• Title/Summary/Keyword: SCADA system

Search Result 290, Processing Time 0.035 seconds

Improvement of RGS performance in SCADA system (SCADA 시스템 RGS 성능개선연구)

  • 우희곤;최성수
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1988.10a
    • /
    • pp.674-677
    • /
    • 1988
  • SCADA (Supervisory Control And Data Acquisition) system for control and supervision of power system is now being operated in KEPCO with high performance. But the performance of RGS(Report Generating System) is comparatively insufficient because the SCADA system was produced for special purpose performing in real time. Therefore, we have performed this study applied for the purpose of processing the statistic data of power network and improving facilities and availabilities of the system.

  • PDF

A Study on the Design of Small Unit SCADA System for Electric Railroad (전기철도용 소규모SCADA 시스템 설계방안에 관한 연구)

  • Lee, Seung-Chul;Shin, Kwan-Woo;Lee, Youn-Seop
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.53 no.2
    • /
    • pp.89-93
    • /
    • 2004
  • Supervisory Control And Data Acquisition(SCADA) of electric power system refersto the system that displays, monitors and executes the control commands for remote electric power system. KNR's existing electric power control system is built on UNIX platform such that it costs more for system construction, and people with UNIX skills can only be an operator who controls and manages the system. Moreover, since the system is mainly operated in local offices, system operators must communicate with local operators to investigate the cause of the accident and react the accident every time the system fails. As a new integrated SCADA system is constructed, establishment of small-unit electric power control system, that alters local electric power control system in designated stations, is required. In this study, the electric power control system, which accommodates all functions of UNIX-based SCADA system and facilitates operation and even maintenance for local operators, is to be developed. In order to develop small-unit electric power control system, the industrial automation program, "Cimon", is used. The small-unit electric power control system that accommodatesRTU and newly installed electronic switchboard is being developed and tested at Chulam station of KNR.

Development of Automatic Judgement System of Radial T/L System for Preventing Power Device's Wrong Control in SCADA (SCADA에서의 설비 오조작 방지를 위한 방사상계통 자동판별시스템 개발)

  • Jeon, Dong-Hoon;Kim, Tae-Won;Shim, Jeong-Woon;Kim, Kern-Joong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.1
    • /
    • pp.1-7
    • /
    • 2008
  • In this paper, we proposed the method judging whether transmission system is radial system or loop system using simple set theory. And we proposed the method judging whether power device's operation causes of blackout or not. Using proposed method, we developed automatic judgement system of radial system for preventing power device's wrong control in SCADA. Finally, we simulated a variety of case study using SCADA simulator with developed system, and verified reliability of the result and performance of developed system.

The impact of distributed/open architecture on Seoul regional control center SCADA system of KEPCO (한국전력 서울지역급전소 SCADA 시스템의 분산/개방형 구조)

  • 김용팔
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10a
    • /
    • pp.1147-1154
    • /
    • 1993
  • This paper introduces a case of SCADA System replacing from centralized processing system to distributed/open architecture system. The cons and pros of the distinctive two system configurations were studied and the requirements of new system that would be enable to easily follow 21 century's technical and operational inovation were presented.

  • PDF

The configuration of optimal structure for substation SCADA system (최적규모의 변전소 집중원방감시제어(SCADA) 시스템 구성)

  • 이용해;남태현
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1988.10a
    • /
    • pp.678-682
    • /
    • 1988
  • Current substation SCADA system has only one control center where two or three operaters monitor and control more than 40 substations spreaded far and wide. The scope of this system is too wide to cope with the concurrent multiple accidents in electric network by the typhoon and large mow. This paper describes the method to organize the optimal structure of substation SCADA system using remote console and small scale control center.

