• Title/Summary/Keyword: Repair works

Search Result 195, Processing Time 0.023 seconds

Standardization of Maintenance and Failure of Transfer Crane (Transfer Crane의 고장 및 정비 표준화)

  • Yun Won-Young;Lee You-Hyoun;Ha Young-Ju;Kim Gui-Rae;Son Bum-Shin
    • Journal of Navigation and Port Research
    • /
    • v.30 no.6 s.112
    • /
    • pp.525-531
    • /
    • 2006
  • In the port, the yard crane is very important. If a container crane or a transfer crane is broken down, it costs a lot because of the delay of work during the period of repair or reorder. But, we don't have enough spare parts because of the high cost. It is necessary to maintain high reliability of the crane through effective preventive maintenance and failure analysis. In this paper, we analyse the function and failure mechanism of the transfer crane which is a main equipment in the yard Also, we standardize failures and maintenance works using the historical data of failure and maintenance. This study which is a basic work for effective equipment operation and maintenance will support reliability engineers to decide the optimal design of the next generation equipment and operational policy of equipment.

The Development of Maintenance Process in Long-Life Housing (장수명 공동주택 유지관리를 위한 프로세스 구축에 대한 연구)

  • Ji, Jang-Hun;Kim, Soo-Am;Yoon, Sang-Cho
    • Journal of the Korean housing association
    • /
    • v.21 no.3
    • /
    • pp.115-124
    • /
    • 2010
  • The environment which has been destroyed for the national growth since 1960's would seem to offer infinite resources to human, but now, the existence of human being is threatened by the development thoughtless for the environment. The World Powers have concentrated on green growth with eco-friendly resource since the end of 20th century. Korea suggested that the vision was the low carbon for green growth in 2008. It is necessary to supply Long-Life Housing in the green technology in terms of the sustainable housing development based on various life style, life cycle of the residences, the restrain remodeling and redevelopment in construction. This study is aim to establish the development of maintenance process to make continuous inhabitation of Long-Life Housing that has the separated SI for maintenance, durability, variability and remodeling. The maintenance for Long-Life Housing is very important to have more than 50~70 years the long term of life cycle in comparison with Housing. Also, the roles of manager and user are important parts in Long-Life Housing. The present maintenance for Housing is shift and repair works by the routine maintenance and demage. However, The maintenance for Long-Life Housing should consider movement and flexibility. In addition, Long-Life Housing requires the proper process of maintenance because it is different from Housing in housing concept, design and constructions stage. Therefore this study shows the efficient maintenance process for Long-Life Housing.

The Effective Process of Apartment Housing Defect Management Using Smart Device (스마트 기기를 활용한 공동주택 하자 관리의 효율화 방안)

  • Suh, Jung-Il;Lee, Jae-Woong;Lee, Jeong-Ho;Kim, Young-Suk
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.27-36
    • /
    • 2012
  • Recently, apartment housing tends to increase 3-4% every year by economic growth and development of construction technology in domestic construction industry. According to this tendency, construction enterprises are providing high-quality and various residential space, and residents also want high-quality apartment housing without any defect. Construction company make efforts to decrease construction defects in order to satisfy all the residents, and to improve company value. However, it is impossible to have no defect in construction because construction works are combination of many different complicated process. Because of the responsibility for the defect, conflicts between construction company and residents have been occurred. This study suggests defects management method that can be used from defect register phase to defect repair phase with a function of smart-device of the high penetration rate. The effectiveness use of the suggested method might save defects maintenance time and improve resident satisfaction about construction quality.

Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project (노후공동주택 리모델링의 개략견적을 위한 BIM 데이터베이스 구축)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.53-64
    • /
    • 2010
  • Remodeling becomes the significant issue in the aspect of the resource recycling, because it does not demolishes the whole buildings, but a part of main structure. However, compared with new construction, remodeling has several problems of adding the repair and rehabilitation works, using the partial demolition method, and having difficulties of making decision due to disagreement between several owner organizations. BIM, which is the total solution for managing and producing information during whole life cycle of the buildings, seems to be the right solution for the way to address these issues. has a possibility for solving the problems. Therefore this paper provided the framework and database for applying the BIM in the remodeling, and proved the applicability of the BIM database in the remodeling project through the case studies.

