Study on Web Services for Sequence Similarity search in the Workflow Environment (워크플로우 환경에서의 대규모 서열 유사성 검색 웹 서비스에 관한 연구)

  • Jun, Jin-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.13 no.6
    • /
    • pp.41-49
    • /
    • 2008
  • In recent years, a life phenomenon using a workflow management tool in bioinformatics has been actively researched. Workflow management tool is the base which enables researchers to collaborate through the re-use and sharing of service, and a variety of workflow management tools including MyGrid project's Taverna, Kepler and BioWMS have been developed and used as the open source. This workflow management tool can model and automate different services in spatially-distant area in one working space based on the web service technology. Many tools and databases used in the bioinformatics are provided in the web services form and are used in the workflow management tool. In such the situation, the web services development and stable service offering for a sequence similarity search which is basically used in the bioinformatics can be essential in the bioinformatics field. In this paper, the similarity retrieval speed of biology sequence data was improved based on a Linux cluster, and the sequence similarity retrieval could be done for a short time by linking with the workflow management tool through developing it in the web services.

  • PDF

Heuristics for Job Shop Scheduling Problems with Progressive Weighted Tardiness Penalties and Inter-machine Overlapping Sequence-dependent Setup Times

  • Mongkalig, Chatpon;Tabucanon, Mario T.;Hop, Nguyen Van
    • Industrial Engineering and Management Systems
    • /
    • v.4 no.1
    • /
    • pp.1-22
    • /
    • 2005
  • This paper presents new scheduling heuristics, namely Mean Progressive Weighted Tardiness Estimator (MPWT) Heuristic Method and modified priority rules with sequence-dependent setup times consideration. These are designed to solve job shop scheduling problems with new performance measures - progressive weighted tardiness penalties. More realistic constraints, which are inter-machine overlapping sequence-dependent setup times, are considered. In real production environments, inter-machine overlapping sequence-dependent setups are significant. Therefore, modified scheduling generation algorithms of active and nondelay schedules for job shop problems with inter-machine overlapping sequence-dependent setup times are proposed in this paper. In addition, new customer-based measures of performance, which are total earliness and progressive weighted tardiness, and total progressive weighted tardiness, are proposed. The objective of the first experiment is to compare the proposed priority rules with the consideration of sequence-dependent setup times and the standard priority rules without setup times consideration. The results indicate that the proposed priority rules with setup times consideration are superior to the standard priority rules without the consideration of setup times. From the second experiment and the third experiment to compare the proposed MPWT heuristic approach with the efficient priority rules with setup times consideration, the MPWT heuristic method is significantly superior to the Batched Apparent Tardiness Cost with Sequence-dependent Setups (BATCS) rule, and other priority rules based on total earliness and progressive weighted tardiness, and total earliness and tardiness.