1 |
Arbib, C. and Marinelli, F., An Optimiztion Model for Trim Loss Minimization in an Automotive Glass Plant, European Journal of Operational Research, 2007, Vol. 183, No. 3, pp. 1421-1432.
DOI
|
2 |
Beamon, B.M., Measuring Supply Chain Performance, International Journal of Operations & Production Management, 1999, Vol. 19, No. 3, pp. 275-292.
DOI
|
3 |
Dyson, R.G. and Gregory, A.S., The Cutting Stock Problem in the Flat Glass Industry, Journal of the Operational Research Society, 1974, Vol. 25, No. 1, pp. 41-53.
DOI
|
4 |
He, D., Lobov, A., and Lastra, J.M., ISA-95 Tool for Enterprise Modeling, Proceeding of ICONS, 2012, pp. 83-87.
|
5 |
Kelton, W.D., Smith, J.S., and Sturrock, D.T., Simio and Simulation : Modeling, Analysis, Applications, Learning Solutions, 2011.
|
6 |
Kwon, K.J., Hong, S.D., and Kim, K.H., Designing Racks for Transporting Flat Glass Products in a Construction Industry, Journal of the Korean Institute of Industrial Engineers, 2016, Vol. 42, No. 4, pp. 270-279.
DOI
|
7 |
Lee, C.S. and Choe, K.I., A Manufacturing Execution System based on ISA-95, Proceedings of the Conference on Korean Operations Research and Management Society, 2007, pp. 1092-1096.
|
8 |
Lee, J.Y. and Shin, M.S., Research Trends of Scheduling Techniques for Domestic Major Industries, Journal of Society of Korea Industrial and Systems Engineering, 2018, Vol. 41, No. 1, pp. 55-69.
|
9 |
Lee, S.W., Kim, H.S., and Cho, S.Y., A Study on Dynamic Scheduling in Flexible Manufacturing System Environment, Journal of Society of Korea Industrial and Systems Engineering, 2004, Vol. 27, No. 2, pp. 17-23.
|
10 |
Lin, J.T. and Chen, C.M., Simulation Optimization Approach for Hybrid Flow Shop Scheduling Problem in Semiconductor Back-end Manufacturing, Simulation Modelling Practice and Theory, 2015, Vol. 51, pp. 100-114.
DOI
|
11 |
Madsen, O.B., Glass Cutting in a Small Firm, Mathematical Programming, 1979, Vol. 17, No. 1, pp. 85-90.
DOI
|
12 |
Mun, J.S., Park, S.Y., and Lee, D.H., A Study on the Productivity Improvement of the Dicing Blade Production Process, Journal of Society of Korea Industrial and Systems Engineering, 2016, Vol. 39, No. 3, pp. 147-155.
DOI
|
13 |
Na, B., Ahmed, S., Nemhauser, G., and Sokol, J., A Cutting and Scheduling Problem in Float Glass Manufacturing, Journal of Scheduling, 2004, Vol. 17, No. 1, pp. 95-107.
DOI
|
14 |
Na, B., Ahmed, S., Nemhauser, G., and Sokol, J., Optimization of Automated Float Glass Lines, International Journal of Production Economics, 2013, Vol. 145, No. 2, pp. 561-572.
DOI
|
15 |
Papavasileiou, V., Koulouris, A., Siletti, C., and Petrides, D., Optimize Manufacturing of Pharmaceutical Products with Process Simulation and Production Scheduling Tools, Chemical Engineering Research and Design, 2007, Vol. 85, No. 7, pp. 1086-1097.
DOI
|
16 |
Taskin, Z.C. and Unal, A.T., Tactical Level Planning in Float Glass Manufacturing with Co-production, Random Yields and Substitutable Products, European Journal of Operational Research, 2009, Vol. 199, No. 1, pp. 252-261.
DOI
|
17 |
Pinedo, M.L., Scheduling : Theory, Algorithms, and Systems, Springer, 2016.
|
18 |
Lee, D.K. and Oh, D.K., A Study on Simulation based Manufacturing in Shipyards : Focused on a Long-term Plan Verification, Journal of the Korean Society of Marine Environment & Safety, 2014, Vol. 20, No. 1, pp. 86-95.
DOI
|
19 |
Pipero, C. and Manjunath, K., ISA 95 Implementation Best Practices : Workflow Descriptions using B2MML, WBF North American Conference, Atlanta, GA, 2006.
|
20 |
Smith, J.S., Sturrock, D.T., and Kelton, W.D., Simio and Simulation : Modeling, Analysis, Application, Simio LLC, 2017.
|