• 제목/요약/키워드: Reserve margin

검색결과 41건 처리시간 0.044초

전력예비율과 전기요금, 신재생, 경제성장, 동·하계 동시피크 간 인과관계 연구 : OECD 패널 분석 (A Study on the Causality between Electric Reserve Margin, Electricity Tariff, Renewable Energy, Economic Growth, and Concurrent Peak in Winter and Summer: OECD Panel Analysis)

  • 이중호;박경민;박중구
    • 전기학회논문지
    • /
    • 제67권11호
    • /
    • pp.1415-1422
    • /
    • 2018
  • In Korea, prior to 2011, the electric reserve margin followed the probabilistic reliability view and the planning reserve margin had been operated at about 15% based on the assumption that power outage was permitted within 0.5 days a year. However, after experiencing the shortage of the electric generation capacity in Sept. 15, 2011, the planning reserve margin was selected as 22% to improve the reliability of the electric supply. In this paper, using panel data of 28 OECD countries over the period 2000-2014 we attempted to empirically examine the linkage between reserve margin, electricity tariffs, renewable energy share, GDP per capita, and summer / winter peak-to-peak ratios. As a result, all four independent variables have been significant for the electric reserve margin, and in particular, we found that countries with similar peaks in winter and summer have operated 4.3% higher reserve margin than countries experiencing only summer peak.

전력수급기본계획의 적정 설비예비율 산정 개선방안 (A Study on the Assessment of Reasonable Reserve Margin in Basic Plan of Electricity Supply and Demand)

  • 김창수;이창호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.418-419
    • /
    • 2006
  • After electricity power industry restructuring, "Long term power development plan", setting up by government, is replaced by "Basic plan of electricity supply and demand". In this basic plan, one of the most important factors is assessment of appropriate capacity margin. The benefit of GENCO is decided by the market price, and the price is largely affected by the level of reserve margin. As a consequence, appropriate reserve margin is determined by market power. However, Cost Based Pool(CBP) is a limited competitive market, and government policy for supply and demand is very important factor or reserve margin determination. This paper points out issues about existing reserve margin assessment method which is used in basic plan and suggests improved assessment method. In the case study, capacity margin is calculated by proposed assessment method and result shows the advantages of suggested method.

  • PDF

수요와 공급의 불확실성을 고려한 시간대별 순동예비력 산정 방안 (Dynamic Reserve Estimating Method with Consideration of Uncertainties in Supply and Demand)

  • 권경빈;박현곤;류재근;김유창;박종근
    • 전기학회논문지
    • /
    • 제62권11호
    • /
    • pp.1495-1504
    • /
    • 2013
  • Renewable energy integration and increased system complexities make system operator maintain supply and demand balance harder than before. To keep the grid frequency in a stable range, an appropriate spinning reserve margin should be procured with consideration of ever-changing system situation, such as demand, wind power output and generator failure. This paper propose a novel concept of dynamic reserve, which arrange different spinning reserve margin depending on time. To investigate the effectiveness of the proposed dynamic reserve, we developed a new short-term reliability criterion that estimates the probability of a spinning reserve shortage events, thus indicating grid frequency stability. Uncertainties of demand forecast error, wind generation forecast error and generator failure have been modeled in probabilistic terms, and the proposed spinning reserve has been applied to generation scheduling. This approach has been tested on the modified IEEE 118-bus system with a wind farm. The results show that the required spinning reserve margin changes depending on the system situation of demand, wind generation and generator failure. Moreover the proposed approach could be utilized even in case of system configuration change, such as wind generation extension.

지역별 예비력 제약과 융통전력을 고려한 발전기 예방정비 계획 해법 (Generating Unit Maintenance Scheduling Considering Regional Reserve Constraints and Transfer Capability Using Hybrid PSO Algorithm)

  • 박영수;박준호;김진호
    • 전기학회논문지
    • /
    • 제56권11호
    • /
    • pp.1892-1902
    • /
    • 2007
  • This paper presents a new generating unit maintenance scheduling algorithm considering regional reserve margin and transfer capability. Existing researches focused on reliability of the overall power systems have some problems that adequate reliability criteria cannot be guaranteed in supply shortage regions. Therefore specific constraints which can treat regional reserve ratio have to be added to conventional approaches. The objective function considered in this paper is the variance (second-order momentum) of operating reserve margin to levelize reliability during a planning horizon. This paper focuses on significances of considering regional reliability criteria and an advanced hybrid optimization method based on PSO algorithm. The proposed method has been applied to IEEE reliability test system(1996) with 32-generators and a real-world large scale power system with 291 generators. The results are compared with those of the classical central maintenance scheduling approaches and conventional PSO algorithm to verify the effectiveness of the algorithm proposed in this paper.