  • PDF

Development of SCADA Simulator for Power System Operator (기존 SCADA 시스템의 훈련용 시뮬레이터 개발)

  • Choe, Seong-Su;Woo, Hee-Gon;Suh, Joong-Seok
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.522-524
    • /
    • 1993
  • This paper discusses the training simulator designed to improve the skills of operators who handle the SCADA System of KEPCO (Korea Electric Power Co. ). The system is composed of the simulation subsystem and database, and implemented on the 380-based P. C. It is 1 inked to existing SCADA system (HARRIS and TADCOM) to work realistically for the situation of accidents and corresponding actions.

  • PDF

A study on development of multimedia SCADA system for electric facility (영상정보 통합형 전기설비 감시시스템 개발 연구)

  • Lee, W.T.;Lee, J.J.;Jeong, Y.K.;Kim, K.H.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07g
    • /
    • pp.2445-2447
    • /
    • 1998
  • For increasing the quality of SCADA system, the application of image information is demanded from typical SCADA system based on data information. Until now, the remote control and monitoring systems combine data information but now gradually have trends to combine voice, data and image information. So multimedia technology is applied to realize new SCADA system. Depends on these requires, we apply new concepts of communication network and multimedia technology to the SCADA system for electric facility. In this paper, we aim at developing multi media supervisory control and data acquisition system based on data and image information, which used electric power system and security system.

  • PDF

Remote structural health monitoring systems for next generation SCADA

  • Kim, Sehwan;Torbol, Marco;Chou, Pai H.
    • Smart Structures and Systems
    • /
    • v.11 no.5
    • /
    • pp.511-531
    • /
    • 2013
  • Recent advances in low-cost remote monitoring systems have made it possible and practical to perform structural health monitoring (SHM) on a large scale. However, it is difficult for a single remote monitoring system to cover a wide range of SHM applications due to the amount of specialization required. For the remote monitoring system to be flexible, sustainable, and robust, this article introduces a new cost-effective, advanced remote monitoring and inspection system named DuraMote that can serve as a next generation supervisory control and data acquisition (SCADA) system for civil infrastructure systems. To evaluate the performance of DuraMote, we conduct experiments at two representative counterpart sites: a bridge and water pipelines. The objectives of this article are to improve upon the existing SCADA by integrating the remote monitoring system (i.e., DuraMote), to describe a prototype SCADA for civil engineering structures, and to validate its effectiveness with long-term field deployment results.

An analysis according to the caange in power SCADA systems from the viewpoint of the operator (운영자입장에서 본 전력 SCADA시스템 변화에 따른 분석)

  • Oh, Sung-Hyo;Choi, Sang-Chun;Choi, Si-Haeng
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.407-416
    • /
    • 2008
  • The OCC of Seoul Metro whose operation began in 1974 is in charge of conveying 4,000,000 passengers across 117 subway stations in travel zones of 134.9Km in length. It continues to strive to ensure passenger safety by applying state-of-the-art-technology to each control system without delay. The power control center especially designed to provide power system operations for all stations of Seoul Metro(Line 1 to 4) and the rolling stocks implements preventive safety systems with the real time power system operational information on changes in conditions from the field through the power SCADA system(41 substations, 117 stations, 137 terminal units). This paper reports the differences of each line's power SCADA system(power SCADA systems of Seoul Metro(Line 1 to 4)), the roles and functions of the system, and the system operating characteristics and limits from the standpoint of the operator.

  • PDF

Applying Asymmetric Key Encryption to Secure Internet based SCADA

  • Robles, Rosslin John;Kim, Tai-hoon
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.4 no.2
    • /
    • pp.17-21
    • /
    • 2012
  • As an acronym for Supervisory Control and Data Acquisition, SCADA is a concept that is used to refer to the management and procurement of data that can be used in developing process management criteria. The use of the term SCADA varies, depending on location. Conventionally, SCADA is connected only in a limited private network. In current times, there are also demands of connecting SCADA through the internet. The internet SCADA facility has brought a lot of advantages in terms of control, data generation and viewing. With these advantages, come the security issues regarding web SCADA. In this paper, we discuss web SCADA and its connectivity along with the issues regarding security and suggests a web SCADA security solution using asymmetric-key encryption.