• Title/Summary/Keyword: Scheduling System

Search Result 2,160, Processing Time 0.027 seconds

A Study on the Scheduling scheme for VOD Services. (VOD 서비스의 스케줄링 기법에 관한 연구)

  • 이준화;유재욱박태근박재현
    • Proceedings of the IEEK Conference
    • /
    • 1998.10a
    • /
    • pp.123-126
    • /
    • 1998
  • Generally, in a VOD(video on Demand) system, batching technique is oten used to improve throughput. Since subscribers to VOD servives tend to withdraw their requests as the latency becomes large, an optimal scheduling scheme should consider not only batching size but also withdrawal rae, service latency and fairness between different programs. In this paper, we propose a new scheduling scheme, which shows improvement in fairness and reduction in withdrawal rate and service latency compared with other well known schemes. When there are 2 or more streams are available in the VOD server, proposed scheme apply different program selection policies to each streams. Using this approach effectiveness of stream usage can be improved.

  • PDF

A Study on the Weekly Operation planning of pumped Hydrostorage plant Considering Unit Commitment (기동정지계획을 고려한 제수발전소의 주간 운용에 관한 연구)

  • 송길영;홍상은;김영태
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.36 no.5
    • /
    • pp.319-327
    • /
    • 1987
  • This paper presents a dynamic programming sucdessive approximation algorithm for scheduling pumped storage hydro plants and shows how this method can be coordinated with the commitment of the thermal units of the system. The general object of operation of pumped hydrostorage plants is the minimization of the overall production cost and the maximization of generation reserves. The basic procedure used to obtain a combined pumped storage-unit commitment schedule is to execute the pumped storage scheduler and unit commitment scheduler iteratively. A combined DPSA algorithm has been presented to coordinate the scheduling of the pumped storage with the scheduling of the thermal units.

  • PDF

A Heuristic Method for Channel Allocation and Scheduling in an OFDMA System

  • Hwang, Sung-Ho;Park, Joon-Goo;Jang, Youn-Seon;Cho, Ho-Shin
    • ETRI Journal
    • /
    • v.30 no.5
    • /
    • pp.741-743
    • /
    • 2008
  • In this letter, a heuristic channel allocation and scheduling scheme is proposed. By comparing the size of the alternative-factor assessment, which is obtained by simple calculation, we can easily find the most appropriate channel for each user for overall throughput enhancement. Numerical results show that the downlink throughput of the proposed scheme is higher than that of proportional fairness and is almost the same as that of the maximum C/I scheme, while user fairness remains better than that of the maximum C/I scheme.

  • PDF

Maintenance Scheduling Using PSO Algorithm for Power Plants (PSO알고리즘을 이용한 전력계통의 발전기 예방정비계획 수립)

  • Park, Young-Soo;Jeong, Hee-Myung;Park, Jong-Kook;Kim, Jin-Ho;Park, June-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2007.11b
    • /
    • pp.237-239
    • /
    • 2007
  • This paper focuses on maintenance scheduling using PSO algorithm for power plants from an economic (operating cost) and reliable(variance of operating reserve margin) point of view. We also apply regional reserve margin and transfer capability to maintenance scheduling problem. The proposed method has been applied to IEEE-RTS(1996) with 32-generators and a real -world large scale power system with 291 generators.

  • PDF

Development of an Application Software for the Die-Production Information Management (금형 생산관리를 위한 응용 소프트웨어의 개발)

  • Kong, Myung-Dal;Kim, Jung-Ja
    • IE interfaces
    • /
    • v.9 no.2
    • /
    • pp.143-158
    • /
    • 1996
  • This paper deals with the development of a software module for production planning and scheduling activities of an actual die-production management system. Scheduling problems, such as master schedule and detailed schedule, are the focal point of the whole article and they are considered in terms of operation procedures. Schedule-explosion module and load levelling module are the essential components of schedule management. The scheduling module allocates the resources, determines the process priority and the planned start and completion dates of processes. Rescheduling can be done to manipulate unforeseen situations that schedule is delayed owing to inducing defectives, machine breakdowns and lumpy demands. This study indicates a practical model for the die-producation management and helps to apply it for jobs in the real situation.

