• Title/Summary/Keyword: Road management

Search Result 1,534, Processing Time 0.032 seconds

Traffic Congestion Management on Urban Roads using Vehicular Ad-hoc Network-based V2V and V2I Communications (차량 애드혹 네트워크 기반 V2V와 V2I 통신을 사용한 시내 도로에서의 교통 체증 관리)

  • Ryu, Minwoo;Cha, Si-Ho
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.18 no.2
    • /
    • pp.9-16
    • /
    • 2022
  • The nodes constituting the vehicle ad hoc network (VANET) are vehicles moving along the road and road side units (RSUs) installed around the road. The vehicle ad hoc network is used to collect the status, speed, and location information of vehicles driving on the road, and to communicate with vehicles, vehicles, and RSUs. Today, as the number of vehicles continues to increase, urban roads are suffering from traffic jams, which cause various problems such as time, fuel, and the environment. In this paper, we propose a method to solve traffic congestion problems on urban roads and demonstrate that the method can be applied to solve traffic congestion problems through performance evaluation using two typical protocols of vehicle ad hoc networks, AODV and GPSR. The performance evaluation used ns-2 simulator, and the average number of traffic jams and the waiting time due to the average traffic congestion were measured. Through this, we demonstrate that the vehicle ad hoc-based traffic congestion management technique proposed in this paper can be applied to urban roads in smart cities.

The Method of Creating the Road Network Database for an Integrated Road Management System (도로관리 종합정보 시스템을 위한 도로망 데이타베이스 구축방안)

  • 김충평;이강원;김경희
    • Spatial Information Research
    • /
    • v.3 no.1
    • /
    • pp.55-63
    • /
    • 1995
  • The database design, which logically sets the base structure and orga¬nization of the database, is performed by considering the users requirement, the relations between various data, and the relations between data and application field.The road network data must be created to have geometrical topological structure, because various data elements are needed to recognize the state of each section and to relate between data element. In this study, we propose a method of creating the road network database for an integrated road management system.

  • PDF

Case Study on the Mitigation of Dangerous Slope Considering the Value of Geoheritage (지질유산 가치를 고려한 위험비탈면 보존 방안 사례 연구)

  • Jeong, Jun-Ho;Kim, Seung-Hyun;Park, Byung-suk;Woo, Yong-Hoon;Kang, Yun-seok;Koo, Ho-bon;Son, Moon
    • The Journal of Engineering Geology
    • /
    • v.30 no.1
    • /
    • pp.71-84
    • /
    • 2020
  • Various geological structures are found on the slope of Bangnim district in Pyeongchang, Gangwon-do, based on the Paleozoic Joseon Supergroup Limestone. The recumbent fold observed on the slope is a very rare geological structure that has not been found in Korea, and has important academic value in exploring the formation process of the Paleozoic geological structures in the Gangwon region. In this study, discussed the geological value of the geological structure observed on the slope of the road, and studied the management method of rockfall problem slopes. The state of development of recumbent folds has conservation value in geological scarcity and specificity. Preservation management measures should be prepared through the protection of slopes and measures to reduce of rockfall risks as geoheritage with an important value in geology science and education. Furthermore, it is expected to be preserved and utilized as a geopark.

A Study on the Analysis of the Effect DFS installation on Urban Arterial Road (도시간선도로에서의 DFS 설치 효과 분석에 관한 연구)

  • Choi, Hyun-Seok;Kim, Hong-Sang;Lim, Geun-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.5
    • /
    • pp.101-112
    • /
    • 2009
  • Recently, with the existing speed-management by law enforcements and physical speed-reduction facilities, the country newly adopted Driver Feedback Sign (DFS) system, which displays driving speed in order to guide the driver to an advisable driving condition. DFS is mainly used in school zones due to reasons related to the ITS. Accordingly, because it is predictable that DFS will result in speed-reduction without legal forces and would have an effect on physical speed-reduction facilities, intersection, crosswalks, and road-alignments, this study will try to verify the efficiency of DFS by researching the vehicle speed in national highways and school zones, which have similar conditions to the urban arterial road. In consequence, on national highways, the drivers had a tendency to travel according to the road-environment such as urban arterial road and not reduce speed voluntarily. In school zones, drivers tend to reduce speed in mornings and afternoons when children travel to school or home, showing that the resulting effect is different according to the road-environment where DFS is installed, and the time slot of the DFS.