경쟁시장에서 설비예비율에 따른 Pool가격과 발전사업자 수익분석 (Analysis of Pool Price and Generators Revenue from Capacity Margin in Competitive Market)

  • 김창수;백영식;이창호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권6호
    • /
    • pp.269-275
    • /
    • 2002
  • Recently, Korea's electric industry has experienced substantial changes in its structure and function including the introduction of competition in the generation sector. Korea is in the early stages of market competition where the market price is determined by generation costs. In the future, the market Price will be determined by generators'bids. Therefore, the generators'profit is determined by market pool price, the prospects of pool price are very important for new capacity investment decision made by generators and IPPS. This study analyzes hourly marginal costs and LOLP considering basic generation mix and characteristics develops the relationship of pool price and Profit by generation-type using the change in reserve margin, and proposes basic direction for profits variation and supply-demand analysis in the electricity market in future.

전압안정도 여유 향상을 위한 무효예비력 기반 상정사고 제약 최적조류계산 (Reactive Reserve Based Contingency Constrained Optimal Power Flow for Enhancement of Voltage Stability Margins)

  • 송화창;이병준;권세혁
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.19-23
    • /
    • 2003
  • This paper presents a new concept of reactive reserve based contingency constrained optimal power flow (RCCOPF) for voltage stability enhancement. This concept is based on the fact that increase in reactive reserves is effective for enhancement of voltage stability margins of post-contingent states, in this paper, the proposed algorithm is applied to voltage stability margin of interface flow. Interface flow limit, in the open access environment, can be a main drawback. RCCOPF for enhancement of interface flow margin is composed of two modules, modified continuation power flow (MCPF) and optimal power flow (OPF). These modules art recursively perform ed until satisfying the required margin of interface flow in the given voltage stability criteria.

  • PDF

기회비용에 의한 운전예비력의 경제적 가치 평가 (Economic value evaluation of operating reserve based on opportunity cost)

  • 윤용범;이재걸;안남성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.751-753
    • /
    • 2005
  • In this raper, Economic value of reserve margin i.i presented by opportunity cost for Korean power system, and the level of compensation for spinning reserve that is necessary to operate power system stably is proposed. The generator that is giving up for opportunity to participate in energy market must take opportunity cost. it is relative to not only whole demand level but also marginal cost of each resource. In this paper, assume that all resource in Korea is equivalent to six generator for simulation. and we evaluate value of reserve in the time of high demand and low demand. Also we propose the way to improve a evaluation method by examine relationship between capacity payment and value of reserve.

  • PDF

Supply Margin Assessment를 이용한 도매전력시장의 시장지배력 예방에 관한 연구 (A Study on Market Power Mitigation Using Supply Margin Assessment)

  • 정해성;박종근;오태규
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권3호
    • /
    • pp.139-143
    • /
    • 2005
  • Several methods have been proposed to mitigate the market power in foreign electricity markets. In this paper, Hirfindahl-Hirschman Index(HHI) and supply margin assessment(SMA) are compared based upon the Korean future markets. The results show that SMA is better than HHI to estimate market power because it can reflect congestion and capacity reserve effectively.

PSO알고리즘을 이용한 전력계통의 발전기 예방정비계획 수립 (Maintenance Scheduling Using PSO Algorithm for Power Plants)

  • 박영수;정희명;박종국;김진호;박준호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.237-239
    • /
    • 2007
  • This paper focuses on maintenance scheduling using PSO algorithm for power plants from an economic (operating cost) and reliable(variance of operating reserve margin) point of view. We also apply regional reserve margin and transfer capability to maintenance scheduling problem. The proposed method has been applied to IEEE-RTS(1996) with 32-generators and a real -world large scale power system with 291 generators.

  • PDF

전력계통의 지역간 예비율 산정에 관한 연구 (A Study on the Evaluation of Area Reserve Margin in Composite Power Systems)

  • 남궁재용;이병준;송길영;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 D
    • /
    • pp.1112-1114
    • /
    • 1997
  • When reliability is estimated to be insufficient, a planner must take action to improve them. So, the measures for improving reliability are mainly considered in the planning process. In order to provide quantitative information concerning reliability evaluation, this paper-describes an algorithm to find reserve margin in power system planning. The IEEE Reliability Test System(RTS) is used to demonstrate the effectiveness of the proposed algorithm.

  • PDF