A Study on the Erection Scheduling for Shipbuilding Considering Resource Constraints (자원 제약을 고려한 조선산업에서의 탑재 일정계획에 관한 연구)

  • Kim, Ki-Dong;Woo, Sang-Bok;Hahn, Hyung-Sang
    • IE interfaces
    • /
    • v.14 no.3
    • /
    • pp.218-226
    • /
    • 2001
  • Scheduling for shipbuilding processes has many alternative solutions since it has long time horizon and handles many jobs. This requests the scheduling system to generate and search feasible alternative solutions in short period of time. Among shipbuilding schedules, the ship erection schedule in a dock is the most important since the dock is the most critical resource in shipyard. In this research, we model the erection scheduling problem for shipbuilding and develop a new problem solving method using CST(Constraint Satisfaction Technique) and ILOG Scheduler. Experimental results show that the proposed scheduling method outperforms the existing manual scheduling methods in terms of schedule performance and required time.

  • PDF

An Efficient Scheduling Method for Grid Systems Based on a Hierarchical Stochastic Petri Net

  • Shojafar, Mohammad;Pooranian, Zahra;Abawajy, Jemal H.;Meybodi, Mohammad Reza
    • Journal of Computing Science and Engineering
    • /
    • v.7 no.1
    • /
    • pp.44-52
    • /
    • 2013
  • This paper addresses the problem of resource scheduling in a grid computing environment. One of the main goals of grid computing is to share system resources among geographically dispersed users, and schedule resource requests in an efficient manner. Grid computing resources are distributed, heterogeneous, dynamic, and autonomous, which makes resource scheduling a complex problem. This paper proposes a new approach to resource scheduling in grid computing environments, the hierarchical stochastic Petri net (HSPN). The HSPN optimizes grid resource sharing, by categorizing resource requests in three layers, where each layer has special functions for receiving subtasks from, and delivering data to, the layer above or below. We compare the HSPN performance with the Min-min and Max-min resource scheduling algorithms. Our results show that the HSPN performs better than Max-min, but slightly underperforms Min-min.

An Energy Efficient Algorithm Based on Clustering Formulation and Scheduling for Proportional Fairness in Wireless Sensor Networks

  • Cheng, Yongbo;You, Xing;Fu, Pengcheng;Wang, Zemei
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.2
    • /
    • pp.559-573
    • /
    • 2016
  • In this paper, we investigate the problem of achieving proportional fairness in hierarchical wireless sensor networks. Combining clustering formulation and scheduling, we maximize total bandwidth utility for proportional fairness while controlling the power consumption to a minimum value. This problem is decomposed into two sub-problems and solved in two stages, which are Clustering Formulation Stage and Scheduling Stage, respectively. The above algorithm, called CSPF_PC, runs in a network formulation sequence. In the Clustering Formulation Stage, we let the sensor nodes join to the cluster head nodes by adjusting transmit power in a greedy strategy; in the Scheduling Stage, the proportional fairness is achieved by scheduling the time-slot resource. Simulation results verify the superior performance of our algorithm over the compared algorithms on fairness index.

Production/Distribution Scheduling for Integrated Supply Chain Management (통합 공급체인관리를 위한 생산/배송 스케줄링)

  • Park, Yang-Byung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.28 no.4
    • /
    • pp.443-453
    • /
    • 2002
  • Many firms are trying to optimize their production and distribution systems separately, but possible profit increase by this approach is limited. Nowadays, it is more important to analyze these two systems simultaneously for the integrated supply chain management. This paper is a computational study to investigate the effectiveness of integrating production and distribution scheduling. We are interested in a multi-plant, multi-retailer, multi-product and multi-period industrial problem where the objective in solving production and distribution scheduling problem is to maximize the total net profit. Computational results on test problems of various sizes using the heuristic we developed show a substantial advantage of the integrated scheduling approach over the decoupled scheduling process. Sensitivity analysis on the parameter values indicates that, under the right conditions, the effectiveness of integrating production and distribution functions can be extremely high.

A Scheduling Algorithm for Workstations with Limited Waiting Time Constraints in a Semiconductor Wafer Fabrication Facility (대기시간 제약을 고려한 반도체 웨이퍼 생산공정의 스케쥴링 알고리듬)

  • Joo, Byung-Jun;Kim, Yeong-Dae;Bang, June-Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.4
    • /
    • pp.266-279
    • /
    • 2009
  • This paper focuses on the problem of scheduling wafer lots with limited waiting times between pairs of consecutive operations in a semiconductor wafer fabrication facility. For the problem of minimizing total tardiness of orders, we develop a priority rule based scheduling method in which a scheduling decision for an operation is made based on the states of workstations for the operation and its successor or predecessor operation. To evaluate performance of the suggested scheduling method, we perform simulation experiments using real factory data as well as randomly generated data sets. Results of the simulation experiments show that the suggested method performs better than a method suggested in other research and the one that has been used in practice.