New Bone Formation in Experimental Model of Vascularized Periosteal Flap for the Bone Defect in the Shaft of the Radius of Rabbit - Radiological, Histological and Immunohistochemical Study - (가토 요골 간부 골 결손시에 혈관 부착 골막 보존 유무에 따른 신생골 형성에 대한 실험적 연구)

  • Chung, Duke-Whan;Yum, Jae-Kwang;Tae, Suk-Kee;Ko, Kwang-Won
    • Archives of Reconstructive Microsurgery
    • /
    • v.8 no.2
    • /
    • pp.97-107
    • /
    • 1999
  • The osteogenic capacity of the vascularized periosteum autograft has been extensively demonstrated by experimental works. The objective of this study was to characterize the behavior of experimental model of vascularized periosteal flap(VPF) by observing sequential stages of osteogenesis after simulated VPF in rabbits. In experimental group, segmental resection of bone including the periosteum was performed in 22 radii of 22 New Zealand white rabbits preserving the periosteal circulation of median artery to the periosteum. In order to simulate the transplantation of VPF, the vascular pedicle consisting of median artery and veins was dissected from adjacent soft tissue and the periosteum was longitudinally incised to remove the bone followed by repair of the periosteum. From the first to sixteenth week after the simulated VPF, the changes in VPFs were observed by radiological, light microscopical, scanning electron microscopical methods and the activity of osteocalcin was measured by immunohistochemical method. In control group, the bone tissue and periosteum were completely removed from the mid-shaft of radius and the findings were observed by radiological and light microscopical methods. From the results of this study, it is demonstrated that the experimental model of VPF is vigorously and uniformly osteogenic. Therefore it is thought that VPF can be used as a measure to treat bone defect of shaft of long bone.

  • PDF

An Analysis on the Correlation between Crack Condition and Safety Grades in Masonry Buildings (조적조 건축물의 균열양태 및 등급판정과의 상관성에 관한 연구)

  • Kwon, Ki-Hyuk
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.3
    • /
    • pp.101-110
    • /
    • 2005
  • In Seoul, structural deterioration is severe in the private masonry buildings which have been built since 1906s. But most of these structures remain without any repair works. As a result, the rate of deterioration is getting faster and these dangerous structures may cause hazardous circumstances to the adjacent structures and neighborhood. The purpose of this study is to investigate the actual conditions of wall cracks among the defect types which occur in private masonry buildings and to analyze the correlation between safety grades and wall cracks for offering the fundamental data. Using these date we can establish basic criteria for safety grades of structures and improve the quality of masonry buildings. The result of this study indicate that there are high correlations between safety grades and the width of crack but much less so with the length. Furthermore, with regard to crack patterns, vertical cracks much more negatively effected the safety grades.

Overseas Design Introduction of Road Rehabilitation Project in Keshim~Faizabad, Afghanistan (아프가니스탄 케심-파이자베드간 도로복구사업 해외설계 사례)

  • Jeong, Dong-Ho;Kim, Woo-Sun;Kim, Gee-Baek;Jeong, Won-Joon;Lee, Seung-Woo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.569-580
    • /
    • 2008
  • If slope height was more than 20 meters, we conducted an analysis of stereographic projection and limit equilibrium at this slope. We proposed reduction of slope face angle and reinforcement of rock bolt depending on analysis. Blasting design : Standard pattern based on result of local test blasting was made for blasting design. Vibration criterion was set for less than 3.0mm/s because of outworn buildings and inhabitants opinions. Production blasting and Controlled blasting has been done as Construction standard pattern. After Vibration Monitoring has been done, so that we can control of complement. "Bidding Document" and AASHTO 2001 "A Policy on Geometric Design of Highways and Streets" were so for design criteria of earthwork but they were different actual design criteria and left something to be desired in Afghanistan. Therefore, although "Bidding Document" and "AASHTO 2001" were basic design criteria, domestic design criteria was reflected in this design criteria for complement by discussion with supervisor. Drainage design : For stability ratio, ditch of arch block and stonework was designed by rainfall data for the 13 years and discussion with supervisor. Pavement was designed as flexible pavement. Because these days in Afghanistan postwar repair works, especially urgent repairing of roads and newly making of roads, are very highly in progress, I think that Afghanistan is the region about which our construction technical experts should have great concerns.

