• Title/Summary/Keyword: Schedule Simulation

Search Result 409, Processing Time 0.029 seconds

A Study on Proto-type Development of BIM based Architectural Construction Simulation System (BIM기반 건축시공 시뮬레이션 시스템 프로토 타입 개발에 관한 연구)

  • Park, Jae-Hyun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.442-445
    • /
    • 2008
  • The purpose of this study is making Proto-type development of BIM based Architectural Construction Simulation System. This study suggest a new schedule access method for overcoming limitation of current Simulation Program focused on visualization. The method made from analysis of current Simulation Program. This program is based on Visual Basic .Net language.

  • PDF

A NESTING APPROACH IN DISCRETE EVENT SIMULATION FOR INTEGRATING CONSTRUCTION OPERATION AND SCHEDULE MODELS

  • Chang-Yong Yi;Chan-Sik Park;Doo-Jin Lee;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.400-408
    • /
    • 2009
  • Simulation applications for analyzing the productivity of construction operations at operation level and project schedules at project level are crucial methods in project management. The application at two different levels should be very tightly linked to each other in practice. However, appropriate integration at the levels is not achieved in that existing systems do not support to integrate operation models into a schedule model. This paper presents a new approach named to Discrete Event Simulation-Nesting modeling approach, which supports not only productivity analysis at operation level but also schedule management at a project level. The system developed by the authors allows creating operation models at the operation level, maintaining them in operation model library, executing sensitivity analysis to find the behaviors of the operation models when different combination of resources are used as existing DES systems do. On top of the conventional functions, the new system facilitates to find the optimum solution of resource combinations which satisfy the user's interest by computing the hourly productivity and the hourly cost of the operation. By drag-and-dropping an operation model kept in the operation model library, the operation models are integrated into an activity of the schedule model. When a complete schedule model is established by nesting operation models into the schedule model, stochastic simulation based scheduling is executed. A case study is presented to demonstrate the new simulation system and verify the validity of the system.

  • PDF

Project Schedule Risk Assessment Based on Bayesian Nets (베이지안넷 기반의 프로젝트 일정리스크 평가)

  • Sung, Hongsuk;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

SIMPLIFIED SIMULATION APPROACH TO MANAGING SCHEDULE-OVERRUN RISKS IN CONSTRUCTION OPERATIONS

  • Wah-Ho CHAN;Ming LU
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.929-934
    • /
    • 2005
  • The complex and dynamic job nature and the ever-changing working environment of construction projects inevitably present uncertainties to construction operations. Identification, evaluation and control of uncertainties constitute main elements of risk management and critical tasks of project management in construction. This paper is focused on application of a simplified discrete-event simulation approach in management of schedule-overrun risks, each being the combination of the occurrence probability of an uncertain interruptive factor and its potential consequence in terms of time delay. A case study observed from a concreting operation in Hong Kong is converted into a simulation model and analyzed with an in-house-developed simulation package for demonstrating how the proposed approach can be implemented to manage multiple schedule-overrun risks on construction projects.

  • PDF

A Method for Schedule Simulation Considering Rework and Uncertainty (재작업과 불확실성을 고려한 일정 시뮬레이션 방법론)

  • Kim, Chan-Mook;Park, Young-Won
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.135-143
    • /
    • 2009
  • The majority of development projects fail to meet their target schedule and cost, with the overrun typically between 40 and 200 percent. These overruns happen because the planners underestimate the work or do not consider the need to rework at project planning. Representative schedule planning/management techniques such as Gantt Chart, PERT/CPM etc. that are used in domestic project planning are unable to reflect rework. This paper proposes a method to consider rework to provide more realistic estimates at schedule planning. Additionally, to prevent the underestimation of the work this paper proposes a simulation method that calculates a probabilistic estimated schedule and the associated variance based on the random variable modeling of individual task completion dates.