Application of Adaptive Particle Swarm Optimization to Bi-level Job-Shop Scheduling Problem

  • Kasemset, Chompoonoot
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.1
    • /
    • pp.43-51
    • /
    • 2014
  • This study presents an application of adaptive particle swarm optimization (APSO) to solving the bi-level job-shop scheduling problem (JSP). The test problem presented here is $10{\times}10$ JSP (ten jobs and ten machines) with tribottleneck machines formulated as a bi-level formulation. APSO is used to solve the test problem and the result is compared with the result solved by basic PSO. The results of the test problem show that the results from APSO are significantly different when compared with the result from basic PSO in terms of the upper level objective value and the iteration number in which the best solution is first identified, but there is no significant difference in the lower objective value. These results confirmed that the quality of solutions from APSO is better than the basic PSO. Moreover, APSO can be used directly on a new problem instance without the exercise to select parameters.

Generating unit Maintenance Scheduling based on PSO Algorithm (PSO알고리즘에 기초한 발전기 보수정지)

  • Park, Young-Soo;Kim, Jin-Ho;Park, June-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.222-224
    • /
    • 2006
  • This paper addresses a particle swarm optimization-based approach for solving a generating unit maintenance scheduling problem(GMS) with some constraints. We focus on the power system reliability such as reserve ratio better than cost function as the objective function of GMS problem. It is shown that particle swarm optimization-based method is effective in obtaining feasible schedules such as GMS problem related to power system planning and operation. In this paper, we find the optimal solution of the GMS problem within a specific time horizon using particle swarm optimization algorithm. Simple case study with 16-generators system is applicable to the GMS problem. From the result, we can conclude that PSO is enough to look for the optimal solution properly in the generating unit maintenance scheduling problem.

  • PDF

A Simulated Annealing Algorithm for the Capacitated Lot-sizing and Scheduling problem under Sequence-Dependent Setup Costs and Setup Times (순서에 종속된 준비 시간과 준비 비용을 고려한 로트사이징 문제의 시뮬레이티드 어닐링 해법)

  • Jung, Jiyoung;Park, Sungsoo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.2
    • /
    • pp.98-103
    • /
    • 2006
  • In this research, the single machine capacitated lot-sizing and scheduling problem with sequence- dependent setup costs and setup times (CLSPSD) is considered. This problem is the extension of capacitated lot-sizing and scheduling problem (CLSP) with an additional assumption on sequence-dependent setup costs and setup times. The objective of the problem is minimizing the sum of production costs, inventory holding costs and setup costs satisfying customers' demands. It is known that the CLSPSD is NP-hard. In this paper, the MIP formulation is presented. To handle the problem more efficiently, a conceptual model is suggested, and one of the well-known meta-heuristics, the simulated annealing approach is applied. To illustrate the performance of this approach, various instances are tested and the results of this algorithm are compared with those of the CLPEX. Computational results show that this approach generates optimal or nearly optimal solutions.

Multi-Parameter Based Scheduling for Multi-user MIMO Systems

  • Chanthirasekaran, K.;Bhagyaveni, M.A.;Parvathy, L. Rama
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.6
    • /
    • pp.2406-2412
    • /
    • 2015
  • Multi-user multi-input multi-output (MU-MIMO) system has attracted the 4th generation wireless network as one of core technique for performance enrichment. In this system rate control is a challenging problem and another problem is optimization. Proper scheduling can resolve these problems by deciding which set of user and at which rate the users send their data. This paper proposes a new multi-parameter based scheduling (MPS) for downlink multi-user multiple-input multiple-output (MU-MIMO) system under space-time block coding (STBC) transmissions. Goal of this MPS scheme is to offer improved link level performance in terms of a low average bit error rate (BER), high packet delivery ratio (PDR) with improved resource utilization and service fairness among the user. This scheme allows the set of users to send data based on their channel quality and their demand rates. Simulation compares the MPS performance with other scheduling scheme such as fair scheduling (FS), normalized priority scheduling (NPS) and threshold based fair scheduling (TFS). The results obtained prove that MPS has significant improvement in average BER performance with improved resource utilization and fairness as compared to the other scheduling scheme.

A Genetic Algorithm for Integration of Process Planning and Scheduling in a Job Shop (Job Shop 통합 일정계획을 위한 유전 알고리즘)

  • Park, Byung-Joo;Choi, Hyung-Rim;Kang, Moo-Hong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.3
    • /
    • pp.55-65
    • /
    • 2005
  • In recent manufacturing systems, most jobs may have several process plans, such as alternative sequence of operations, alternative machine etc. A few researches have addressed the necessity for the integration of process planning and scheduling function for efficient use of manufacturing resources. But the integration problem is very difficult and complex. Many prior researches considered them separately or sequentially. It introduces overlapping or partial duplications in solution efforts. In this paper, Integration problem of jobs with multiple process plans in a job shop environment Is addressed. In order to achieve an efficient integration between process planning and scheduling by taking advantage of the flexibility that alternative process plans offer, we designed GA(Genetic Algorithm)-based scheduling method. The performance of proposed GA is evaluated through comparing integrated scheduling with separated scheduling in real world company with alternative machines and sequences of operations. Also, a couple of benchmark problems are used to evaluate performance. The integrated scheduling method in this research can be effectively epplied to the real case.