Construction Workers' Sensation-Seeking and Inattentiveness to Warning Alarms from Construction Vehicles

  • Kim, Namgyun;Gregoire, Laurent;Anderson, Brian A.;Ahn, Changbum R.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.261-268
    • /
    • 2022
  • In road work zones, pedestrian workers' habituated inattention to warning alarms from construction vehicles can lead to fatal accidents. Previous studies have theorized that human factors such as personality traits may affect workers' inattentiveness to workplace hazards. However, there has been no study that directly examined how road construction workers' personality traits affect their attention to warning alarms within a work zone and the likelihood of engagement in a struck-by accident. This study examines how workers' sensation-seeking (especially boredom susceptibility) is related to inattention to warning alarms while performing a task in road work zones. An experiment with actual road construction workers was conducted using a virtual road construction environment. Workers' attention to repeatedly presented warning alarms was measured using eye-tracking sensors. In response to workers' frequent inattentive behaviors, a virtual accident was simulated. Results revealed a significant association between boredom susceptibility and workers' engagement in the virtual accident, a consequence of inattentiveness to warning alarms. The findings suggest that workers' personality traits predispose them to tune out warning alarms and become vulnerable to accidents in road work zones. The findings of this study can be used to develop targeted interventions aimed at preventing workers' inattention to repeatedly exposed workplace hazards, thereby contributing to reducing fatal accidents in road work zones.

  • PDF

ANALYZING CAUSES OF CHANGE ORDERS IN KOREA ROAD PROJECTS

  • Kang-Wook Lee;Wooyong Jung;Seung Heon Han;Byeong-Heon Yoon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1283-1287
    • /
    • 2009
  • The Korean government implemented 259 road projects from 2004 to 2007, valued at $18.4 billion. Change orders of these road projects occurred 8,973 times and, subsequently, caused significant increases in the cost of the projects, approximately up to $4.2 billion (22.8% of the initial budget). These significant problems of huge change orders require a more workable control system for budget management whereas the effectiveness of the government's control is still not satisfied. However, previous approaches and studies mostly limited their analyses to simply classifying the causes of the change orders. This paper investigates the real frequency and cost impacts incurred by each cause of a change order, primarily based on 218 road projects in Korea. The paper then identifies the attributes of change orders through a survey of 204 project participants in that those sources were inevitable or avoided if properly managed. The causes of the change orders are further analyzed with analysis of variance (ANOVA) in connection with contract volume, bid award rate, the contractor's capacity to perform, and the design company's capacity. This study found that if the contract volume is smaller, then the possibility of change orders is higher. Interestingly, if the bid award rate is less than 67.5%, it signifies the highest rate of change orders. In addition, the contractors whose construction ability is assessed as the top-ranked group showed the lowest change order rates. With these results, this paper provides the preventive guidelines for reducing the likelihood of change orders.

  • PDF

Management Of Road Ledger Using Facility Database (시설물 데이타베이스에 의한 도로대장관리)

  • 강인준;박기태;정재형
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.11 no.2
    • /
    • pp.101-106
    • /
    • 1993
  • This study is a efficient management techniques of road by facility database. The purpose of road ledger investigate the property of road facility, the present condition of the location, the quality of the material of the ground and underground facility. Also, this is used to make plan for construction, and investment program of the road. To build road database, photogrammetry, ground control surveying and aerial photogrammetry must be performed. After the research of the road facility, a underground facility map and the road drawings are to be made. In this study, model area is the KUMJUNG-KU in Pusan where an industrial road is located on. There are about 7,000 signal lampes and traffic safety boards. It is possible to manage scientifical and efficient road ledger though statistical handling using facility database. In this paper, authors found the database of road facility through basic circumstances in the use of SML of ARC/INFO.

