• 제목/요약/키워드: Schedule Risk Management System

검색결과 63건 처리시간 0.024초

R & D 프로젝트의 위험분석모형의 연구 (A Risk Analysis Model Using VERT for R & D Project Management)

  • 황홍석
    • 한국경영과학회지
    • /
    • 제20권1호
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF

공사프로세스기반 공정리스크 관리지원 시스템 (Construction Process based Schedule Risk Management System)

  • 윤유상;서상욱;박문서;장명훈
    • 한국건설관리학회논문집
    • /
    • 제9권4호
    • /
    • pp.101-110
    • /
    • 2008
  • 건설공사의 성공적인 수행을 위한 다양한 건설관리기법들 중 리스크관리기법은 프로젝트 규모의 대형화, 신공법 적용 등에 의한 불확실한 요인의 증가에 의해 그 중요성이 부각되고 있다. 따라서 본 연구에서는 현장실무자들의 공정리스크 관리 업무를 지원하기 위해 공종별 공사프로세스 중심의 공정리스크 확인방법과 현장별 특성이 반영된 공정리스크 중요도 지수를 개발하였으며, 향후 타 현장에서의 적용을 고려한 공정 리스크 중요도 보정방법을 제안하였다. 또한 공정리스크 요인별 대응방안을 현장에서 공사일정에 따라 검색하고, 공정정보와 연계된 공정리스크 관리 업무의 출력기능을 갖춘 공정 리스크 관리지원 시스템 프로토타입을 개발하였다. 공정리스크 관리지원 시스템은 건설현장 실무자들이 공정리스크 관리업무를 수행하는 데 필요한 지식을 제공하여, 의사결정지연에 따른 공기 지연을 방지할 수 있을 것으로 기대된다.

모수 추정기법/선형 칼만 필터를 이용한 무기체계개발 프로젝트 위험 요소의 영향도 추정 프로세스 (Process for Risk Severity Estimation of Weapon System Development Project using Parametric Estimation Method/Linear Kalman Filter)

  • 이승엽
    • 한국산학기술학회논문지
    • /
    • 제19권6호
    • /
    • pp.567-574
    • /
    • 2018
  • 위험 관리는 1) 체계개발 프로젝트의 비용, 일정 및 목표 성능 달성에 부정적인 영향을 줄 수 있는 위험 요소를 식별하고, 2) 식별된 각 위험 요소에 영향도와 발생 가능성을 부여하고 이를 바탕으로 식별 위험 요소를 관리하는 방법을 의미한다. 위험 요소를 사전에 식별하고 이에 대처함으로써 프로젝트의 비용 및 일정 관리와 목표 성능을 효과적으로 수행하고 달성할 수 있기 때문에 다양한 분야에서 위험 관리를 적용하고 있으며 이에 대한 많은 연구가 현재 진행되고 있다. 본 논문에서는 칼만 필터를 이용한 위험 요소 영향도 추정 방안을 제시한다. 위험 요소 영향도는 위험 발생 시의 손실 비용 및 일정을 변수로 갖는 식으로 표현된다고 가정하였다. 위험 요소 영향도의 참 값과 추정 값 사이의 오차를 줄이기 위한 방안으로서 선형 칼만 필터가 사용되었으며, 결과적으로 이를 통해 위험 관리 절차에 투입되는 자원을 절약할 수 있다. 제시된 위험 요소 영향도 추정 프로세스 검증은 시뮬레이션을 통해 수행되었다.

