Browse > Article

Heuristics for Job Shop Scheduling Problems with Progressive Weighted Tardiness Penalties and Inter-machine Overlapping Sequence-dependent Setup Times  

Mongkalig, Chatpon (Industrial Engineering and Management Program, School of Advanced Technologies)
Tabucanon, Mario T. (Industrial Engineering and Management Program, School of Advanced Technologies Asian Institute of Technology)
Hop, Nguyen Van (Industrial Engineering Program, Sirindhorn International Institute of Technology Thammasat University)
Publication Information
Industrial Engineering and Management Systems / v.4, no.1, 2005 , pp. 1-22 More about this Journal
Abstract
This paper presents new scheduling heuristics, namely Mean Progressive Weighted Tardiness Estimator (MPWT) Heuristic Method and modified priority rules with sequence-dependent setup times consideration. These are designed to solve job shop scheduling problems with new performance measures - progressive weighted tardiness penalties. More realistic constraints, which are inter-machine overlapping sequence-dependent setup times, are considered. In real production environments, inter-machine overlapping sequence-dependent setups are significant. Therefore, modified scheduling generation algorithms of active and nondelay schedules for job shop problems with inter-machine overlapping sequence-dependent setup times are proposed in this paper. In addition, new customer-based measures of performance, which are total earliness and progressive weighted tardiness, and total progressive weighted tardiness, are proposed. The objective of the first experiment is to compare the proposed priority rules with the consideration of sequence-dependent setup times and the standard priority rules without setup times consideration. The results indicate that the proposed priority rules with setup times consideration are superior to the standard priority rules without the consideration of setup times. From the second experiment and the third experiment to compare the proposed MPWT heuristic approach with the efficient priority rules with setup times consideration, the MPWT heuristic method is significantly superior to the Batched Apparent Tardiness Cost with Sequence-dependent Setups (BATCS) rule, and other priority rules based on total earliness and progressive weighted tardiness, and total earliness and tardiness.
Keywords
job shop scheduling problems; progressive weighted tardiness penalties; inter-machine overlapping setup times; sequence-dependent setup times;
Citations & Related Records
연도 인용수 순위
  • Reference