1 |
Al-Harbi, K. M. A.S., "Application of the AHP in project management", Int. J. Proj. Manage, 19(1), pp. 19-27, 2001.
DOI
|
2 |
Nieto-Morote, A., Ruz-Vila, F., "A fuzzy multi-criteria decisionmaking model for construction contractor prequalification", Automation in Construction, 25, pp. 8-19, 2012.
DOI
|
3 |
Boroushaki, S., Malczewski, J., "Implementing an Extension of the Analytical Hierarchy Process using Order Weighted Averaging Operators with Fuzzy", Quantifiers ArcGIS Computers and Geoscience. 34, pp. 399 - 410, 2008.
DOI
|
4 |
Chan, A.P.C., Scott, D., Chan, A.P.L., "Factor affecting the success of a construction Project", Journal of Construction Engineering and Management, ASCE, 130, pp. 153-155, 2004.
DOI
|
5 |
Cheng, E. W. L., and Li, H., "Contractor selection using the analytical network process", Constr. Manage. Econ., 22(10), pp. 1021-1032, 2004.
DOI
|
6 |
Deng, H., "Multicriteria analysis with fuzzy pairwise comparison", International Journal of Approximate Reasoning, 21(3), pp. 215-231, 1999.
DOI
|
7 |
Fong, P. S.-W., and Choi, S. K.-Y., "Final contractor selection using analytical hierarchy process", Constr. Manage. Econom., 18, pp. 547-557, 2000.
DOI
|
8 |
Hatush, Z., and Skitmore, M., "Contractor selection using multicriteria utility theory: An additive model", Build. Environ., 33(2-3), pp. 105-115, 1998.
DOI
|
9 |
Hipel, K. W., Radford, K. J., and Fang, L., "Multiple participant multiple criteria decision making", IEEE Trans. Syst. Man Cybern. 23, pp. 1184-1189, 1993.
DOI
|
10 |
Holt, G. D., "Which contractor selection methodology?" Int. J. Proj. Manage., 16(3), pp. 153-164, 1998.
DOI
|
11 |
Hwang, C.L., and Yoon, K., Multiple attribute decision making: methods and applications, Springer, New York, 1981.
|
12 |
San Cristobal, J.R., "Contractor Selection Using Multicriteria Decision-Making Methods", Journal of Construction Engineering and Management, ASCE, 138, pp. 751-758, 2012.
DOI
|
13 |
Lam, K.C., Hu, T., Ng, S.T., Skitmore, M., Cheung, S.O., "A fuzzy neural network approach for contractor prequalification", Construction Management and Economics, 19(2), pp. 175-188, 2001.
DOI
|
14 |
Kaufmann, A., and Gupta, M. M., Introduction to fuzzy arithmetic theory and application, Van Nostrand Reinhold, New York, 1991.
|
15 |
Lambopoulos, S.,"The use of time and cost utility for construction contract award under European Union legislation", Build. Environ., 42(1), pp. 452-463, 2007.
DOI
|
16 |
Liou, T.S., and Wang, M.J.J., "Ranking Fuzzy numbers with Integral value", Fuzzy Sets & Systems, 50, pp. 247-255, 1992.
DOI
|
17 |
Madhi, I., Riley, M., Fereig, S., and Alex, A., "A multi-criteria approach to contractor selection", Eng. Constr. Archit. Manage., 9(1), pp. 29-37, 2002.
|
18 |
Marzouk,M., "An application of ELECTRE III to contractor selection" Construction Research Congress 2010
|
19 |
Ng, S.T. and Skitmore, R.M., "Client and consultant perspectives of prequalification criteria", Building and Environment, 34, pp. 607-21, 1999.
DOI
|
20 |
Meixner, O., Fuzzy AHP group decision analysis and its application for the evaluation of energy sources. Proceedings of the Proceedings of the 10th International Symposium on the Analytic Hierarchy/Network Process, Pittsburtgh/PA, USA, 2009.
|
21 |
Nguyen.V.U., "Tender evaluation by fuzzy sets", Journal of Construction Engineering and Management, 111(3), pp. 231- 243, 1985.
DOI
|
22 |
Ofori, G.,Ling, Y.Y., and Sui, P.L., "Evaluation and selection of consultants for design-build projects", Project Management Journal, 34.1, 2003.
|
23 |
Nguyen, D.L., Ogunlala, S.O. and Lan, D.T.X., "A study on Project success factors in large construction projects in Vietnam" Engineering, Construction and Architecture Management, 11(6), pp. 404-413, 2004.
DOI
|
24 |
Russell, J. S., and Skibniewski, M. J., "Decision criteria in contractor prequalification", J. Manage. Eng.,4(2), pp. 148-164, 1988.
DOI
|
25 |
Saaty, T.L., The analytic hierarchy process. New York NY: McGraw Hill, 1980.
|
26 |
Saaty, T L. and Kearns K P., Analytical Planning - The organizations of Systems. Pergamon Press, New York, 19-62, 1985.
|
27 |
Singh,D and Tiong, R.L.K., "A fuzzy decision framework for Contractor Selection", Journal of Construction Engineering and Management, ASCE Vol.131, pp. 62-70, 2005
DOI
|
28 |
Ng, S.T., Kumaraswamy, M. and Chow, L.K., "Selecting Consultants through combined technical and fee assessment: A Hong Kong Study", Association of Researchers in Construction Management, Vol.1, 639-47, 2001.
|
29 |
Topcu;Y.I., "A decision model proposal for construction contractor selection in Turkey", Build. Environ, 39(4), pp. 469- 481, 2004.
DOI
|
30 |
Tesfamariam, S., and Sadiq R., "Risk-based environmental decision-making using fuzzy analytic hierarchy process (FAHP)", Stochastic Environmental Research and Risk Assessment, 21(1), pp. 35-50, 2006.
DOI
|
31 |
Trivedi. M. K.; Pandey, M. K., Bhadoria, S.S., "Prequalification of Construction Contractor using a FAHP", International Journal of Computer Applications, Vol. 28- No.10, 2011.
|
32 |
Wong, C. H., "Contractor performance prediction model for the United Kingdom construction contractors: Study of logistic regression approach", J. Constr. Eng. Manage, 130(5), pp. 691- 698, 2004.
DOI
|
33 |
Li,Y.W., Nie, X.T., "Fuzzy Approach to Prequalifying Construction Contractors", Journal of Construction Engineering and Management, ASCE,Vol.133,No.1, 2007.
|
34 |
Zadeh, L.A., "Fuzzy sets", Information and Control, 8(3), pp.338-353, 1965.
DOI
|