This study shows the new findings against a electrical bonding risk between the tanker and the jetty they've generally done. According to this new theory, a new preventive plan will be proposed. Also, a new preventive plan will be shown as the result of practical implementation in which it could guide the same kind of working people.
International Journal of Computer Science & Network Security
/
v.21
no.12spc
/
pp.586-596
/
2021
Software organisations follow different methodologies for the development of software. The software development methodologies are mainly divided into two categories, including plan-driven and agile development. To attain project success, it is very significant to consider risk management during whole project. Agile development is considered risk-driven, but many risks are unreported at the industrial level. The risks can be divided into three categories, including (i) development risks, (ii) organisations risks, and (iii) people-oriented risks. This paper deals with Development risks specifically. Several risks related to development are faced by people working in the industry while dealing with agile development. Their management among the industry is a big issue, so this paper emphasises ARMF based on development-related risks by following agile development. This research work will help software organisations to prevent different project-related risks during agile development. The risks are elicited at two-level, (i) literature-based and (ii) IT industry based. A systematic literature review was performed for eliciting the agile risks from the literature. Detailed case studies and survey research methods were applied for eliciting risks from IT industry. Finally, we merged the agile development risks from literature with standard industrial risks. Hence, we established an agile risk mitigation framework ARMF based on agile development and present a groundwork established in light of empirical examination for extending it in future research.
In order to reduce the amount of damage from natural disasters, we needs prevention meteorological database classified into the cause of disaster, damage elements etc. For this, we have analyzed four data, such as Statistical yearbook of calamities issued by the National Emergency Management Agency and Annual Climatological Report issued by the Korea Meteorological Administration and Recently 10 years for natural disaster damage and Statistics Yearbook from the Ministry of Government Administration and Human affairs. Through the analysis of disaster data, we have selected input variables, such as causes and elements, occurrence frequencies, vulnerable areas of natural disaster, etc. In order to reduce damage from natural disaster, the prevention activities and forecasting based on meteorological parameters and damage datas are required. In addition, it is necessary to process meteorological information for disaster prevention activities. Through these procedure, we have established the foundation of database about natural disasters. This database will be used to assess the natural disasters and build risk model and natural disasters mitigation plan.
Journal of the Korean Society of Hazard Mitigation
/
v.9
no.2
/
pp.31-37
/
2009
Most damages of civil infrastructures under natural disasters are frequently occurred at surrounding areas of the river or the road. Every year, Recovery for these disaster damages are performed by the government. Recently, the government decide to change current recovery plan system because current recovery plan which doesn't consider future disaster impacts at a site has been proved to be ineffective. Accordingly, new permanency recovery plan system is needed and its corresponding ideas are presented in this research considering more detailed disaster damage classifications and cause assessments. The proposed permanency recovery plan would also provide more systematic and diverse recovery response strategies including both two concepts, for example Preparedness considered by risk assessment and management, and Mitigation investigated by hazard impact analyses.
Purpose: This study is intended to confirm the business disruptive risk in the Serious Accidents, and propose a plan to comply with the Serious Accidents Punishment Act through the Disaster Mitigation Activity Management System. Method: Through literature review and case studies, the requirements and characteristics of each of the Serious Accidents Punishment Act, the Disaster Mitigation Activity Management System, and ISO 45001 were compared and analyzed, and implications were derived. Result: The business disruption and financial adverse effects caused by industrial accidents were identified. Based on this and by using the Disaster Mitigation Activity Management System, measures to link the documentation requirements of the the Serious Accidents Punishment Act to the Disaster Mitigation Activity Management System, and to manage the implementation records of the Serious Accidents Punishment Act's duty were derived. Conclusion: When establishing and operating the Disaster Mitigation Activity Management System, it can not only comply with the Serious Accidents Punishment Act but also contribute to maintaining business continuity and ESG management through the prevention of various disasters and the minimization of secondary damage, etc.
