Analysis of Effect of Risk Factors on the Success of Risk Management (리스크요소가 리스크관리 성공에 미치는 영향 분석 연구)

  • Chung, Yeon-Kyo;Chung, Byeong-Hwa
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.443-449
    • /
    • 2014
  • Although risk reduction of construction projects have been continued, the risk of fatal accident has been increased. The purpose of this paper is to reduce the cause of the essential risk factors. Questionnaire survey of construction companies in domestic was conducted and the Multiple Regression Analysis of statistics program was used to grasp effective factors among the risk factors of construction companies in domestic. Development of the essential risk factors and its application to projects could lead to improvements such as compression of network, reduction of cost, improvement of quality and reduction of safety accident.

A Study on the Development of Risk Check List and Identification of Risk Factors for Survey in Road Construction (측량 분야의 리스크 식별을 위한 리스크 체크리스트 개발 -도로 공사를 중심으로-)

  • Kwak, Jun-Hwan;Park, Hyung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.901-904
    • /
    • 2008
  • The purpose of this study is to identify the risk factors, analyze the risk factors and make a risk check list of survey in road construction. Generally. the risk management is consisted of 3 steps: risk identification, Risk analysis, Risk hedge. This study is focused on the identification of risk and analysis of risk. To identify the risk factors of survey, we used the specifications of road construction, law of survey, and check list of road construction. This study provides the risk check list of survey for road construction. This research was undertaken to analyze risk factors being determine by the FGI(Focus Group Interview) method with survey specialists.

  • PDF

Evaluation on Risk at the Port of Mokpo and its Approaches based on Relative Importance of Risk Factors for Marine Traffic Environment (해상교통환경 위험요소의 상대적 중요도를 고려한 목포항 및 진입수로의 위험도 평가)

  • Lee, Hong-Hoon;Kim, Chol-Seong
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.19 no.4
    • /
    • pp.375-381
    • /
    • 2013
  • To assess the risk of marine traffic environments, with high confidential level, the risk factors comprising it should be identified and the risk acceptance criteria should be also provided. Furthermore, the relative importance of each risk factor(the weight of each risk factor on total risk) should be analyzed because the risk is expressed as the sum of risk factors comprising it. The twenty kinds of risk factors and its assessment criteria were suggested for the domestic marine traffic environments by an examination of the existing risk assessment models on the previous studies. The relative importance of each risk factor was also analyzed through the questionnaire using analytic hierarchy process by the marine traffic experts on the same studies. Based on these previous studies, the risk was evaluated at the port of Mokpo and its approaches on this study. The port of Mokpo and its approaches were divided into four sectors for the comparative evaluation, the result of the comparative evaluation on four sectors showed that the risk of the Jeongdeung-hae passage is the highest due to higher risk level of some risk factors(water movements, complexities, tug boats, pilotage, VTS) than the other sectors. The result of this evaluation is in accord with the analysis results of the other studies using various qualitative or quantitative risk analysis methods at the same sea areas.

Feasibility Analysis of Introducing CM at Risk Delivery Method to the Korean Public Construction Industry by Analyzing Attributes of the Projects (대상공사의 특성요인 적합도 분석에 의한 공공부문 'CM at Risk 방식' 도입의 타당성 분석)

  • Koh, Min-Hyeok;Kim, Yea-Sang;Kwon, Soon-Wook;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.3-14
    • /
    • 2010
  • A high degree of management skills and functions is essential to the success of construction projects. While the various construction management delivery methods have been realized as the solutions, Korean government is planning to introduce 'CM at Risk Method' to the public construction projects. However, even if its effect has been verified successful in the international market, it must be considered before legally adapting the method that it would be suitable to our public sector, In this respect, the purpose of this study is to evaluate and analyze feasibility of 'CM at Risk Method'. In order to do that, 15 attributes of construction projects were found, which were suitable to 'CM at Risk Method' in general, 'CM at Risk-GMP Method', and 'CM at Risk-Cost Reimbursable Method' and suitability of each attribute to each of 9 categories of public construction facilities was evaluated by questionnaire survey to CM specialists. Results showed that 'CM at Risk Method' might not bring improper effect to the industry but due to the characteristic of public sector, the effect would be very limited.

