Prediction Model with a Logistic Regression of Sequencing Two Arrival Flows (합류하는 두 항공기간 도착순서 결정에 대한 로지스틱회귀 예측 모형)

  • Jung, Soyeon;Lee, Keumjin
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.23 no.4
    • /
    • pp.42-48
    • /
    • 2015
  • This paper has its purpose on constructing a prediction model of the arrival sequencing strategy which reflects the actual sequencing patterns of air traffic controllers. As the first step, we analyzed a pair-wise sequencing of two aircraft entering TMA from different entering points. Based on the historical trajectory data, several traffic factors such as time, speed and traffic density were examined for the model. With statistically significant factors, we constructed a prediction model of arrival sequencing through a binary logistic regression analysis. With the estimated coefficients, the performance of the model was conducted through a cross validation.

A Study on Proper Acquisition Cost Estimation Using the PRICE Model (PRICE모델을 이용한 적정 획득비용 추정 방안)

  • 한현진;강성진
    • Journal of the military operations research society of Korea
    • /
    • v.27 no.1
    • /
    • pp.10-27
    • /
    • 2001
  • This paper deals with the application of PRICE model in estimating the proper acquisition cost for weapon budgeting phase. The PRICE(Parametric Review of Information for Costing and Evaluation) Hardware model is a computerized method for deriving cost estimates of electronic and mechanical hardware assemblies and systems. The model can be used in obtaining not only initial cost estimates in conceptual phase, but also detailed cost estimates in budgeting phase depending on available historical and empirical data. We analyzed first step cost estimate parameters and derived cost equations using PRICe output dta. Using weight and complexity, We can find cost variation. Sensitivity analysis shows that cost increases exponentially as complexity increases exponentially as complexity increases. We estimated KAAV\`s (Korea Amphibious Assault Vehicle) production cost using the PRICE model and compare with engineering cost estimates which is based on actual production data submitted by the production company. The result shows that tow estimates are close within $\pm2%$ differences.

  • PDF

Evaluation of Water Quality Prediction Models at Intake Station by Data Mining Techniques (데이터마이닝 기법을 적용한 취수원 수질예측모형 평가)

  • Kim, Ju-Hwan;Chae, Soo-Kwon;Kim, Byung-Sik
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.5
    • /
    • pp.705-716
    • /
    • 2011
  • For the efficient discovery of knowledge and information from the observed systems, data mining techniques can be an useful tool for the prediction of water quality at intake station in rivers. Deterioration of water quality can be caused at intake station in dry season due to insufficient flow. This demands additional outflow from dam since some extent of deterioration can be attenuated by dam reservoir operation to control outflow considering predicted water quality. A seasonal occurrence of high ammonia nitrogen ($NH_3$-N) concentrations has hampered chemical treatment processes of a water plant in Geum river. Monthly flow allocation from upstream dam is important for downstream $NH_3$-N control. In this study, prediction models of water quality based on multiple regression (MR), artificial neural network and data mining methods were developed to understand water quality variation and to support dam operations through providing predicted $NH_3$-N concentrations at intake station. The models were calibrated with eight years of monthly data and verified with another two years of independent data. In those models, the $NH_3$-N concentration for next time step is dependent on dam outflow, river water quality such as alkalinity, temperature, and $NH_3$-N of previous time step. The model performances are compared and evaluated by error analysis and statistical characteristics like correlation and determination coefficients between the observed and the predicted water quality. It is expected that these data mining techniques can present more efficient data-driven tools in modelling stage and it is found that those models can be applied well to predict water quality in stream river systems.

A Geothermal Model of Pit Area Using Computational Fluid Dynamics (CFD를 이용한 피트의 지중열 모델 구축에 관한 연구)

  • Min, Joon Ki;Kim, Jeong Tai
    • KIEAE Journal
    • /
    • v.8 no.5
    • /
    • pp.11-16
    • /
    • 2008
  • This research has established CFD model on pit's cool-tube system through heat and air movement simulations, of which data was based on experimental and verification. This research work verified the effectiveness of the cool-tube system by analysing temperature, humidity and air current of the actually installed case. Also, we analysed heat transfer through air current simulation and the results are as followings. Firstly, we experiment on temperature, humidity and speed of air currents of the cool tube system with pit space during the month of May (spring). The average exterior temperature was $16.1^{\circ}C$, and $18.2^{\circ}C$ for the pit, $24.7^{\circ}C$ for the compressor room. Secondly, based on measured data of real case, we have analysed heat transfer through air current simulation and verified our proposed model. The actual measurement of average temperature of exhaust air of the pit's area is $19.7^{\circ}C$ with tolerance of $-0.33^{\circ}C{\sim}-0.6^{\circ}C$ compared to above simulations. Thirdly, having verified air current simulation model with formation of 260,000 and 1,000,000 cells, we could get reasonable near values with 260,000 cells. Lastly, the next step of research would be focused on proposing the best possible pit's cool-tube system after analysis of heat transfer of the air current simulation based on verified CFD model.