  • PDF

Production-and-Delivery Scheduling with Transportation Mode Selection Allowed (수송수단의 선택이 허용된 생산 및 배송 스케줄링에 관한 연구)

  • Cho, Jung Keun;Lee, Ik Sun;Sung, Chang Sup
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.3
    • /
    • pp.163-171
    • /
    • 2006
  • This paper considers a scheduling problem to minimize the sum of the associated scheduling (production/delivery times) cost and the delivery cost for an integrated system of a single production machine and various transportation vehicles with transportation mode selection allowed. Each transportation mode is provided with a fixed number of vehicles at the associated delivery time and cost. The proposed problem is characterized as being NP-hard. Some solution properties are also characterized. Therewith, three heuristic algorithms (called SPT-based, LWF-based and WSPT-based heuristic) and a branch-and-bound algorithm are derived. In order to evaluate the effectiveness and efficiency of the proposed algorithms, computational experiments are made with some numerical instances.

Group Scheduling Problem in Multi - Stage Manufacturing Systems with Dependent Setup time (준비시간(準備時間)이 종속인 다단계(多段階) 생산(生産) 시스템의 집단일정계획(集団日程計劃))

  • No, In-Gyu;Nam, Hui-Yeol
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.12 no.2
    • /
    • pp.33-44
    • /
    • 1986
  • This research is concerned with group scheduling problems in multi-stage manufacturing system with dependent setup time. The objective of the research is to develop and evaluate a heuristic algorithm for determining group sequence and job sequence within each group to minimize total tardiness in multi-stage manufacturing systems with sequence dependent group setup time. The group scheduling heuristic algorithm is developed and evaluated by comparisons with twenty-seven problems with the known optimum solutions and 144,000 random schedules of a large variety problems. The results indicate that the proposed heuristic algorithm gets the same optimum solutions for the problems and also provides the good solutions in comparison with the random schedules of the large variety problems. A numerical example is given to illustrate the heuristic algorithm.

  • PDF

Lot-Streaming Flow Shop Problem with Delivery Windows (딜리버리 윈도우 로트-스트리밍 흐름 공정 문제)

  • Yoon, Suk-Hun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.30 no.2
    • /
    • pp.159-164
    • /
    • 2004
  • Lot-streaming is the process of splitting a job (lot) into a number of smaller sublots and then scheduling these sublots in order to accelerate the completion of jobs in a multi-stage production system. Anew genetic algorithm (NGA) is proposed for an-job, m-machine, equal-size sublot lot-streaming flow shop scheduling problem with delivery windows in which the objective is to minimize the mean weighted absolute deviation of job completion times from due dates. The performance of NGA is compared with that of an adjacent pairwise interchange (API) method and the results of computational experiments show that NGA works well for this type of problem.

QoS Packet-Scheduling Scheme for VoIP Services in IEEE 802.16e Systems

  • Jang, Jae-Shin;Lee, Jong-Hyup;Cheong, Seung-Kook;Kim, Young-Sun
    • Journal of Communications and Networks
    • /
    • v.11 no.1
    • /
    • pp.36-41
    • /
    • 2009
  • The IEEE 802.16 wireless metropolitan area network (WMAN) standard is designed to correct expensive communication costs in CDMA-based mobile communication systems and limited coverage problems in wireless LAN systems. Thus, the IEEE 802.16e standard can provide mobile high-speed packet access between mobile stations and the Internet service provider through the base station with cheap communication fees. To efficiently accommodate voice over IP (VoIP) services in IEEE 802.16 systems, an uplink quality of service packet-scheduling scheme is proposed, and its performance is evaluated with an NS-2 network simulator in this paper. Numerical results show that this proposed scheme can increase the system capacity by 100% more than in the unsolicited rand service (UGS) scheme and 30% more than the extended real-time polling service (ertPS) scheme, respectively.

RSU scheduling method to improve service ratio in vehicle-to-RSU communication (차량과 노변장치의 통신에서 처리율 향상을 위한 전송 스케줄링 방안)

  • Lim, Yeon-Sup;Hwang, Jae-Ryong;Kim, Chong-Kwon
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2008.06d
    • /
    • pp.428-431
    • /
    • 2008
  • Recently, people have been interested in new intelligent transport system (ITS) architecture, so that vehicular networks are becoming an attractive research area. When vehicles try to access data through a roadside unit (RSU), data scheduling of RSU needs to improve service ratio due to limited bandwidth and service time. In this paper, we propose a service scheduling algorithm based on transmission delays and service deadlines of vehicles in order to improve the service ratio. In our algorithm, we assume the promiscuous operation of wireless nodes and it can make a single transmission of RSU serve multiple requests. We evaluated the performance of our scheme via simulations, and results show that our schemes have better performance than existing algorithms.

  • PDF