• Title/Summary/Keyword: Requirement of Acquisition

Search Result 109, Processing Time 0.022 seconds

A study on the requirement of drone acquisition for the efficient dronebot combat system (효율적 드론봇 전투체계를 위한 드론 편제소요 도출에 관한 연구)

  • Cha, Dowan
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.3
    • /
    • pp.31-37
    • /
    • 2019
  • In this paper, we propose an approach to get the requirement of drone acquisition for the efficient dronebot combat system using brute force algorithm. We define parameters, such as width, depth, and important surveillance area for the surveillance mission in the Army battalion and company units based on real military operation environment and brute force algorithm with 4 steps including first, next, valid, output is applied to get the requirement of drone acquisition and each drone's path planning using computer simulation. As a result, we could get the requirement of drone acquisition and each drone's path planning, the Army could utilize our proposed approach in the Army dronebot combat system. In the future research, we will study on the reliability of our proposed approach to get the requirement of drone acquisition for the efficient dronebot combat system.

SE Case Study in Eagle Acquisition Program (독수리구매사업 시스템엔지니어링 적용사례)

  • Lee, Hi-Jang;Lee, Dong-Seok;Ham, Hyuck-Sang;Rho, Kyun-Hyup;Kwon, Young-Hoon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.3 no.2
    • /
    • pp.9-16
    • /
    • 2007
  • To Manage the Defense Acquisition Process more efficiently, DAPA has looked over the applying SE process to the Eagle Acquisition Program. Based on comparing 'Requirement' with 'items suggested in the proposal' in RFP and analyzing the result by using Cradle, those items have been discovered with IPT, actualized and corrected. In addition, the computerized data base system makes easier to trace all changed and more efficiency to manage programs. Therefore, this study using SE in other acquisition program.

  • PDF

Framework for Determining Requirements in the Weapons systems Acquisition Process (무기 획득과정에서의 요구사항 결정 프레임워크)

  • Yun, Ha-Neul;Ok, Young-Ho;Wang, Ji-Nam
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.77-82
    • /
    • 2012
  • In Weapons acquisition process, if the requirements are not clear, it leads to confusion and conflict in business. In the development of next-generation weapons, to define and derive requirements has to start from decision of operational concept. It is difficult task and has many uncertainties. This paper has goal about development of knowledge acquisition process that derive military operational scenario-based requirements acquisition process and framework that classify and save the derived requirements for next project. That framework can generate new class and category, also suggest that verification of requirements. It help to derive and manage the requirements, and make it easy to grasp the requirements. Accordingly, it can help make military requirement plan and weapon acquisition process.

A Study on the Requirement Verification in the Weapon System R&D (무기체계 연구개발 요구사항 검증에 관한 연구)

  • Kwon, Yong Soo;Kim, Kyoung Jin;Lee, Kyoung Haing
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.3 no.1
    • /
    • pp.33-40
    • /
    • 2007
  • The requirement verification is the integral part of the weapon system R&D to reduce cost and schedule. And, a systems engineering is an interdisciplinary engineering management process that evolves and verifies an integrated, life-cycle balanced set of system solutions that satisfy customer needs. Therefore, this study analyzes the national defense need and acquisition management process, investigates the systems engineering verification activity. Through the requirement verification example in terms of technical evaluation this study presented the requirement verification approach in the weapon system R&D.

  • PDF

Framework for an Advanced Naval Ships Acquisition based on PLM (PLM 기반 함정획득을 위한 프레임워크 개발 방법론)

  • Shin, Jong-Gye;Oh, Dae-Kyun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.2
    • /
    • pp.189-202
    • /
    • 2009
  • As naval ships become more complex with the reduced cost and time for their development, modeling and simulation are increasingly used. The US navy has being applied the concept of a simulation-based acquisition(SBA) to their acquisition process. However, there have been few studies on a simulation-based acquisition for naval ships (SBA-NS) in the Korean naval shipbuilding. In this paper, we discuss a framework to establish collaborative environment(CE) for an advanced naval ships acquisition based on PLM. For this, we propose architectures and a naval ship information model for design the framework of the SBA-NS. To design the framework, we develop the methodology that is composed of three major processes that are the requirement analysis process, the SBA-NS architectures design process and the design process of a reference model of a naval ship product information. Applying the methodology, the framework suitable for the Korean Navy context is developed.