A study on the 3D Terrain Modelling Technique based on DEM data (DEM 데이타에 의한 3차원 지형 모델링 기법에 관한 연구)

  • Choi, Jeong-Dan;Jeong, Yun-Jong;Lee, Cheol-Won;Yoon, Kyung-Hyun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.2 no.2 s.4
    • /
    • pp.99-108
    • /
    • 1994
  • In this thesis, we propose the 3D terrain modelling method for the better understanding of the geographic information. The process of 3D terrain medelling consists of three steps. The first step is to obtain real-world data from satellite images and stored in the form of DEM(Digital Elevation Model). The second one is to extract the meaningful data from DEM data based on LOD(Level Of Detail). And the third is to construct the 3D surface by TIN(Triangulated Irregular Network) with the extracted meaingful data. The proposed dynamic TIN reconstruction algorithm locally reconstruct the existed TIN model with the additional a new point. In this way, we can construct the TIN with the reduced time and can simulated 3D terrain model in real time.

  • PDF

A study on a schedule-cost analysis model for defense R&D project planning (국방 R&D프로젝트의 일정-비용분석모델의 연구)

  • 황홍석;류정철;정덕길
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF

Non-Intrusive Load Monitoring Method based on Long-Short Term Memory to classify Power Usage of Appliances (가전제품 전력 사용 분류를 위한 장단기 메모리 기반 비침입 부하 모니터링 기법)

  • Kyeong, Chanuk;Seon, Joonho;Sun, Young-Ghyu;Kim, Jin-Young
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.4
    • /
    • pp.109-116
    • /
    • 2021
  • In this paper, we propose a non-intrusive load monitoring(NILM) system which can find the power of each home appliance from the aggregated total power as the activation in the trading market of the distributed resource and the increasing importance of energy management. We transform the amount of appliances' power into a power on-off state by preprocessing. We use LSTM as a model for predicting states based on these data. Accuracy is measured by comparing predicted states with real ones after postprocessing. In this paper, the accuracy is measured with the different number of electronic products, data postprocessing method, and Time step size. When the number of electronic products is 6, the data postprocessing method using the Round function is used, and Time step size is set to 6, the maximum accuracy can be obtained.

An Estimation of Kullback-Leibler Information Function based on Step Stress Accelerated Life Test (단계 스트레스 가속수명모형을 이용한 쿨백-라이블러 정보함수에 대한 추정)

  • 박병구;윤상철;조건호
    • The Korean Journal of Applied Statistics
    • /
    • v.13 no.2
    • /
    • pp.563-573
    • /
    • 2000
  • In this paper, we propose three estimators of Kullback-Leibler Information functions using the data from accelerated life tesb. This acceleration model is assumed to be a tampered random variable model. Some asymptotic properties of proposed estimators are proved. Simulations are performed for comparing the small sample properties of the proposed estimators under use condition of accelerated life test.

  • PDF

Design of Lateral Controller for Automatic Valet Parking and Its Performance Analysis with Respect to Vehicle Types (자동 발렛 파킹을 위한 횡방향 제어기 설계 및 차종변화에 대한 제어 성능 분석)

  • Choi, Heejae;Song, Bongsob
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.18 no.11
    • /
    • pp.1051-1058
    • /
    • 2012
  • The unified lateral control algorithm for automatic valet parking for various types of vehicles is presented and its feasibility is shown experimentally via field tests for the given parking scenario. First, a trajectory generation algorithm for forward driving and backward multi-step parking maneuvers is developed. Then, with consideration of different types of vehicles and operating conditions, a kinematic vehicle model is used and validated using field test data. Using the nonlinear vehicle model, the lateral controller is designed based on dynamic surface control. Finally the proposed lateral control law is validated via hardware-in-the-loop simulations for different types of vehicles and experimentally using a test vehicle through field tests.

An Optimization-based Computational Method for Surface Fitting to Update the Geometric Information of An Existing B-Rep CAD Model

  • Louhichi, Borhen;Aifaoui, Nizar;Hamdi, Mounir;BenAmara, Abdelmajid;Francois, Vincent
    • International Journal of CAD/CAM
    • /
    • v.9 no.1
    • /
    • pp.17-24
    • /
    • 2010
  • For several years, researchers have focused on improving the integration of the CAD, CAM and Analysis through a better communication between the various analysis tools. This tendency to integrate the CAD/Analysis and automation of the corresponding processes requires data sharing between the various tasks using an integrated product model. We are interested in this research orientation to CAD/CAM/Analysis integration by rebuilding the CAD model (BREP), starting from the Analysis results (deformed mesh). Because this problem is complex, it requires to be split into several complementary parts. This paper presents an original interoperability process between the CAD and CAE. This approach is based on a new technique of rebuilding the CAD surface model (Nurbs, Bezier, etc.) starting from triangulation (meshed surface) as a main step of the BREP solid model. In our work, the advantages of this approach are identified using a centrifugal pump example.