의사결정기법을 통한 건축공법선정에 관한 연구 (A Study on the Selection of Construction Method by Decision Making Method)

  • 양극영;윤여완
    • 한국건축시공학회지
    • /
    • 제2권1호
    • /
    • pp.147-154
    • /
    • 2002
  • In the Past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need very careful process. The purpose of this study is to present the best suitable methodology for selection of construction method by considering potential risk of construction method and variables together with external condition for underground construction. The purpose of this study Is to select the most suitable construction method by analysing potential conditions(construction site situation and client request in designing ) To do this, We prepared arrangement rule to arrange the conditions for construction method. And thin make checklist of the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy process among Multiple-Criteria Decision making, the professional opinions is to be adapted. By doing this, it can lead and select the most suitable construction method considering the data which get from risk density test.

리스크 분석을 통한 지하 구조체 공법 선정에 관한 연구 (A Study on the Selection of Underground Construction Method by Risk Analysis)

  • 윤여완;양극영;홍성휘
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.99-117
    • /
    • 2001
  • In the past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of Underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need rely careful process. The purpose of this study is to present the best suitable methodology fer selection of construction method by considering potential risk of construction method and variables together with external condition for Underground construction. The purpose of this study is to select the most suitable construction method by analysing potential conditions(Construction site situation and Client. Request in designing) To do this, We prepared arrangement rule to arrangement conditions for construction method. And then make Checklist the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy Process among Multiple-Criteria Decision Making, the professional opinions is to be adapted. By doing this, It can lead and select the most suitable considering method considering the data which get from risk density test.

  • PDF

리모델링 프로젝트의 최적 구조보강방법 선정 프로세스 (Selection process of the optimal structural-reinforcement method in remodeling construction works)

  • 김동필;조규만
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.298-299
    • /
    • 2014
  • As a governmental plan for real estate revitalization, remodeling vertical extension has been permitted. Thus, the Ministry of Land, Infrastructure and Transport preannounced proclaiming the revised Housing Act and establishing the remodeling basic plan, and it is anticipated that the remodeling market will be revitalized in earnest after the enforcement of remodeling vertical extension(April 25th. 2014). As vertical extension is applicable up to 3 stories, the safety of building for remodeling is becoming important, so most remodeling construction works use various methods for structural reinforcement. In this process, the selection of structural reinforcement method has depended on structural engineer's experience and knowledge and there has been a limitation in selecting the optimum structural reinforcement method which considers remodeling project characteristics. Therefore, this study analyzed the factors to determine the kinds of structural reinforcement method in a remodeling project and suggested a process to select the best structural reinforcement method of remodeling construction.

  • PDF

LIFT CYCLE PREDICTION METHOD FOR THE SELECTION OF LIFT EQUIPMENT IN SUPER TALL BUILDING CONSTRUCTION

  • Seo-kyung Won;Choong-hee Han;Junbok Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.153-160
    • /
    • 2009
  • The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.

  • PDF

A STUDY ON THE PROCESS OF LARGE-SCALE REPAIR OF A CONDOMINIUM

  • Seki, Eiji;Akiyama, Tetukazu
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2002년도 추계학술발표대회
    • /
    • pp.295-300
    • /
    • 2002
  • Since the contents of large-scale repair of a condominium were various, a plan document was not prepared. The owners association of the condominium has given priority to decision-making of price priority over quality. Examination is not performed about the contents of the construction supervision business, which checks whether suitable construction is performed, either. On the other hand, the know-how for builders, such as decision of the process plan under which the repair work lessens influence to the safety and life as much as possible since the place where the resident is living turns into a construction site, and selection of a method of construction, is just going to ask. It is an important subject how the structure of the construction contractor selection, which considered quality, is built. Then, this research focuses on large-scale repair construction of the condominium, and arranges the actual condition of a series of processes from plan document creation to construction supervision. The method of research collects the construction documents of the condominium that carried out Barge-scale repair construction. Next, collection arrangement of the data of construction builder selection is carried out. The method of the construction builder selection of those other than a construction price is examined. The method of quality control of large-scale repair construction is examined.

  • PDF

지하공사 사례를 기반으로 한 터파기 공법 선정프로세스 분석 (Case Analyses of the Selection Process of an Excavation Method)

  • 박상현;이강;최명석;강현정;임홍철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 춘계학술논문 발표대회
    • /
    • pp.101-104
    • /
    • 2007
  • As the proportion of underground construction increases, the impact of inappropriate selection of a underground construction method for a construction size increases. The purpose of this study is to develop an objective way of selecting an excavation method. There have been several attempts to achieve the same goal using various data mining methods such as the artificial neural network, the support vector machine, and the case-based reasoning. However, they focused only on the selection of a retaining wall construction method out of six types of retaining walls. When we categorized an underground construction work into four groups and added more number of independent variables (i.e., more number of construction methods), the predictability decreased. As an alternative, we developed a decision tree by analyzing 25 earthwork cases with detailed information. We implemented the developed decision tree as a computer-supported program called Dr. underground and are still in the process of validating and revising the decision tree. This study is still in a preliminary stage and will be improved by collecting and analyzing more cases.

