• Title/Summary/Keyword: Route Alignment

Search Result 43, Processing Time 0.025 seconds

Geological feasibility and slope stability analysis under GIS environment for rail route alignment

  • Jain, Kamal;Kumar, Anand
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.186-188
    • /
    • 2003
  • Rail Route Alignment in hilly terrain is a difficult task to implement as several natural constraints poses threat to the safety and stability of the alignment. The conventional methods followed to find out the final location survey or the feasibility analysis for alignment is time taking consuming. Some times, due to inaccessibility of the terrain it becomes impossible to carry out such works. The construction works in hilly terrain, which are associated with the proposed alignment, are not same as carried out in plane areas due to a vast contrast between the two areas. Different geological structures such as faults, thrusts, synclines and anticlines are a big problem to carry out normal construction practices. Thus for a safe and stable railway route in the unstable hilly areas, it is required to carry out the feasibility analysis of the proposed alignment to assist the policy makers for a successful implementation of the alignment. In the present work Remote Sensing and GIS has been successfully used to carry out geological feasibility and slope stability analysis for rail route alignment work.

  • PDF

Optimization of Railway Alignment Using GIS (GIS를 이용한 철도선형최적화)

  • 강인준;이준석;김수성
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.727-732
    • /
    • 2002
  • This study is to develop the model of alignment optimization based on design criteria by approaching through alignment of railway design and problems in economy, environment and technology for satisfying traffic volume of the main roads caused by economical and social developments. Now, Geographic Information System isn't applied when designing a present railway in home. And the design of railway alignment is still set on importance of transition curves and cant according to passenger comfort in abroad so tile study of railway alignment is at initiation phase so far. This paper is about decision of optimal alignment between two stations such as starting point and ending point automatically using GIS in optimization of railway alignment. A route between Sungsan city and Shinpung city is the training area and the study compared and evaluated optimal railway route by GIS automatically with present railway route designed. Present optimal fomulas was used in this study for optimization of railway alignment. The model of optimization of railway alignment was developed through topographical elements and it was mentioned by the model of road alignment because of the similarity in design of alignment. But the design of lateral track irregularities, cant fur passenger comfort and motion sickness fellowed by train rolling have to be considered more. Anyway, this study farmed the basis of using GIS and the study should be keep going on in the future.

  • PDF

Building of Efficient Route Alignment Information using GSIS -Focused on plan and vertical alignment- (GSIS를 이용한 효율적 도로선형 정보의 구축 - 평면 및 종단선형을 중심으로 -)

  • 강상구;정영동
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.4
    • /
    • pp.325-333
    • /
    • 2000
  • This paper deals with real time building of route and vertical alignment information system for the efficient and scientific management using GSIS. First, we redesigned route and vertical alignment for obtained basic data using road projector(road design main software). Using by these acquired result, we made a database on road plan and vertical alignment drawing as a basic information being used to construction of road complex information system. The main objectives in this study are the rational maintenance road planing for drawings, its database and the systematization of route information management through the fast updating, mending, supplement. Result of this study enables us to manage route information.

  • PDF

Development of Disaster Risk Analysis System for Environment Friendly Road (친환경 도로노선의 재해위험도 평가시스템 개발)

  • Song, Min-Tae;Kang, Ho-Geun;Kim, Heung-Rae;Lee, Tae-Ock;Lee, Han-Joo
    • International Journal of Highway Engineering
    • /
    • v.14 no.5
    • /
    • pp.123-132
    • /
    • 2012
  • PURPOSES: This study is to investigate the consideration which relates with a disaster from route alignment process and proposed the method it will be able to evaluate a disaster danger fixed quantity. METHODS: Use the landslide disaster probabilistic map of GIS based and in about landslide occurrence of the route alignment at the time of neighboring area after evaluating a risk fixed quantity, it compared LCC expense in about each alternative route. It developed the system it will be able to analyze a LCC and a disaster risk in about the alternative route. In order to verify a risk analytical algorithm and the system which are developed it selected national road 59 lines on the demonstrative route and it analyzed a disaster risk. RESULTS: Demonstrative route not only the disaster risk to be it will be able to compare a disaster risk fixed quantity like the economical efficiency degree in compliance with LCC expense productions it compared and there being the designer will be able to decide the alternative route, it confirmed. CONCLUSIONS: Roads can be designed by considering occurs repeatedly landslides and debris flow caused by disasters in advance and expect to be able to effect that can reduce the overall cost to recover losses caused by the disaster, and temporally loss is expected.