  • PDF

Management of Infrastructure(Road) Based On Asset Value (자산가치 기반의 교통인프라 유지관리)

  • Dong-Joo Kim;Woo-Seok Kim;Yong-Kang Lee;Hoon Yoo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.3
    • /
    • pp.100-107
    • /
    • 2024
  • Currently, in Korea, due to the rapid aging and deterioration of facilities, the minimum Maintenance Level and Performance Level' of facilities are required by the 'Facility Safety Act' or 'Infrastructure Management Act'. Since infrastructure assets have a long lifespan and the pattern of deterioration over time is complex, it is very difficult to maintain infrastructure as 'minimum maintenance state' or 'minimum performance state' by the current way of management. 'Asset Management' shall be performed not only by a technical perspective, but also by an accounting perspective such as cost and asset value. However, due to lack of awareness of 'asset management' among stakeholder, only technical perspective management is being carried out in practice. In order to effectively manage infrastructure assets, complex consideration of various asset value factors such as budget and service as well as safety and durability are required. In this paper, we presented a theory to evaluate and quantify the road network value for efficient asset management of the road network. We also presented a method of simulation to apply the theory presented in this paper. Through simulation and the results derived from this study, it is possible to specify the budget for the future national asset management, and to optimize the strategy for the management of old road facilities.

System Development and Field Application for Measuring installation Interval and Height of Road safety Facilities Using a tine Scanning Camera (라인스캔 카메라를 이용한 도로 안전시설 설치간격 및 높이측정 시스템 개발 및 현장적용)

  • Moon, Hyung-Chul;Suh, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.10 no.3
    • /
    • pp.231-237
    • /
    • 2008
  • One of the basic requirements for the most advanced countries would be the well-planned traffic infrastructures. For such traffic safety systems, foreign countries follow the current tendency to which they manage the traffic facilities and equipments based on the objective assessment for the state of every traffic safety facility in terms of Asset Management(AM). As the road safety facilities related among them are very diverse, and their functions are very important as well, the regulations and directions for installing them are enacted. However, despite the standards and directions for the installations, sometimes, the facilities are not installed in accordance with the standards, not only causing inconvenience to the users but also negatively affecting the safety for them. In the study, for the facilities in which the installation interval and height are standardized according to the designed speed and geometrical structure of the road among the various road safety facilities, the image analysis model capable of measuring them with a line scanning camera was developed. In addition, the program systematically analyzing this was also developed and applied to the field and, as the result of that, the size and installation interval of the facilities could be measured fast and accurately.

  • PDF

Development of a BFSS Road-map (BFSS 로드맵의 개발)

  • Ha, Sang-Won;Kwon, Hyuck-Moo;Hong, Sung-Hoon;Kim, Chong-Man;Lee, Min-Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.36 no.1
    • /
    • pp.62-71
    • /
    • 2008
  • Since the Six Sigma strategy was first introduced to Motorola in 1987, it has been taken as an important business strategy to strengthen the competitiveness of leading companies in the global competitive environment. To keep growing and thriving, modern companies need to develop new businesses and find new applications while keeping existing ones on track. This situation necessitates a more effective way of discovering an optimal scenario in a business. In this paper, we propose a Business for Six Sigma (BFSS) road-map to create new businesses. BFSS consists of five macro phases: define, identify, analyze, evaluate, and implement. We also provide an example of F electronics, a Korean electronics component manufacturer, which actually applied the BFSS road-map to analyze marketability, technological plausibility and economic potential/success in connection with its new product development.