  • PDF

다중 매트릭스 분석 기법을 이용한 최적 건축공법 선정 의사결정지원 모델 (Decision Making Model using Multiple Matrix Analysis for Optimum Construction Method Selection)

  • 이종식;임명관
    • 한국건축시공학회지
    • /
    • 제16권4호
    • /
    • pp.331-339
    • /
    • 2016
  • 건축물의 고층화, 복합화, 대형화에 따라 다양한 공법이 개발되고 있어 주요 공종에 대한 공법 선정의 중요성이 대두되고 있다. 그러나 프로젝트의 특성을 충분히 고려하지 못하고 있고 주요 공법의 선정을 위한 객관적 기준이나 자료 또한 부족한 실정이며, 실무자의 경험과 직관에만 의존하여 선정이 이루어지고 있는 점이 지적되어 왔다. 이러한 문제점을 해소하기 위해 퍼지, AHP, CBR 등 인공지능이론을 이용한 주요 공종의 공법 선정을 위한 다양한 연구가 진행되었다. 그러나 실무에서 공법 선정 시 공종별 특성 및 현장별 조건을 고려하여 주요 공종마다 각기 다른 여러 가지 공법 선정 모델을 적용하기는 어렵다. 이에 본 연구에서는 매트릭스 분석과 선형변환을 이용하여, 실무에서 활용이 용이한 범용적인 성격의 의사결정지원 모델을 제시하고, 사례 연구를 통해 흙막이 공법 선정 과정에 적용하여 연구모델의 정합성을 검증하였다.

생산설계의 이론과 적용 사례연구 -일본의 건축공사 프로젝트를 대상으로- (A Study on the Theory and its Case Study of Production Design - Focused on the Japanese Construction Projects -)

  • 김진호
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.89-101
    • /
    • 2005
  • 건축공사의 프로젝트 초기단계에 있어서 관련조직 간의 정보전달은 프로젝트의 수행방법을 결정하는데 중요한 영향을 미친다. 그러나 실제로는 체계적인 분석방법 보다는 현장관리자의 경험에 의존하여 중요한 의사결정이 수행되어 왔다. 예를 들면, 건축공사 프로젝트에서 공법선택은 설계자의 경험에 의존한 의사결정으로 진행되어 왔다. 이로 인해 시공단계에서 불필요한 공법변경사례가 발생하여 공기지 연 및 공사비 상승을 초래하였다. 주된 원인은 건축공사 프로젝트의 특성을 반영한 합리적인 의사결정 프로세스에 관한 검토가 체계적으로 이루어지지 않았기 때문이다. 따라서 합리적으로 공법을 선택할 수 있는 지원도구뿐만 아니라 생산설계가 필요하다. 본 연구는 프로젝트 초기단계에서 다양한 영향요인과 연계하여 체계적인 생산설계과정과 의사결정모델을 제안하는 것을 목적으로 하였다. 이러한 관점에서 연구의 목적을 달성하기 위해 다음과 같은 수순으로 연구를 진행하였다. 1)생산설계에 관한 선행이론을 분석하였으며, 2)구체공사에 있어서 프로젝트 제약조건의 분석을 통해 최적의 공법을 선택하는 과정에 대해서 고찰하였다. 3)생산설계의 문제점을 구체화하기 위해 사례연구내용을 분석하였다. 4)사례연구 및 전문가 면담의 결과를 분석함으로써 생산설계를 지원하기 위한 협력체 모델을 제안하였다. 제안된 모델은 유사한 프로젝트에 적용할 수 있도록 체계적으로 축적된 자료로 관리되고 관련조직간 정보전달을 개선할 수 있는 유효한 도구로서 활용될 수 있을 것으로 예상되어진다.

VE/LCC 기법을 활용한 차수공법 선정사례 연구 (A case study on the selection process of cutoff wall for ground-water using VE/LCC analysis)

  • 조용완;장준호;김진만;하재인
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.279-291
    • /
    • 2006
  • This study shows decision-making process for selection of cutoff wall on a wastewater treatment project. There are 10 different cut-off wall methods So, we examine the site to gather information for find appropriate methods. After using that information, 10 cutoff wall methods are reviewed for analysis. Through brainstorming, four alternatives are selected for design VE item. Following the standard VE process, we established performance criteria and evaluated function score(F) using questionnaire. The questionnaires, brainstorming and AHP method for weighting on performance criteria and evaluate function score increased the reliability of this selection process. Water Jet method, one of four methods, has the best function score(F=92.71) and the lease construction cost(as cost index 1,000). The value score also highest as 92.7, so we select the method. The result is value innovation type In addition, the authors try to calculate the environmental burden in selection process using LCA. We cannot conduct the full LCA as defined ISO, so perform Simple LCA In LCA result, the cut-off grouting has the least environmental burden as index 9.09E+01 and Water Jet method has following as the second. To selection best method to specific area and purpose, design VE/LCG process used as useful tool and it is needed to develop integrated method that evaluate VEILCC and LCA as one-set process.

  • PDF

A Fuzzy AHP Model for Selection of Consultant Contractor in Bidding Phase in Vietnam

  • Ha, Tran Thanh;Hoai, Long Le;Lee, Young Dai
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권2호
    • /
    • pp.35-43
    • /
    • 2015
  • Project Management Consultant (PMC) plays a vital role in the overall performance of any project. Selecting right PMC for right project is the most crucial challenge for any construction owner. Thus, PMC selection is one of the main decisions made by owners at the early phase of construction project. It is not easy for the project owner to select a competent PMC due to the fuzziness, imprecision, vagueness, incomplete and qualitative criteria of the decision. This paper presents a model for selecting PMC contractor using the Fuzzy Analytical Hierarchy Process (FAHP). And a fuzzy number based framework is proposed to be a viable method for PMC contractor selection. A case study to illustrate the application of the model is also presented in this paper.