Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects (다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구)

  • Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.134-145
    • /
    • 2013
  • Road construction projects are parcelled into sub-sections which are then tendered to individual contractors for construction. The type of work and equipments used are similar for each sub-section. However, such equipment are not shared on a regular basis among the contractors and only partially performed in an informal and ad hoc manner. Consequently, road construction equipment suffer from low utilization and increased leasing costs. Lean construction and Program Management approaches stress the importance of collaboration among individual participants in a way that increases the collective cost savings of the entire project. This research attempts to apply such theories with the notion that under utilization of expensive equipment can be improved by formalizing a way to enable the sharing of equipment in large, public sponsored, multi-sectioned road construction projects. A system was developed consisting of a set of criteria and processes that enables automatic allocation of equipment to multiple sites on daily basis, in a way that minimizes equipment costs and improves their individual utility. The system was then applied in allocating three different types of equipment to an actual road construction project with four sub-sections for three months. A new metric, nDPR showed that utilization improved for all equipment and also equipment related costs were decreased by 4.45%. Results also showed that increased shared opportunities of equipment correspond to an increase in utilization and cost savings.

A Strategy for Developing New Road Projects (경관도로 등 신개념의 도로사업 개발에 관한 연구)

  • Kim, Eung-Cheol
    • International Journal of Highway Engineering
    • /
    • v.9 no.2 s.32
    • /
    • pp.115-127
    • /
    • 2007
  • Developed countries, especially in road construction and management fields, introduce new road porjects such as National Scenic Byways Program(NSBP program) in USA and the Eco-road project in Japan. This study develops a conceptual model for deploying new road projects in Korea. The four step approach is suggested to create new road projects, including foundation of an act based on the existing Road Act, creation of new road project ideas, development of evaluation process and guidelines, and enhancement of an administrative scheme. To create new road projects, three different ways are devised; (1) designation of national roads having uniqueness in overall spectrum, (2) designation of roads having intrinsic values in a different aspect, (3) designation of single structures of engineering outcomes such as bridges, tunnels, new design techniques, considerable Value Engineering output, and well analyzed Life Cycle Cost Analysis practices. For the evaluation process, NSBP program of USA and/or Sustainable City Award program of Korea would be recommended. An administrative scheme and integrated funding process for the new road projects are also suggested based on evaluation of tasks of each team or division of Korea Ministry of Construction and Transportation.

  • PDF

An Analysis of Factors Affecting Environmental Load in Earthwork Type of Road Project (도로건설공사 토공작업부에 대한 환경부하 영향인자 분석)

  • Park, Jin-Young;Im, Je-Gyu;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.52-60
    • /
    • 2018
  • In the construction industry, attempts to evaluate the environmental impact of products through life cycle assessment (LCA) approach has been on the rise. However, the domestic construction industry needs to make rapid decisions due to limited budget and schedule, so it is difficult to carry out a review of the environmental load on all resources. The decision-making process requires information on the major influence factors that should be focused on to reduce environmental load. And this information should be quantified so that it can be linked to environmental impact assessment. In this study, the LCA results of road construction cases were analyzed to provide such information. As a result, diesel, ready-mixed concrete, urethane-based paint, aggregate, and asphalt concrete were found to be the main factors that generated 93.17% of the environmental load in the earthwork type of road project. The total environmental cost caused by these affecting factors when constructing 1 km of earthwork type of road project is 242 million won. The analysis also shows that a 10% reduction in the amount of ready-mixed and asphalt concretes can reduce carbon emissions by 5.02% and 2.28% while reducing environmental costs by 11 million won per kilometer. In order to reduce carbon emissions of the earthwork type of road project, it is necessary to actively develop and introduce new methods and eco-friendly materials to reduce the overall use of ready-mixed concrete and asphalt concrete.

Introduction of PCC Pavement Sections and Associated Research in KHC Test Road

  • Kim, Ji-Won;Kwon, Soon-Min;Lee, Jae-Hoon;Kim, Do-Wan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.197-203
    • /
    • 2003
  • Korea Highway Corporation(KHC) began the ambitious KHC Test Road construction project from 1997. It is 7.7km long two-lane highway next to the mainline of Jungbu Inland Expressway. The KHC Test Road construction was completed at the December 2002. It is composed of twenty-five PCC test pavement sections. Section design parameters are (1) concrete slab thickness, (2) base type, (3) base thickness (12, 15, and 18cm), and (4) pavement type. Twenty-five PCC test pavement sections contain 1241 sensors to evaluate the behavior of pavement system under traffic load and environmental change. The behavior of pavement systems will be identified by the observation of sensor measurement and pavement distress survey from test pavement sections. The Test Road research outcome will validate the Korean Pavement Design Guide which is develop by on-going funded research from the Ministry of Construction and Transportation.

