References
- Causevic, A., Sundmark, D., & Punnekkat, S. (2011, March). Factors limiting industrial adoption of test driven development: A systematic review. In Software Testing, Verification and Validation (ICST), 2011 IEEE Fourth International Conference on (pp. 337-346). IEEE.
- Mingshu Li, Meng Huang, Fengdi Shu, and Juan Li. A Risk-Driven Method for eXtreme Programming Release Planning.ICSE28thInternational Conference on Software EngineeringShanghai,China.2006. ACM.
- Coyle Sharon, Conboy Kieran. Centre for Innovation and Structural Change, J.E. Cairnes. A CASE STUDY OF RISK MANAGEMENT IN AGILE SYSTEMS DEVELOPMENT. 17th European Conference on Information Systems (Newell S, Whitley EA, Pouloudi N, Wareham J, Mathiassen L eds.), 2567-2578, Verona, Italy.
- Ville Ylimannela Tampere. A MODEL FOR RISK MANAGEMENT IN AGILE SOFTWARE DEVELOPMENT
- Mauricio Concha, Marcello Visconti, and HernanAstudillo. Agile Commitments: Enhancing Business Risk Management in Agile Development Projects. 8th International Conference,XP 2007.
- Mikael Lindvall, Vic Basili, Barry Boehm, Patricia Costa , Kathleen Dangle, Forrest Shull, Roseanne Tesoriero, Laurie Williams, and Marvin Zelkowitz. Empirical Findings in Agile Methods. Second XP Universe and first Agile Universe Conference Chicago, 2002.
- Steffen Bartsch TZI. Practitioners' Perspectives on Security in Agile Development.
- Ahmed Sidky.James Arthur.Shawn Bohner (May 2007). A disciplined approach to adopting agile practices: the agile adoption framework.Innovations in Systems and Software Engineering 2007.
- A. Qumer, B. Henderson-Sellers. A framework to support the evaluation, adoption and improvement of agile methods in practice. (Nov 2008). Journal of Systems and Software Volume 81, Issu 11. Page 1899-1919. https://doi.org/10.1016/j.jss.2007.12.806
- Frank K.Y. Chan, James Y.L. Thong (2009) Acceptance of agile methodologies: A critical review and conceptual framework.
- Balasubramaniam Ramesh,* Lan Cao† & Richard Baskerville. Agile requirements engineering practices and challenges: an empirical study.
- JaanaNyfjord and Mira Kajko-Mattsson. Commonalities in Risk Management and Agile Process Models. International Conference of Software Engineering Advances, 2007. ICSEA 2007. IEEE.
- Barry Boehm University of Southern California. Get Ready for Agile Methods, with Care. Computer ( Volume: 35, Issue: 1, Jan 2002 ) IEEE.
- Barry Boehm, Richard Turner. Management Challenges to Implementing Agile Processes in Traditional Development Organizations. IEEE Software ( Volume: 22, Issue: 5, Sept.- Oct. 2005 )
- Emam Hossain, Muhammad Ali Babar, Hye-young Paik , June Verner. Risk Identification and Mitigation Processes for Using Scrum in Global Software Development: A Conceptual Framework. 2009 16th Asia-Pacific Software Engineering Conference.
- Tsun Chow, Dac-Buu Cao. A survey study of critical success factors in agile software projects. The Journal of Systems and Software 81 (2008) 961-971. https://doi.org/10.1016/j.jss.2007.08.020
- Christof Ebert, Bvs Krishna Murthy,Namo Narayan Jha. Managing Risks in Global Software Engineering: Principles and Practices. 2008 IEEE International Conference on Global Software Engineering.
- Susan Parente. The Art of Agile Risk Management. PM World Journal Vol. III, Issue VII - July 2014
- Tore Dyba˚ *, TorgeirDingsoyr. Empirical studies of agile software development: A systematic review. Information and Software Technology 50 (2008) 833-859. https://doi.org/10.1016/j.infsof.2008.01.006
- JaanaNyfjord. TOWARDS INTEGRATING AGILE DEVELOPMENT AND RISK MANAGEMENT (2008).
- Software Engineering Standards Committee of the IEEE Computer Society IEEE-SA Standards Board IEEE Standard for Software Life Cycle Processes-Risk Management (Approved 17 March 2001).
- Tore Dyba˚ *, Torgeir Dingsoyr Empirical studies of agile software development: A systematic review (24 January 2008).