  • PDF

Integrity test and depth estimation of deep foundations (깊은 기초의 건전도시험과 근입깊이 조사)

  • Jo Churl-hyun;Jung Hyun-key;Lee Tai-sup;Kim Hag-soo
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 1999.08a
    • /
    • pp.202-216
    • /
    • 1999
  • The deep foundation is frequently used for the infrastructures. Since the quality control of the cast-in-place concrete foundations such as CIP piles and slurry walls is not so easy as that of the ready made PC(prestressed concrete) piles, it is necessary to get the information on the integrity of the concrete of the foundation. The depth estimation of foundations whose depths are unknown is also very important in repair and reinforcement works or in safety inspection and assessment to the big structures. The cross-hole sonic logging(CSL) system and the single channel reflection seismic measurement system were developed to test the integrity of pile. The former is well applied to CIP structures, while the later to all kinds of piles with less accurate result compared to that of CSL. To estimate the depth of the deep foundations, parallel seismics, borehole RADAR, and borehole magnetics can be used.

  • PDF

Mix Design of Polymer Grouting Mortar for Prepacked Concrete Using Polymer Dispersions (폴리머 디스퍼션을 이용한 프리팩트 콘크리트용 주입 모르타르의 배합에 관한 연구)

  • Jo, Young-Kug;Kim, Wan-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.85-91
    • /
    • 2008
  • Prepacked concrete has recently been used in the special constructions fields such as underwater concrete work, heavy-weight concrete work, underground structure work, partial repair works for damaged reinforced concrete structures. and polymer-modified mortars have been employed as grouting mortars for the prepacked concrete. The purpose of this study is to recommend the optimum mix design of polymer-modified grouting mortars for prepacked concrete. Polymer-modified mortars using SBR and EVA emulsions as admixture of grouting mortars for prepacked concrete are prepared with various mix proportions such as sand-binder ratio, fly ash replacement ratio, polymer-binder ratio. and tested for flowability, viscosity of grouting mortars, bleeding ratio, expansion ratio, flexural and compressive strengths of grouting mortars and compressive and tensile strengths of prepacked concretes. From the test results, it is apparent that polymer-modified mortars can be produced as grouting mortars when proper mix design is chosen. We can design the mix proportions of high strength mortars for prepacked concrete according to the control of mix design factors such as type of polymer, polymer-binder ratio, sand-binder ratio and fly ash replacement ratio. Water-binder ratio of plain mortars for a constant flowability value are in the ranges of 43% to 50%. SBR-modified mortar has a little water-binder ratios compared to those of plain mortar, however, EVA-modified mortar needs a high water-binder ratio due to a high viscosity of polymer dispersion. The expansion and bleeding ratios of grouting mortars are also controlled in the proper value ranges. Polymer-modified grouting mortars have good flexural. compressive and tensile strengths, are not affected with various properties with increasing fly ash replacement to cement and binder-sand ratio. In this study, SBR-modified grouting mortar with a polymer-binder ratio of 10% or less, a fly ash replacement of 10% to cement and a sand-binder ratio of 1.5 is recommended as a grouting mortar for prepacked concrete.

An Analysis of Operation and Considerations for the Introduction of Performance Warranty Contracting (해외 성능계약제도의 운영현황 및 국내 도입시 고려사항 제시)

  • Cho, Su-Kyung;Seo, Yong-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.446-449
    • /
    • 2007
  • For the restoration of construction industry, the government have offered the policy since the end of 1990. It has offered to develop the world-class technology and establish the effective production structure. In the government policy, the delivery and contracting method has improved so that construction industry could be recognized. Foreign countries have conducted the R&D and application of Innovative Contracting for improvement of facilities, reduction of LCC and innovation of contractor. Among the Innovative Contracting, 'Performance Warranty Contracting' is defined that A guarantee of the integrity of a product and of the makers responsibility for the replacement or repair of deficiencies. Performance Warranty Contracting is used for technology developments of contractor, improvement of quality, reduction of LCC, prevention of early deficiencies and reduction of owner's inspection works. This paper analyzes concept and effects of Performance Warranty Contracting and presents considerations according to the introduction.

  • PDF