  • PDF

Environmental Impact Assessment and Environmental Management of Railways (I) (철도사업 환경영향평가와 환경관리(I))

  • Lee, Hyun-Woo;Lee, Young-Joon;Park, Young Min;Lee, Jeongho;Yoon, Mikyung
    • Journal of Environmental Impact Assessment
    • /
    • v.13 no.6
    • /
    • pp.295-305
    • /
    • 2004
  • After the Rio declaration on environment and development in 1992, developed countries are undertaking "environmentally sustainable transportation (EST)" projects. To meet the needs for EST, current transportation policies in Korea are rapidly reforming and one of its concerns is modernizing and upgrading railway freight system. Planning new railroad construction projects is increasing and subsequent environmental impact assessment (EIA) demands improvements, especially in both the EIA and decision making systems. In this paper, we discuss the present status of EIA for railroad construction projects, especially, by analyzing the EIA documents for the last six years. The EIA for railroad construction projects accounts for only 4.9% of total 918 project EIAs during 1998-2003, and the portion is gradually increasing. Major environmental concerns for EIA in railroad construction projects were geomorphological and ecological changes, protection of rare organisms, air pollution, water pollution, waste management, and noise, etc. We compared characteristics of environmental impacts of railroad construction with those of vehicle road construction, based on environmental and construction-planning indicators appeared in Environmental Impact Statements. Railroad construction usually requires longer tunnels and bridges for a given length than those for vehicle road construction. In addition, the amounts of geomorphological and ecological changes (road-cutting, embankment, devegetation, etc.) in railroad construction were generally less than 50% of those in vehicle road construction. To develop environmentally friendly railway systems, monitoring studies for environmental impacts of railroads such as habitat fragmentation and road kills, dispersal of alien plants, tunnelling effects on groundwater and vegetation, and noise impacts are highly recommended.

EVALUATION OF MINIMUM REVENUE GUARANTEE(MRG) IN BOT PROJECT FINANCE WITH OPTION PRICING THEORY

  • Jae Bum Jun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.800-807
    • /
    • 2009
  • The limited public funds available for infrastructure projects have led governments to consider private entities' participation in long-term contracts for finance, construction, and operation of these projects to share risks and rewards between the public and the private. Because these projects have complicated risk evolutions, diverse contractual forms for each project member to hedge risks involved in a project are necessary. In light of this, Build-Operate-Transfer(BOT) model is considered as effective to accomplish Public Private Partnerships(PPPs) with a characteristic of an ownership-reversion. In BOT projects, the government has used such an incentive system as minimum revenue guarantee(MRG) agreement to attract the private's participation. Although this agreement turns out critical in success of BOT project, there still exist problematic issues in a financial feasibility analysis since the traditional capital budgeting theory, Net Present Value(NPV) analysis, has failed to evaluate the contingent characteristic of MRG agreement. The purpose of this research is to develop real option model based on option pricing theory so as to provide a theoretical framework in valuing MRG agreement in BOT projects. To understand the applicability of the model, the model is applied to the example of the BOT toll road project and the results are compared with that by NPV analysis. Finally, we found that the impact of the MRG agreement is significant on the project value. Hence, the real option model can help the government establish better BOT policies and the developer make appropriate bidding strategies.

  • PDF

Application of Soil Stabilization Technique for Shoulder Construction in Sri Lanka (스리랑카 길어깨 적용을 위한 안정처리 재료의 적용성 평가 연구)

  • Park, Ki Soo;Park, Hee Mun
    • International Journal of Highway Engineering
    • /
    • v.20 no.4
    • /
    • pp.21-26
    • /
    • 2018
  • PURPOSES : The objective of this study is to evaluate the application of soil stabilization method for soft shoulder construction in the iRoad Project of Sri Lanka. METHODS : Firstly, the quantitative analysis of soil strength improvement due to soil stabilization was done for soil samples collected from iRoad construction sites. Two types of soils were selected from iRoad Project sites and prepared for soil stabilization testing by the Road Development Authority. Secondly, the appropriate stabilizer was selected at given soil type based on test results. Two different stabilizers, ST-1 and ST-2, produced in Korea were used for estimating soil strength improvements. Finally, the optimum stabilizer content was determined for improving shoulder performance. The uniaxial compressive strength (UCS) test was conducted to evaluate the strength of stabilized soil samples in accordance with ASTM D 1633. The use of bottom ash as a stabilizer produced from power plant in Sri Lanka was also reviewed in this task. RESULTS : It is found from the UCS testing that a 3% use of soil stabilizer can improve the strength up to 2~5 times in stabilized soft shoulder soils with respect to unstabilized soils. It is also observed from UCS testing that the ST-1 shows high strength improvement in 3% of stabilizer content but the strength improvement rate with increase of stabilizer content is relatively low compared with ST-2. The ST-2 shows a low UCS value at 3% of content but the UCS values increase significantly with increase of stabilizer content. When using the ST-2 as stabilizing agent, the 5% is recommended as minimum content based on UCS testing results. Based on the testing results for bottom ash replacement, the stabilized sample with bottom ash shows the low strength value. CONCLUSIONS : This paper is intended to check the feasibility for use the soil stabilization technique for shoulder construction in Sri Lanka. The use of soil stabilizer enables to improve the durability and strength in soft shoulder materials. When applying the bottom ash as a soil stabilizer, various testings should be conducted to satisfy the specification criteria.

A Study on Revising Construction Cost Calculation for Road Paving Maintenance Work (도로포장 유지보수 공사비산정기준 개정에 대한 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.155-156
    • /
    • 2020
  • Unlike new construction projects, road paving maintenance work shows large productivity discrepancies depending on the conditions of the worksite. The current construction cost calculation scheme, however, only provides daily construction volume categorized by work scope and scale: There are no detailed standards that can be implemented on various types of worksites. To develop standards that enable the calculation of appropriate construction costs by taking into account worksite conditions, the current study conducted on-site surveys and interviews. The on-site research and analysis revealed that location, construction width, the day's worksite lot, work scope, and construction objectives were found to cause differences in construction volume. In addition to the existing work scope and work scape variables, the current study added weight constants reflecting the daily work volume based on movement conditions at site and the size of the worksite lot. In this process, the current study found that even one type of construction project can have fifteen different levels of daily construction volume. Such detailed classification was deemed to enable the proper calculation of construction costs based on worksite conditions.