Relationships Between Risk Factors and R&D Output: Approach to New Product Development process (위험요인과 R&D성과 간의 관계: 신제품개발단계별 접근)

  • Han, Sang Rog;Cho, Kuen Tae
    • Journal of Technology Innovation
    • /
    • v.21 no.1
    • /
    • pp.165-198
    • /
    • 2013
  • The purpose of the study is to identify risk factors and analyze risk impacts to increase R&D outcome by taking into consideration the activities undertaken in each phase of New Product Development(NPD) process. The paper builds on survey research that has been developed new IT products within the past 5 years at SAMSUNG and LG subsidiaries in the Republic of Korea. This study identified risk factors in accordance with NPD process and evaluated the identified risk factors with survey questionnaires. To analyze the risk impacts were used to perform a logistic regression analysis based on R&D output. The impact of risk factors were higher for the low-output group. High-output group took a risk into consideration unique undertakings in project management and managed risk factors effectively in order to increase R&D output. Consequently, with the aim of improving output of R&D, a risk management is necessary to identify the risk factors for each phase of NPD and focus on managing risk factors with great effect.

  • PDF

Development of a Risk Management Procedure Model for the Construction Project Using Construction Risk Management System (CRMS를 활용한 건설공사의 리스크관리 절차모형 개발)

  • Kim, Chang Hak;Kang, Leen Seok;Park, Hong Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.423-432
    • /
    • 2010
  • This study suggested CRMS (construction risk management system) which is a new risk analysis model after analyzing existing risk management process for to guarantee a successful performance at the construction planning and work phase. CRMS is risk management procedures in order that the contractor identify, analyze and administrate the risk during performing construction project. This model may give much help to quantify and be ready the right managing methods about identified risk by the contractor. Especially, the most important and difficult things of all risk management may be to identify risk in the project. This study make more focusing on the developing a procedure that can identify risk more easily in the construction project. The risk is divided into global risk and local risk of a project. Also, this study suggests methods which are using the RBS (risk breakdown structure) related with WBS. This result will be useful as basic materials for developing computerizing system for risk management.

A Study of the Risk Analysis Technique Optimization in the Pre-Project Evaluation Phase of the Development Projects (개발사업 사전평가단계에 적용하는 위험분석기법 최적화 연구)

  • Kim, Han;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.517-520
    • /
    • 2008
  • The city refreshing development projects in the domestic recently have been performed under leading of public institution laying stress on new city and existing urban district. These development projects are still staying in safety control level despite risk factor management at preliminary estimation stage has been more important factor to success and add value creation. Understanding inaccurately about various risk analysis techniques that can analyze risk factors and the insufficient application of step that can analysis technique s could make projects more difficult. Therefore, this research suggests the more effective methods for risk analysis that can control the risks in the pre-project evaluation stage.

  • PDF

Development of CC Based Security Risk Analysis Tool (CC(Common Criteria) 기반 보안위험분석 도구 개발)

  • Kim In-Jung;Chung Yoon-Jung;Koh Jae-Young;Won Dong-Ho
    • Journal of Internet Computing and Services
    • /
    • v.7 no.1
    • /
    • pp.31-38
    • /
    • 2006
  • The importance of the Security Risk Analysis has emerged as security breaches and information leaks has occurred in the companies and organization: threats toward information system and its vulnerabilities has grown up as the dependence on the information-communication systems goes higher as a result of technological advances in IT industry, A Risk Analysis Tool helps to mitigate overall risk of an organization by analysing and evaluating critical information systems and providing security measures against threats to systems and its vulnerabilities as a means to identify the inherent dangers and prevent security intrusion incident, This paper defines risk analysis process by introducing Common Criteria Scheme and suggest a risk analysis tool that can be easily implemented by an information security manager.

  • PDF

FREES : Fuzzy Risk Evaluation Expert System (Fuzzy 이론을 활용한 건설프로젝트 리스크 분석 및 평가 시스템)

  • Cho Ick-Rae;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.53-62
    • /
    • 2000
  • This study proposes FREES(Fuzzy Risk Evaluation Expert System) for analyzing and evaluating risks occurring during the construction process. The feasibility of this system model was tested by virtual scenario. For the development of the model, at first, risk breakdown structure was established based on risks identified in the existing researches, that is quantitative and qualitative. FREES can reflect human cognition process in the risk analysis and evaluation by adopting artificial intelligence fuzzy theory, differentiating the existing quantitative analysis model. The FREES can be applied to all the project phases from planning to operation & maintenance stage.

  • PDF

IP-CCTV Risk Decision Model Using AHP (Cloud Computing Based) (AHP를 활용한 IP-CCTV 위험 결정 모델 (클라우드 컴퓨팅 기반으로))

  • Jung, Sung-hoo;Lee, Kyung-ho
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.28 no.1
    • /
    • pp.229-239
    • /
    • 2018
  • This paper analyzes the problems of existing CCTV and discusses cyber security problems of IP-CCTV in cloud computing environment. In order to reduce the risk of simply removing the risk associated with the provision of cloud services, the risk analysis and counter-measures need to be carried out effectively. Therefore, the STRIDE model as the Threat Risk Modeling is used to analyze the risk factors, and Analytic Hierarchy Process(AHP) is used to measure risk priorities based on the analyzed threats.