IMPROVING THE USABILITY OF STOCHASTIC SIMULATION BASED SCHEDULING SYSTEM

  • Tae-Hyun Bae;Ryul-Hee Kim;Kyu-Yeol Song;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.393-399
    • /
    • 2009
  • This paper introduces an automated tool named Advanced Stochastic Schedule Simulation System (AS4). The system automatically integrates CPM schedule data exported from Primavera Project Planner (P3) and historical activity duration data obtained from a project data warehouse, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, computes the optimum number of simulation runs, simulates the schedule network for the optimum number of simulation runs, and estimates the best fit PDF of project completion times (PCTs). AS4 improves the reliability of simulation-based scheduling by effectively dealing with the uncertainties of the activities' durations, increases the usability of the schedule data obtained from commercial CPM software, and effectively handles the variability of the PCTs by finding the best fit PDF of PCTs. It is designed as an easy-to-use computer tool programmed in MATLAB. AS4 encourages the use of simulation-based scheduling because it is simple to use, it simplifies the tedious and burdensome process involved in finding the PDFs of the many activities' durations and in assigning the PDFs to the many activities of a new network under modeling, and it does away with the normality assumptions used by most simulation-based scheduling systems in modeling PCTs.

  • PDF

Simulation Modeling for Production Scheduling under Make-To-Order Production Environment : Focusing on the Flat Glass Production Environment (주문생산 방식의 생산계획 수립을 위한 시뮬레이션 모델 설계 : 판유리 제조 공정을 중심으로)

  • Choi, Yong-Hee;Hwang, Seung-June
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.1
    • /
    • pp.64-73
    • /
    • 2019
  • The manufacturing companies under Make-To-Order (MTO) production environment face highly variable requirements of the customers. It makes them difficult to establish preemptive production strategy through inventory management and demand forecasting. Therefore, the ability to establish an optimal production schedule that incorporates the various requirements of the customers is emphasized as the key success factor. In this study, we suggest a process of designing the simulation model for establishing production schedule and apply this model to the case of a flat glass processing company. The flat glass manufacturing industry is under MTO production environment. Academic research of flat glass industry is focused on minimizing the waste in the cutting process. In addition, in the practical view, the flat glass manufacturing companies tend to establish the production schedule based on the intuition of production manager and it results in failure of meeting the due date. Based on these findings, the case study aims to present the process of drawing up a production schedule through simulation modeling. The actual data of Korean flat glass processing company were used to make a monthly production schedule. To do this, five scenarios based on dispatching rules are considered and each scenario is evaluated by three key performance indicators for delivery compliance. We used B2MML (Business To Manufacturing Markup Language) schema for integrating manufacturing systems and simulations are carried out by using SIMIO simulation software. The results provide the basis for determining a suitable production schedule from the production manager's perspective.

A Simulation Model for Master Production Schedule (MPS) Evaluation System (기준생산계획 평가 시스템을 위한 시뮬레이션 모델)

  • 최성훈
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1998.03a
    • /
    • pp.106-110
    • /
    • 1998
  • Some successful scheduling systems are based on simulation technique. However, they are relatively expensive. A cost-effective solution is to apply general-purpose simulation software to the scheduling system. This paper is concerned with developing a simulation model for MPS(Master Production Schedule) evaluation system. The target system of the model is PC production system. AIM (Analyzer for Improving Manufacturing system), a well-known manufacturing oriented simulation software, is used for modeling tool. Eventually, the model can be included into an MPS evaluation system as simulation module and a scheduler can use the system to verify the MPS in advance.

  • PDF

A Study on the development of Schedule based Architectural construction Simulation System (공정관리 프로세스 중심의 시뮬레이션 시스템 개발방향에 관한 연구)

  • Jo, Jin;Kim, Sun-Hyo;Park, Jong-Bae;Kwon, O-Cheol;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.353-356
    • /
    • 2007
  • The purpose of this study is to propose development of Schedule based Architectural Construction Simulation System. In this study (or paper), we analysis the simulation system concept ant) its characteristics, and analyze the main functions simulation system and the range of functions which are already used currently. Therefore, we could find the limit of the present simulation system. and propose more effective solutions to develop Schedule based Architectural Construction Simulation System.

  • PDF

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).