• 제목/요약/키워드: Schedule-based

검색결과 1,307건 처리시간 0.033초

Compliance with Recommendations on Work Schedule for Shift Nurses in South Korea

  • Lee, Jiyeon;Jeong, Ihn Sook
    • Safety and Health at Work
    • /
    • 제12권2호
    • /
    • pp.255-260
    • /
    • 2021
  • Background: A well-designed shift schedule has been reported to have a positive effect on improving health problems associated with shift work. This study aimed to identify compliance with the 17 recommendations on work schedule (WSRs) for shift nurses and related factors. Methods: The descriptive study was conducted with 182 nurses who worked in three shifts for more than 1 year at superior general and general hospitals in three regions. Data were collected with selfadministered questionnaire and 13-week work schedule tables, and analyzed with both person- and cycle-based compliance. Results: Person-based compliance was 11.77 among 17 items in total. However, no one completely complied with WSRs of "no work on weekends" and which showed the lowest cycle-based compliance (22.3%). Compliance with some WSRs was related to hospital type, proportion of nurses in school and having standards on work schedule at institutional level. Conclusion: Compliance with WSRs of shift nurses in Korea is still unsatisfactory, and one day off after night shift and work on weekend are quite common. Hospitals should keep the standards on work schedule, monitor compliance with standards, and try to introduce modified shift systems to improve the current problems.

A Development of Nurse Scheduling Model Based on Q-Learning Algorithm

  • JUNG, In-Chul;KIM, Yeun-Su;IM, Sae-Ran;IHM, Chun-Hwa
    • 한국인공지능학회지
    • /
    • 제9권1호
    • /
    • pp.1-7
    • /
    • 2021
  • In this paper, We focused the issue of creating a socially problematic nurse schedule. The nurse schedule should be prepared in consideration of three shifts, appropriate placement of experienced workers, the fairness of work assignment, and legal work standards. Because of the complex structure of the nurse schedule, which must reflect various requirements, in most hospitals, the nurse in charge writes it by hand with a lot of time and effort. This study attempted to automatically create an optimized nurse schedule based on legal labor standards and fairness. We developed an I/O Q-Learning algorithm-based model based on Python and Web Application for automatic nurse schedule. The model was trained to converge to 100 by creating an Fairness Indicator Score(FIS) that considers Labor Standards Act, Work equity, Work preference. Manual nurse schedules and this model are compared with FIS. This model showed a higher work equity index of 13.31 points, work preference index of 1.52 points, and FIS of 16.38 points. This study was able to automatically generate nurse schedule based on reinforcement Learning. In addition, as a result of creating the nurse schedule of E hospital using this model, it was possible to reduce the time required from 88 hours to 3 hours. If additional supplementation of FIS and reinforcement Learning techniques such as DQN, CNN, Monte Carlo Simulation and AlphaZero additionally utilize a more an optimized model can be developed.

공정리스크의 정량적 도출을 위한 기초적 방법 (Quantitively deducing basic method of construction schedule risk)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF

IFC 기반의 공정정보 축적을 위한 기초연구 (A Basic Study for Accumulation of IFC-based Schedule Information)

  • 송종관;최원식;원지선;김남곤
    • 한국산학기술학회논문지
    • /
    • 제14권11호
    • /
    • pp.5890-5896
    • /
    • 2013
  • 본 연구는 BIM 기반의 납품체계에서 IFC 파일의 공정정보를 축적하고 활용하기 위한 방안을 제시하였다. 이를 위해 첫 번째로, 공정정보의 활용방안에 대하여 기존연구를 분석하였고, IFC 표준을 고찰하였다. 두 번째로, 공정요소를 도출하기 위해 공정계획 수립절차를 분석하였으며, 공정프로세스와 상용소프트웨어를 분석하여 공정정보항목을 도출하였다. 또한 도출된 공정정보항목을 기반으로 IFC 스키마를 분석하여 IFC의 공정요소를 도출하였다. 마지막으로 IFC 납품파일의 축적을 위해 조달청의 시설사업 BIM 적용 기본 지침서를 분석하여 개념적인 BIM 모델의 납품프로세스를 통한 축적방법과 활용방안을 제시하였다. 본 연구는 국가적으로 진행되고 있는 BIM 도입과정에서 BIM모델의 정보를 축적하는데 기여할 것으로 기대된다.