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • 제12권1호
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

군용항공기 연구개발 사업의 리스크 관리 (Risk Management for R&D Projects in the Military Aircraft Systems)

  • 김성훈;이현철
    • 산업경영시스템학회지
    • /
    • 제44권4호
    • /
    • pp.76-84
    • /
    • 2021
  • Military aircraft R&D projects require large-scale investment in cost and time, and involve a complex coordination process in decision-making. The R&D project manager should determine the development management priorities as accurately as possible and focus on R&D capabilities, thereby reducing the risks of the aircraft R&D project. To this end, this study aims to reduce R&D risk by prioritizing cost, schedule, and performance, which are basic management factors used in R&D project management in defense project management regulations. Analytic Hierarchy Process (AHP) is applied using a questionnaire for managers in charge of aviation R&D under the Defense Acquisition Program Administration. As a primary result, the importance of the factors that the aircraft R&D project manager should consider was derived in the order of performance, cost, and schedule, and the priorities of performance and cost in the lower layer were also identified. In addition, in order to provide practical risk management measures to aircraft R&D project managers, the results of analyzing 28 cases of US National Transportation Safety Board accidents were compared and analyzed with the AHP analysis results, and management measures suitable for the situation were specified.

위험도 평가기법을 적용한 철도시스템의 안전관리 (A Basic Study on the Railway Safety Management Based on Risk Assessment Approach)

  • 김상암;왕종배;곽상록;이동하
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.223-228
    • /
    • 2003
  • Risk Management does not mean accepting a risk but having a good grasp of, eliminating and controling the exact causes of known hazards. Good safety management plan or system for the safety of any systems need to include the procedures about standing safety goals, related technical information, time schedule, audit programs, etc at least. In this paper the summeries on general risk assessment techniques and the examples of risk assessment system and railway risk management strategies used in UK, Australia and Canada are introduced, and applicable establishment procedures for domestic railway industries are proposed.

  • PDF

성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구 (A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System)

  • 이상현;김우중
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

위험관리 프로세서와 평가의 새로운 접근 (Risk Management and Assessment Methodology in System Design)

  • 조희근;박영원
    • 한국군사과학기술학회지
    • /
    • 제2권2호
    • /
    • pp.197-208
    • /
    • 1999
  • 위험관리는 최근 다양한 분야의 산업에 적용 가능한 매우 중요한 토픽이다. 본 연구에서는 기본적인 위험관리의 일반적인 방법론과 새로운 위험관리 평가의 방법론을 제시한다. 위험관리의 실제 적용에 있어서 재정, 보험산업 등의 분야에서는 이미 많은 현실적 방법론들이 개발되었다. 다양한 산업현장에서 발전된 많은 적용사례들이 있으나 여전히 위험관리는 어려운 부분이며, 두 가지 주요한 위험평가 방법론이 시스템 엔지니어링 분야에서 개선되고 발전되어왔다. 그중 하나는 본래의 위험평가의 기본개념을 바탕으로 하여 발전한 것이며 다른 하나는 소프트웨어 엔지니어링분야의 위험평가에서 비롯된 것이다. 규모가 크고 복잡한 시스템에서 효과적인 위험관리는 프로젝트의 최종 목적을 달성하는데 있어서 불확실성에 적절히 대처하여 총 개발비용을 줄이고 목표일정과 성능을 달성하는 효과를 가져온다.

  • PDF

COTS 시스템 기반 속성 및 행위 분석에 의한 생명주기에 관한 연구 (A Study of Analysis of Attribute and Operation based on COTS System)

  • 이은서;김중수
    • 정보처리학회논문지D
    • /
    • 제17D권6호
    • /
    • pp.443-452
    • /
    • 2010
  • COTS(Commercial Off The Shelf) 시스템은 점점 더 재사용 개발에 있어서 중요한 일중의 하나로 되어가고 있다. 그것은 개발될 소프트웨어 품질 혹은 프로젝트 일정에 영향을 미칠 수 있는 COTS의 신뢰성을 포함한다. COTS 분석의 결과가 생길 수 있는 위험의 결과와 함께 프로젝트에 문서화되어야 한다. 효율적인 위험관리는 문제에 쉽게 대처할 수 있게 해주며, 그것이 수용할 수 없는 예산이나 일정 지연이 되지 않도록 해준다. 본 연구에서는 COTS 개발 시, 프로세스 이정표와 노력에 관한 위험요소 분석에 대한 기준을 제시한다.

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF