R & D 프로젝트의 위험분석모형의 연구

A Risk Analysis Model Using VERT for R & D Project Management

  • 황홍석 (동의대학교 산업공학과)
  • 발행 : 1995.04.01

초록

Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

키워드

참고문헌

  1. ADD 연구 보고서, MAAD-405-85116 연구개발 Progect 관리를 위한 확률적 Network 기법 연구 황홍석
  2. R&D Management v.19 no.4 Uncertainty and Stress in an R&D Project Environment Bodenstei,E.D.
  3. R&D Management v.20 no.2 An Application-Oriented Guide to R&D Project Selection and Evaluation Methods Fahrni,P.
  4. Opns. Res. v.29 no.4 Operations Planning with VERT Moeller,G.L.
  5. Network Analysis for Management Decisions Lee,S.L.
  6. Decision Science v.20 A Consistency Test for AHP Decision Makers Lane,E.F.;W.A.Verdini
  7. Post-Challenger Evaluation of Space Shuttle Risk Assessment and Management National Academy Press
  8. Interfaces v.16 no.4 The Analytic Hierarchy Process: A Survey of the Method and its Applications Zahedi,F.