Work package 개념을 활용한 현장의 공정관리와 공사비 통합관리 효율화 방안 (Development of Integrated Cost and Schedule Management System using Work Package Concept for Efficient Project Management)

  • 김용표;이용준;이민재
    • 한국건설관리학회논문집
    • /
    • 제18권5호
    • /
    • pp.32-40
    • /
    • 2017
  • 최근 국내 건설산업은 성장의 시기를 지나 침체기로 접어들고 있으며 경쟁력 향상을 위해 건설사업관리 특히 공정관리의 중요성이 더욱 부각되고 있다. 이러한 상황에 토목 건설업계는 생존을 위한 다양한 공사관리 방안의 연구 및 현장 적용에 부단한 노력을 하고 있으며 많은 성과를 이루고 있으나 아직도 체계적이며 효율적이고 현장 활용도가 높은 공정관리 기법의 정착은 이루어지지 못하고 있다. 이에 본 연구에서는 공사관리의 핵심인 공정관리의 활용에 대해 설문조사방식으로 현장기술자들의 인식 및 이해의 정도를 파악하며 현장에서 실제 사용하고 있는 공정표의 작성수준과 활용 현황을 파악을 위해 방문 조사하여 현재 국내 공정관리 현주소 및 문제점을 파악하였다. 아울러, 기존문헌 및 연구논문의 고찰, 현장에의 적용성을 바탕으로 현장 활용성이 높은 WBS 분류에서부터 work pacckage 도출과 Activty도출, 공정표 작성 및 관리방안을 제안하였다.

Causes of Schedule Delays in Building Construction Projects in Vanuatu

  • Kim, Dae Young;Chi, Seokho
    • 한국건축시공학회지
    • /
    • 제15권6호
    • /
    • pp.641-651
    • /
    • 2015
  • With its recent tourism boom, Vanuatu, a small country in the South Pacific, is experiencing an increasing demand for construction. However, it has been struggling with persistent schedule delays in their construction projects due to a variety of reasons. In an attempt to respond to this situation, this paper aims to identify the major causes of schedule delays in building construction in Pacific island countries, with a focus on Vanuatu. To collect data on the factors affecting schedule delays, face-to-face interviews were conducted. Based on these, seven major causes of schedule delays, as selected by the majority of the participants, were identified and discussed to provide perceptive insights for future improvement opportunities. This paper attempts to help contractors with limited resources better understand the major causes of schedule delay in Vanuatu and achieve better performance in building projects.

철도시설공사의 현장 공정관리를 위한 원격 영상 운영체계 개발 (Development of Telepresence System for Schedule Management in Railway Construction Project)

  • 강인석;김현승;박진정;문현석;신민호
    • 한국철도학회논문집
    • /
    • 제13권1호
    • /
    • pp.23-30
    • /
    • 2010
  • 4D CAD에 의한 건설공사 공정관리시스템은 가상건설기법의 그래픽에 의한 계획일정위주 공정관리에 중점을 두고 있으므로 실제 현장상황의 판단에 의한 진도관리가 어려운부분이 있다. 본 연구는 4D CAD기반의 공정관리에 현장 웹카메라를 갖춘 Telepresence 기법을 이용한 원격현장 실시간 진도관리 모니터링체계를 연동하는 공정관기시스템 개발을 시도하고 있다. 개발된 시스템은 철도시설공사에 적용하여 활용성을 검증하였으며, 4D CAD에 의한 계획 공정현황과 웹카메라에 의한 실시간 실제현장 영상을 비교하여 시각적 진도관리를 가능하게 할 수 있다.

BIM기반 건축시공 시뮬레이션 시스템 프로토 타입 개발에 관한 연구 (A Study on Proto-type Development of BIM based Architectural Construction Simulation System)

  • 박재현;윤석헌;백준홍
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.442-445
    • /
    • 2008
  • The purpose of this study is making Proto-type development of BIM based Architectural Construction Simulation System. This study suggest a new schedule access method for overcoming limitation of current Simulation Program focused on visualization. The method made from analysis of current Simulation Program. This program is based on Visual Basic .Net language.

  • PDF

DEVELOPING WEB-BASED 5D SYSTEM CONNECTING COST, SCHEDULE AND 3D MODEL

  • Hando Kim;Jaehong Kim;Junghoon Han;Yonghan Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.157-161
    • /
    • 2011
  • BIM having started from architecture is being used in civil structure, but there are very few examples despite its effectiveness. In this paper, based on BIM technology, it is presented the method and result of developing web-based 5D system connecting cost, schedule and 3D model from the cable-stayed bridge. Through the system, the user can understand easily schedule on specific time and during some period and extract cost directly. This system also can manage various data types such as drawings, 3D models, documents and photos, for enhanced communication between stakeholders.

  • PDF

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF