• Title/Summary/Keyword: Repair works

Search Result 195, Processing Time 0.019 seconds

The Field Operation and Policies of Repair Works for Architectural Treasures in Late Japanese Colonial era based on Repair Works of Hwaumsa Kakhwangjeon (화엄사 각황전 수리공사를 통해 본 「보존령」 제정 이후 일제강점기 보물 건조물 수리공사의 현장운영과 수리방침)

  • Seo, Hyo-Won;Jeon, Bong-Hee
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.1
    • /
    • pp.41-52
    • /
    • 2018
  • The purpose of this study is to examine the circumstances of repair works after enacting "Low for Conservation of Joseon Treasure, Historic Site, Scenic Beauty & Natural Monument (朝鮮寶物古跡名勝天然記念物保存令)". For this purpose, the official documents produced by the Government-general Museum of Joseon were analyzed. They included the contents of repair works of Hwaumsa Kakhwangjeon(華嚴寺 覺皇 殿). As a result, this study reveals that the repair work of Hwaumsa Kakhwangjeon had become a momentum of introducing specific guidelines such as "Guidelines for Architectural Treasure's Repair 寶物建造物修理施行準則", "Regulations for administration of Hwaumsa Kakhwangjeon's repair work 華嚴寺覺皇殿修理工事取扱手續)". The guidelines and regulations systematized the planning phase of the repair works and provided to organize the field office formed by experts. In spite of these positive changes, the repair works were controlled by the central government to the certain extent, and the Japanese repair techniques were mingled with traditional techniques recklessly.

Identification of Core Items for Repair Works of Apartment Housing by Evaluating Necessity of Repair Work and Buren of Repair Cost (수선필요도와 비용부담도 평가를 통한 공동주택 수선공사 핵심항목 도출방안)

  • Song, Sanghoon;Lee, Seok-Je;Park, Seong-Sik
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.79-86
    • /
    • 2016
  • Purpose: Frequently, the apartment management offices have difficulties in effective repair works due to their insufficient technological capability to operate long-term repair program. There also have been many cases of failure in executing urgent repairs mainly because the repair allowance has not accumulated enough for the repair works on time. This study aimed to determine core items in apartment maintenance in order to reduce the confusion and unnecessary efforts for the management office by suggesting simple list of repair items. Method: Core items are defined using several indicators. The degrees of necessity for repair work(NRW) are calculated combining the impacts to living, safety, and aesthetics. Then the degrees of burden of repair cost(BRC) are estimated by analyzing actual long-term repair program of three apartment complexes. Lastly the degrees of accumulation demand for repair allowance(AD) are calculated with NRW and BRC. Result: The core items and essential items are suggested for three apartment types as case studies based on the indicators of NRW, BRC, and AD. Then, the required accumulated allowance per $m^2$ was calculated to effectively implement repair works.

Thrice Repair Works and Three Space Conceptions in Seokguram - focusing on Seokguram Architecture and Virtual Space Division of Inside and Outside - (석굴암, 세 번의 수리 공사와 세 개의 공간 개념 - 석굴암 건축과 안팎의 공간 구분을 중심으로 -)

  • Yoon, Chae-Shin
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.8
    • /
    • pp.89-100
    • /
    • 2019
  • The purpose of this study is to critically review the repair works of Seokguram architecture and to search for its original form and space. Seokguram's architectural form has been transformed throughout three repair works. The first transformation occurred during the repair work of the Colonial Government in 1913-1915, and the second occurred during the repair work of the Colonial Government in 1920-1923. The repair work done by the Korean Government in 1961-1964 also caused a severe change in the architectural form and space of Seokguram architecture. The more the repair work was added to Seokguram, the more its original form flew away like a mirage. Through the three repair works, the spatial composition of Seokguram changed in the following directions: from ((front chamber + passageway) + main chamber) to (front chamber + (passageway + main chamber)) through the second repair work, from (front chamber + (passageway + main chamber)) to (front chamber + passageway + main chamber) through the last repair work. Although the compositional space hierarchy of Seokguram was maintained during the first repair work, the architectural form based on the dry method was changed to the form based on the wet method. The Korean government's repair work was a tragedy for the 'Seokguram conservation project' that the people who led the conservation process misunderstood the architectural nature of Seokguram.

A Studt on the Physical and Chemical Properties of Epoxy Resin in RC Structures (RC 구조물 보수용 에폭시 레진의 물리.화학적 특성 고찰)

  • 김도겸;유영찬;이장화;박승범
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.571-578
    • /
    • 1997
  • In the repair and repair works, epoxy resins are widely used as repair materials. The successful concrete repairs and retrofit works depends on the quality of the repair and retrofit materials. Although many materials for the repairs and retrofit have been developed in many contries, information on the repair methods are somewhat limited. Futhermore, the repairs and retrofit methods are also largely dependent on those froms in other developed contries, it is necessary to initiate rather fundamental repair-related research. The purpose of this study is to investigate th physical and mechanical properties of epoxy resin which is commonly used in repairing concrte crack in RC structures. The basic physical properties such as specific gravity, gel point and shrinkage ratio as well as the mechanical properties such ad the tensile and compressive strength, elastic modulus were acquired by the standard test method (KS code). For the test results, the great deviations of physical and mechanical properties among the test materials were discovered and is, therefore, recommended that careful attentions should be give in selecting the epoxy resin by considering the characteristics of the repair materials and repair works.

  • PDF

Repair Procedure and Structural Strength Analysis to Damage of Moon-Pool Structure for Drillship During Construction (드릴쉽 건조 중 문풀 구조 수정 작업 및 구조적 안정성 검토)

  • Yoo, In-Sang;Sohn, Sang-Young;Baek, Seung-Jung;Choi, Young-Lack;Yoo, Hae-Kun;Yoon, Ki-Jeong
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2011.09a
    • /
    • pp.12-16
    • /
    • 2011
  • During the shipbuilding construction, the repair works will be occurred by various reasons such as the natural disaster, mistakes of engineers or workers, defect of material, and so on. The one of the engineer's responsibilities is to design considering every possibility and to prevent the repair works due to the mistakes during construction stages, but actually it is very difficult and impossible to avoid every mistake. However, it is also the responsibility of engineers to find the best solution for the unavoidable mistakes which is to maintain the capacity of vessel and guarantee the safety for the repair works considering the construction schedules and economic cost. In this paper, it will be introduced the brief of repair works to the structural damage of the moon-pool structure in drillship which is built in our shipyard. For the verification of the structural strength, the fatigue analysis has been carried out based on the guide of Classification society. Furthermore, the modifications of structure design and welding procedure have been applied to avoid the stress concentration in the moon-pool structure.

  • PDF

Design and Manufacture of the Packer of Sewages Mainteance (하수관 보수를 위한 Packer 설계 및 제작)

  • 정재후;윤지섭;김영환;이종열;홍동희
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.576-579
    • /
    • 1997
  • In order to repair sewage pipes, it is necessary to dig up the damaged sewage pipes, which results in traffic jams. Since digging up the pipes takes too much time and cost, this method is inefficient. So, in stead of digging up the damaged pipes, a robot is sent down to the pipe to do the repair works. For big pipes, human workers go into the pipe and do to repair works, but for small pipes, it is impossible for human worker to go inside the pipe. In this case, mobile robots have used. The procedures for repairing pipes are as follows : First, the condition of the sewage pipes is observed by a robot. Second, appropriate steps for repair are determined according to the types of the damage. While repairing procedures, a newly-developed packer is sent into the sport to be repaired inside the pipe. Then, the packer is filled with air by a V-shaped wrinkel pipe. This makes the packer inflates uniformly and adhere closely to the inside wall of the pipe in large area. This increases the area that can be repaired. Therefore, the newly-developed packer will be very helpful for sewage pipe repair works.

  • PDF

Preliminary Study on the Coordination of the Repair works' items of the Long Term Repair Plan in Apartment Housing (공동주택 장기수선계획 수립기준 항목 조정에 관한 기초 연구)

  • Lee, Kang-Hee
    • Journal of the Korean housing association
    • /
    • v.27 no.4
    • /
    • pp.13-22
    • /
    • 2016
  • The long term plan for apartment housing has a important role to make a decision making whether a repair work should be done or not. But, items for repair works are so various that field workers could not understand the context or plan the repair cost and time. These difficulties are drawn from the number of repair items, duplicated application and meaning, new material application and technology time-gap. Therefore, it needs to change or coordinate the repair items to improve the repair condition, reflecting the current material level or repair technologies. In this paper, it aimed at coordination of the repair items through the repair recording sheet which was surveyed in 22 metropolitan areas of Seoul, conducted between 2011 and 2014. The surveyed data are classified into six categories such as building exterior, building interior and so on, according to long term repair plan and the number of data are 1,918. It analyzed the appearing word for repair-concerned and compared the existing items of the long term plan. Items of building exterior are proposed as roof, exterior wall and painting. Building interior has a little meaning to propose the repair items. The water supply facilities are proper to keep the existing repair items. Items of the outdoor facilities could not need a sign board, drainage root and PVC sheath. Through this study, we can coordinate the repair items in apartment and provide the repair item and cost level.

Maintenance & Repairs of pier Structure (교각구조물의 유지보수)

  • 김규린
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.35-43
    • /
    • 2001
  • This paper Is described for the maintenance and repair method for the pier structure currently under repair works in the Han river bridges. During the economic growth period from the year 1960 to 1980, our engineer was concentrated only for study of the construction method of bridge. We have neglected the importance for the maintenance & repair method of construction structure. Therefore this paper will give you some ideas of repair and maintenance method.

  • PDF

A Study on Standardization of Supervision Cost by Investigating Supervision Workload in Cultural Heritage Repair Works (문화재수리공사의 감리업무량 조사를 통한 감리대가 기준 마련 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.32-42
    • /
    • 2013
  • The Korean Government introduced a cultural heritage supervision system in January 2010 to control quality and to prevent poor construction. However, cultural heritage related constructions that require supervision, a scope of supervision, supervision cost and placement of supervisors have not been standardized yet. For this reason, standards of supervision for repair works of cultural heritage that reflect the characteristics of small-scale repair works and restoration of cultural heritage are required. Accordingly, this study has suggested standards of supervision works and cost by analyzing the average construction period that is suitable for the characteristics of cultural heritage repair works. In other words, this study has suggested standards of full-time supervision costs by applying the fixed amount-added method (adding direct labor cost, direct expenses, overhead expenses, engineering fee, charges for additional works and VAT) which is the same as the method of calculating supervision costs for public construction projects because a supervisor has to work full time at a construction site to perform supervision if the project is a mid/large-scale cultural heritage repair work. Also, this study has suggested standards of part-time supervision costs for a small-scale cultural heritage repair work and the ways of supervising the construction projects by visiting the project site on important occasions. According to the result of the analysis by applying the forgoing standards of supervision costs for cultural heritage, a full-time supervision cost for cultural heritage repair works is approximately 98% compared to the construction supervision of a public construction project, and a part-time supervision is approximately 158% compared to architectural construction supervision. It is expected that the valuable cultural heritage of Korea will be preserved by controlling quality of cultural heritage repair works through the application of this study result - the standards of supervision costs for cultural heritage repair works - to an actual project.

The investigation of erosion control works' condition in East sea fire area (동해안 대형 산불피해지의 사방사업 실태진단)

  • Yeom, Kyu-Jin;Chun, Kun-Woo;Cha, Doo-Song;Lee, Si-Young;Lee, Hyun-Kyu;Lee, Myung-Woog;Kim, Youn-Jin;Lee, Jin-Ho;Kim, Suk-Woo;Tsugio, Ezaki
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.509-512
    • /
    • 2007
  • The fire area need management to prevent enlargement of collapes and sinkage. and it need that repair Vegetation sack work, Soil arresting structure, Terrace-sodding works, Direct seeding works in greening works and Water cushion in erosion control dam. The whole of the Concrete stream grade stabilization structures were broken, it need to be repair. As pass the time, a lot of structures were abandoned. Therefore, it need to reorganize erosion control structures and the method of construction in the fire area

  • PDF