Developing Ecological Trails and Route Alignment for Revitalizing Rural Traditional Theme Village in Naegok-ri (농촌전통테마마을 활성화를 위한 내곡리 여산팔경 마을 생태탐방로 노선설정 방안 연구)

  • Lee, Seung-Joo;Han, Bong-Ho;Kang, Hyun-Kyung;Lee, Soo-Dong;Kim, Sang-Bum
    • Journal of Korean Society of Rural Planning
    • /
    • v.15 no.3
    • /
    • pp.61-79
    • /
    • 2009
  • This study discusses developing ecological trails and route alignment in mountainous rural area. Through a process of ecological resources survey, ecological trails and route alignment has been established. Mainly, by focusing on ecological resources in rural areas, it was indifferent to their own ecological resource and charm to make it unique strengths. Based on survey the results, Natural ecology resources, there were the climate factor, surface, geological, terrain analysis. Furthermore, ecological resources were researched and analyzed the elements of it, distribution of resources, types, location, semantic analysis. The results are expressed on the map and recorded by taking pictures. Plant ecosystem, there were actual vegetation, land use, flora analysis. Wild animal ecosystem, it was checked and recorded on 1/1,000 map partition the emergence of wild birds, the number of species distributed by foraging guild, the emergence of amphibians, reptile, mammals and insect species. The site is chosen as rural theme village in 2007, base on their own rich ecological and landscape resources. Therefore, we carried out ecological trails and route alignment plan in accordance with analyzed the natural ecological resource and after setting up the basic goal, ecological trail has been composed and planting has done and direction.

Comparative Study on Determining Highway Routes (도로의 최적노선대 선정방법 비교 연구)

  • Kim, Kwan-Jung;Chang, Myung-Soon
    • International Journal of Highway Engineering
    • /
    • v.8 no.4 s.30
    • /
    • pp.159-179
    • /
    • 2006
  • By using the current road design method that is based on the regulation about structure and facilities standard of the road and the route plan guide of a national road and the alignment optimization road design method which is studied in the inside and outside of country, this study operate the route plan of the sample study and compare and analysis the route character, consequently the current design method has local optimization that is formed the plan by the stage and the section. Alignment optimization road design has the system optimal route search. But cost function has limite that caused by construction parameter that is not included in cost function. So we design a road route included cost function in main fields. As a result, we obtain a realistic and economically road route. The alignment optimization road design model has to be made up some problems, like the change of vertical gradient in the tunnel section, though this defects it has a lot of merits as a geometric design tool, especially in the feasibility study and the scheme design.

  • PDF

Formulation and Evaluation of Railway Optimal Alignment Design Model (철도 최적 노선설계 모형의 해석과 적용)

  • Kim, Jeong Hyun;Shin, Youngho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1845-1850
    • /
    • 2014
  • Railway operators have given a lot of efforts to determine the railway route of the minimum cost. In order to determine the optimal alignment, the alignment should be allocated satisfying the design criteria on various geographical condition with the minimum earth works. The determination of the optimal railway alignment is a kind of combination optimization because that must consider various design elements. This study developed a numerical model to determine the optimal railway alignment with the minimum construction cost. The problem was analyzed by the genetic algorithm, and the concept of the optimal alignment was established with the results from the analyses. The methodology was applied to a fictitious rail construction section and the result was evaluated. This methodology is meaningful considering the fact that the cost for energy is greater than that of the construction.

Route Planning Considering Risk Factors Based on GIS (GIS 기반의 리스크 요인을 고려한 노선 계획)

  • Roh Tae-Ho;Jang Ho-Sik
    • International Journal of Highway Engineering
    • /
    • v.8 no.3 s.29
    • /
    • pp.1-19
    • /
    • 2006
  • Researches on method for quantitative analysis applied with decision-making in consideration of variation in risk factors based on GIS(Geographic Information System) concluded as follows. Firstly, by way of decision-making in consideration of variation in risk factors, quantitative analysis performed for the existing route was applied to the new route, which would bring about reliable criteria in route planning and basic design stage. Secondly, horizontal and vertical alignment were easily available out of GIS for relatively speedy design and analysis with three dimensional alignment by decision-making in route planning. Thirdly, automation of route alignment is possible by utilizing quantitative evaluation system established in this research so that a risk analysis can be carried out in a relatively short time. Therefore it will eventually contribute to further development of road design technology.

  • PDF

A Study on the Earth-work Volume Calculation for Route Alignment of Highway (도로선형의 결정에서 토공량 산정에 관한 연구)

  • 최재화;이석배;심정민
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.11 no.2
    • /
    • pp.89-100
    • /
    • 1993
  • This paper is a study on the earth volume calculation using CAD and LISP(LIST Processing) in the route alignment. The utility enlargement in the industry field and the considerable progress of computer make the automatic design and manufacture for the development of CAD/CAM/CAE technique possible, and the automatic design of civil engineering works is continuously progressive. In this study we are intend to improve an effect of civil engineering work by the automatic earth volume calculation in route alignment. This paper aims to construct the automatic design system of civil engineering work and the procedures; (1) The programming of the self-scanning program of the land information introducing Digital Terrain Model concept in the map (2) Systematic algorithm construction using LISP and grafting CAD system (3) Automatic design and calculation of the mass curve and earth volume.

  • PDF

Development of VR Simulation Algorithm and System for Supporting Optimal Road Design Information (가상 시뮬레이션에 의한 도로설계정보 최적화 방법론 및 지원체계 개발)

  • Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.101-110
    • /
    • 2009
  • The current virtual reality(VR) simulation functions in construction project are focused on the construction phase. This study attempts to extend the application of VR functions to the design phase. This study suggests various VR functions such as earthwork simulation by road alignment, alternative route selection simulation, structure type selection simulation and underground structure visualization simulation. These functions can visualize road route and earthwork condition and select an optimal design route by simulating virtual placement of alternative route. This study configures systematic methodology for suggested VR simulation functions and develops VR system by the functions. Finally this study suggests an improved design process of road construction project by using the developed VR functions