An existing risk diagnosing methodology (RDM) diagnoses corporate risk for product-innovation projects. However, it cannot evaluate and compare the risk levels of multiple alternatives in the product development stage. This paper proposes a modified risk diagnosis method to fill the gap of risk evaluation in selections of innovative product alternatives and the application of the method will be also illustrated by a case problem on alternative selections in electrical dimmer designs. With RDM as the foundation, a modified RDM (MRDM) is proposed to deal with the problem of selecting innovative project alternatives during the early stages of product development. The Bayesian network; a probabilistic graphical model, is adopted to support the risk pre-assessment stage in the MRDM. The MRDM is proposed by incorporating the risk pre-assessment stage into the foundation. By evaluating the engineering design risks in two electrical dimmer switches, an application of the MRDM in product innovation development is successfully exemplified. This paper strengthens the existing methodology for RDM in innovative product development projects to accommodate innovative alternatives. It is advantageous for companies to identify and measure the risks associated in product development so as to plan for appropriate risk mitigation strategies.
In recent years, the natural damage associated with flood disaster has been dramatically increased. However, there is no rational method which reflects urban characteristics to estimate the regional safety assessment for flood disaster. The purpose of this study is to develop the regional safety assesment model for urban flood. Flood risk and reduction assesment were estimated by using the linear sum of the Z score of the assessment factors and the weight value of each factor from the expert survey data. And then the regional safety assessment was estimated by subtracting reduction factor value from risk factor value. GIS tool was used to estimate the factor assesment and integrated regional safety. This study can be used to determine the priority of flood protection project, execute the flood insurance and establish the urban plans and the flood mitigate plan.
International conference on construction engineering and project management
/
2020.12a
/
pp.103-113
/
2020
The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.
An, Jinsung;Yang, Kyung;Kang, Woojae;Lee, Jung Sun;Nam, Kyoungphile
Journal of Soil and Groundwater Environment
/
v.22
no.6
/
pp.1-11
/
2017
This study was conducted to investigate the performance of four commercial chemical agents in stabilizing arsenic (As) in soil at the forest area near the former Janghang smelter site. After amending the stabilizing agents (A, B, C, and D) into As-contaminated soil samples, synthetic precipitation leaching procedure (SPLP) and solubility bioavailability research consortium (SBRC)-extractable As concentrations significantly decreased except for agent D, which is mainly composed of fly ash and calcium carbonate. Increase of SPLP and SBRC-extractable As concentrations in four soil samples (S1, S2, S3, and J2) was attributed to desorption of As adsorbed on iron oxides due to high pH generated by agent D. It is therefore necessary to consider application conditions according to soil characteristics such as pH and buffering capacity. Results of sequential extraction showed that readily extractable fractions of As in soil (i.e., sum of $SO_4-$ and $PO_4-extractable$ As in soil) were converted into non-readily extractable fractions by amending agents A, B, and C. Such changes in the As distribution in soil resulted in the decrease of SPLP and SBRC-extractable As concentration. A series of follow-up monitoring and management plan has been suggested to assess the longevity of the stabilization treatments in the site.
Journal of the Korean Association of Geographic Information Studies
/
v.14
no.3
/
pp.68-77
/
2011
Flood disasters on the metropolis where population and facilities were densely concentrated cause an enormous damage, therefore it is important to find risk and vulnerable area for floods, and then mid-long term disaster reduction plan should be established by the results. However, there is no rational method which reflects urban characteristics to estimate the regional safety for flood. so it is necessary to develop the standardized method of regional safety assesment due to urban flood. The proposed regional safety assesment model in this study was combined risk and mitigation score which consisted of three and two element, and 12 assesment factors which effect flood disasters were selected. And then the integrated regional safety was estimated by subtracting mitigation score from risk score. GIS tool was used to estimate the factor assesment and integrated regional safety. Developed regional safety assesment model was applied in Seoul to evaluate the suitability.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.