• Title/Summary/Keyword: Safety Management System for Construction Projects

Search Result 84, Processing Time 0.028 seconds

Analysis of Practical Use Cases and Proposal for Improvements of Machine Guidance System Utilized in Smart City Construction Projects (스마트시티 건설현장에 활용된 머신 가이던스 시스템의 실무 활용사례 분석 및 개선방안 제시)

  • Kim, Sung Yeop;Lee, Won Hyo;Kang, Leen Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.3-10
    • /
    • 2024
  • The purpose of this study is to analyze the effects of smart construction equipment applied at the construction site of the first smart city in the Korea and derive an application strategy for the utilization of smart construction equipment. To achieve this, aythors examined the practical effects and issues of safety systems and construction systems utilizing machine guidance (MG) technology, which is a representative smart construction equipment used in civil engineering construction sites. Both the MG safety system and MG construction system were found to be sufficiently effective in improving construction productivity. However, there are challenges that need to be addressed, such as the approval process for work results using MG systems, system changes due to frequent replacement of on-site equipment, and usability improvements for elderly on-site workers. The study presented some solutions that have been implemented on-site to address these issues. The utilization effects and issues presented in the study were analyzed through direct feedback from workers and managers who have utilized the MG technology on-site for a considerable period of time. These results can be used as preliminary data for the similar construction projects, considering the limited availability of empirical analysis data for equipment automation.

Public Infrastructure Practitioner's Recognition on Project Performance (공공토목공사 실무자의 성과요인 인식차이 분석)

  • Park, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.93-100
    • /
    • 2007
  • Performance measurement and evaluation is a critical issue in public funded civil infrastructure projects in recent years. As a results, Korean government has introduced the related policies and regulations based on the foreign cases to evaluate public construction projects. However, construction circumstances are different from other countries and the results from adopted regulations are not satisfied. Therefore this research proposes the critical success factors(schedule, cost, productivity, change order, safety, quality) for public construction projects based on previous related research outputs to successfully implement construction performance evaluation. Then, this paper also proposes the weights for the critical success factors. The proposed weights are developed by AHP of construction experts. Furthermore, the paper shows the difference of the weights of the critical success factors by project participants (owner, constructor, engineering, and inspector). This efforts will enhance the ability to develop an effective performance evaluation process and system for public construction projects.

A Study on the Application Method of Construction Site Direct Construction System - Centered on domestic construction case - (건설현장 직접시공제도의 활용방안에 대한 연구 - 국내 건설 사례 중심으로 -)

  • Baek, Jae-Chul;Ock, Jong-Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.11
    • /
    • pp.171-180
    • /
    • 2019
  • This research proposed the Direct Construction System for construction corporations as a strategy intended to perform cause analysis of construction technician shortage matter and solve resulting problems, and in view of the outcomes from the application of this system to the projects and workshops, it was verified that unsteady employment, lack of career prospect, and conditions of work environment can be resolved. In addition, from corporations' perspective, it is considered that by clarifying the abovementioned three problems, fundamental complications of construction administration, quality control, safety supervision, and cost management were settled, concluding forthcoming advancement of domestic construction business quality fell far behind developed counties.

Spatiotemporal chronographical modeling of procurement and material flow for building projects

  • Francis, Adel;Miresco, Edmond;Le Meur, Erwan
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.119-139
    • /
    • 2019
  • Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. Better on-site management allows for substantial productivity improvements and cost savings. The procurement system should be able to manage a wider variety of materials and products of the required quality in order to have less stock, in less time, using less space, with less investment and avoiding multiple storage stations. The objective of this paper is to demonstrate the advantages of using the Chronographic modeling, by combining spatiotemporal technical scheduling with the 4D simulations, the Last Planner System and the Takt-time when modeling the construction of building projects. This paper work toward the aforementioned goal by examining the impact that material flow has on site occupancy. The proposed spatiotemporal model promotes efficient site use, defines optimal site-occupancy and workforce-rotation rates, minimizes intermediate stocks, and ensures a suitable procurement process. This paper study the material flow on the site and consider horizontal and vertical paths, traffic flows and appropriate means of transportation to ensure fluidity and safety. This paper contributes to the existing body of knowledge by linking execution and supply to the spatial and temporal aspects. The methodology compare the performance and procurement processes for the proposed Chronographic model with the Gantt-Precedence diagram. Two examples are presented to demonstrate the benefits of the proposed model and to validate the related concepts. This validation is designed to test the model's graphical ability to simulate construction and procurement.