RESEARCH OF COMMUNICATION SCHEDULING BETWEEN COMPUTER I/O AND S/W FOR ACQUISITION OF SATELLITE SENSORED DATA

  • Koo, Cheol-Hea;Park, Su-Hyun;Kang, Soo-Yeon;Yang, Koon-Ho;Choi, Sung-Bong
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.196-199
    • /
    • 2006
  • Various communication mechanisms have been developed to acquire a meaningful data from sensors. The key requirement during the sensor data acquisition is determinism and reduction of time dependency. It is a fundermental level of satellite data management for controlling satellite operation software data acquisition from sensors or subsystem. Satellite operation software has various software modules to be operated in addition to data acquisition. Therefore, unnecessary time delay shall be minimized to perform the data acquisition. As the result, interrupt method might be prefered than polling method because the former can decrease the restriction of design during implementation of data acquisition logic. The possible problems while using interrupt method like as interrupt latency caused by delaying of interrupt processing time are analyzed. In this paper, communication mechanism which can be used to interface with satellite computer and subsidary subsystem by using interrupt is presented. As well, time dependency between software scheduling and data acquisition is analyzed.

  • PDF

Requirement management program for the Development of the Avionics Operational Flight Program (항공전자장비 비행운용프로그램 개발을 위한 요구도 관리 시스템)

  • Park, Kyoung-Choon;Seo, Jung-Bae;Bae, Jong-Min;Kang, Hyun-Syug
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.15 no.9
    • /
    • pp.2050-2058
    • /
    • 2011
  • The objective of this thesis is to research the software requirement management system for the development of operational flight program (OFP) which is embedded in aircraft avionics. It offers the function to record the requirement revision log. In fact, the COTS (commercial off-the-shelf) program which has similar function already exists in the market. But this kind of software programs are too complicated and relatively expensive in acquisition. Furthermore, they require too expensive maintenance cost, medium sized business company, this thesis intended to provide the software requirement management system that can be simply installed and easily used.

Transition of ACTD by Measuring the Technology Readiness Level (기술성숙도 측정을 통한 ACTD 과제 전이 결정에 관한 연구)

  • Bae, Yoon-Ho;Choin, Seok-Cheol;Moon, Hee-Seung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.12 no.1
    • /
    • pp.60-69
    • /
    • 2009
  • Recently, request far application of advanced commercial technology to the defense acquisition process, to reduce the budget and shorten development time, has been increased. To accomplish these goals, the Advanced Concept Technology Demonstration(ACTD) is used for the defense acquisition process in Korea. And User Utility Assessment is tested to make a decision for transition to acquisition process. But this process does not include measurement of technology maturity and impacts of interface and interaction among the technologies. In this research, we propose the needs of measurement of TRL and IRL and application of SRL to reduce the risk during development phase, to understand the relations of technologies, and to fulfill the requirement far transition of the ACTD project to system development and demonstration process.

A Plan for Building up the Rational Defense Acquisition System (합리적 국방획득체계 구축을 위한 방안)

  • Kim, Jong-Ha
    • Journal of the military operations research society of Korea
    • /
    • v.35 no.2
    • /
    • pp.15-31
    • /
    • 2009
  • This paper examines several inefficient problems generated from a management process of defense acquisition system, and suggests several alternatives to remedy the current acquisition-related problems. This might help MND to reform the current DAPA's acquisition system. The offered elements are to, first, redefine function of mid-term plan & budget allocation between MND and DAPA, second, devise economic acquisition management and force development to build integrated management system of requirement-acquisition-operation & maintenance, third, build Workforce Management Act(WMA) and Professional Education System(PES) for strengthening expertise and institutionalizing manpower rotation of requirements & acquisition-related fields, fourth, implement weapon systems' Total Life Cycle Systems Management(TLCSM) and improve developmental & operational test and evaluation. These are essential elements in minimizing confusion & conflict emanating from surrounding acquisition program among MND-DAPA-Each Services.

Obstacle Awareness and Collision Avoidance Radar Sensor System for Smart UAV

  • Kwag, Young K.;Hwang, Kwang Y.;Kang, Jung W.
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.6 no.2
    • /
    • pp.97-109
    • /
    • 2005
  • In this paper, the critical requirement for obstacle awareness and avoidance is assessed with the compliance of the equivalent level of safety regulation, and then the collision avoidance sensor system is presented with the key design parameters for the requirement of the smart unmanned aerial vehicle in low-altitude flight. Based on the assessment of various sensors, small-sized radar sensor is selected for the suitable candidate due to the real-time range and range-rate acquisition capability of the stationary and moving aircraft even under all-weather environments. Through the performance analysis for the system requirement, the conceptual design result of radar sensor model is proposed with the range detection probability and collision avoidance mode is established based on the time-to-collision, which is analyzed by collision scenario.