The Improvement Plan of Project Management for Highway Construction Supervisor using Construction Management Benchmarking of Developed Countries (선진국의 공사관리 벤치마킹을 통한 도로건설공사 감독자의 공사관리 향상방안)

  • Lee, Min-Woo;Shin, Eun-Young;Lee, Kyo-Sun;Park, Hwan-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.138-148
    • /
    • 2006
  • The construction supervisors of the public companies are usually responsible for process management, quality management, safety management, and many other various tasks that occur during construction project. Public companies such as Korea Highway Corporation have developed a framework and manual for management and supervision of construction projects. But, there has been the change of business environment such as increase of private investment project and the introduce of construction management system recently. It has been necessary for construction supervisor to streamline the current project management system in the owner's aspect in order to cope with the expected new challenges. Accordingly, this research has been investigated and analyzed the operation system between Korean supervisor and foreign supervisor in their public corporation. This research has suggested the advanced project management in their public corporation. Especially, this study has proposed the construction management manual for supervisors such as inspectors training, supervisors construction manual, and supervisors training road map.

Development of Real-Time Locating System for Construction Safety Management (건설 안전관리를 위한 실시간 위치추적(RTLS)기술 개발)

  • Lee, Kwang-Pyo;Lee, Hyun-Soo;Park, Moon-Seo;Kim, Hyun-Soo;Baek, Yun-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.106-115
    • /
    • 2010
  • Recently, as the size of construction projects are getting bigger and higher, more effective managing methods are required in management areas such as duration reduction, cost reduction and quality management. In the current construction industry, conjunction with IT(Information Technology) is being noticed as a solution to support these needs. Various IT solutions such as Bar Code, Personal digital assistant(PDA), global positioning system(GPS), radio frequency identification(RFID) are being developed. In this research, among the various IT solutions, the Real Time Locating System(RTLS) which is acknowledged as a technology with high applicational potential is analyzed. Based on this analysis, a locating system to apply in construction sites is developed and validated. The locating system is developed to prevent construction disasters through real-time management of workers and equipment, which enables effective application in the area of construction safety management. Moreover, applications of the locating system in many different areas like construction material realtime monitoring, construction automation, construction quality management, maintenance management are expected.

A Development Plan for PMIS based on Total Life Cycle (전수명주기를 고려한 PMIS개발 방안)

  • Park, Soo-Choong;Lee, Seong-Gwon;Jung, Kye-Young;Kim, Jae-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1282-1288
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

A linked data system framework for sharing construction defect information

  • Lee, Doyeop;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.232-235
    • /
    • 2015
  • Defect data contains experiential knowledge about specific work conditions. And the number of projects performed by a company is too limited for an individual to experience the various defects under the current complex construction environment. Therefore, in order to manage and prevent a reoccurrence of defects, a proper data feedback mechanism is required. However, most defect data are stored in unstructured ways, resulting in the fundamental problem of data utilization. In this paper, a new framework is proposed by using linked data technologies to improve defect data utilization. The target of this framework is to convert defect data to the ontology-based linked data format for sharing defect data from different data sources. To demonstrate it, some technical solutions are implemented by using real cases. The proposed approach can reduce data search time and improve the accuracy of search results as well. Moreover, the proposed approach can be applied to other domains that need to refer to external sources such as safety, specification, product, and regulation.

  • PDF

A Study on Project Resource & Information Management with Internet Application(PRIMA system) (디지털 정보화를 통한 현장 자원 및 정보관리 기술에 관한 연구(PRIMA 시스템))

  • Kim Oe-Gon;Lee Dong-Ryul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.88-97
    • /
    • 2001
  • The Internet, the main issue of a new millennium, is being researched vitally for the progress of the construction industry, and the construction industry is considered to be led into a high-value added state-of-arts technology industry through CALS. Even if many construction companies gradually widen the use of the Internet for various purposes such as an electronic bidding system and an e-commerce system, the companies are still demanded to use the Internet more broadly and practically. Hence, the need for a tool for fast decision making and an effective construction management has risen. The PRIMA system has been developed specifically focused on meeting with those recent changes of the construction industry. This system is composed of three parts. Those are Just In Time(JIT) management, integrated application of man power${\cdot}$safety${\cdot}$work management and decision making process based on real-time information in the Internet. The usefulness of the PRIMA system has already been proved in a super-scale construction project. As the Internet environment get improved the use of the tool will be spread out gradually for many construction projects, regardless their size and location.

  • PDF

A component-based construction process control system for increasing modifiability (변경 용이성 증대를 위한 컴포넌트 기반의 건설공정관리시스템)

  • Kim, Eui-Ryong;Kim, Sin-Ryeong;Kim, Young-Gon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.6
    • /
    • pp.303-309
    • /
    • 2015
  • The construction process and safety management are an important means of the total projects for the decision-making. As an important management tool of cost, resources and risks of the project, the analysis and evaluations are recorded as an important asset of company. Also, it has become a safety device that could reduce risk factors repeatedly by the decision-making methods for the future similar projects. Component-based software, by reusing the useful part, which was prepared without newly developing all that, by building a new software product, the long-term continuous/steady through the provision of a component-based software, by securing a sales base, it should be the development and supply a wide range of applications. In this paper, we propose the construction process control systems for increasing modifiability of process creation and modification for business efficiency in accordance with the diverse trends in the construction process as a low-cost niche through a component-based software supplier to solve these problems.