Browse > Article
http://dx.doi.org/10.6106/KJCEM.2013.14.1.032

A Study on Standardization of Supervision Cost by Investigating Supervision Workload in Cultural Heritage Repair Works  

Park, Hwan-Pyo (한국건설기술연구원 건설관리경제연구실)
Han, Jae-Goo (한국건설기술연구원 건설관리경제연구실)
Publication Information
Korean Journal of Construction Engineering and Management / v.14, no.1, 2013 , pp. 32-42 More about this Journal
Abstract
The Korean Government introduced a cultural heritage supervision system in January 2010 to control quality and to prevent poor construction. However, cultural heritage related constructions that require supervision, a scope of supervision, supervision cost and placement of supervisors have not been standardized yet. For this reason, standards of supervision for repair works of cultural heritage that reflect the characteristics of small-scale repair works and restoration of cultural heritage are required. Accordingly, this study has suggested standards of supervision works and cost by analyzing the average construction period that is suitable for the characteristics of cultural heritage repair works. In other words, this study has suggested standards of full-time supervision costs by applying the fixed amount-added method (adding direct labor cost, direct expenses, overhead expenses, engineering fee, charges for additional works and VAT) which is the same as the method of calculating supervision costs for public construction projects because a supervisor has to work full time at a construction site to perform supervision if the project is a mid/large-scale cultural heritage repair work. Also, this study has suggested standards of part-time supervision costs for a small-scale cultural heritage repair work and the ways of supervising the construction projects by visiting the project site on important occasions. According to the result of the analysis by applying the forgoing standards of supervision costs for cultural heritage, a full-time supervision cost for cultural heritage repair works is approximately 98% compared to the construction supervision of a public construction project, and a part-time supervision is approximately 158% compared to architectural construction supervision. It is expected that the valuable cultural heritage of Korea will be preserved by controlling quality of cultural heritage repair works through the application of this study result - the standards of supervision costs for cultural heritage repair works - to an actual project.
Keywords
Cultural heritage repair Works; supervision system; standard of supervision Cost; full-time supervision; part-time supervision;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 이웅균.유위성.김동인.김태훈.차민수.조훈희 (2012). 사례분석을 통한 건설사업관리 대가산정 방법 개선, 한국건설관리학회 논문집 제13권 제4호, p.17   과학기술학회마을   DOI   ScienceOn
2 류한국.손보식.부승현.김경환.이현수 (2006). 주상복합건물의 감리제도 개선방안과 기대효과, 한국건설관리학회논문집 제7권 제2호, p.65   과학기술학회마을
3 박환표 (2010). 문화재수리공사의 감리대가 작성방향에 관한 연구, 한국건축시공학회 201년 추계 학술논문 발표대회 논문집, pp. 143-144
4 김진호 (2009). 건축문화재 부실수리 및 수리공사의 문제점 분석을 통한 수리정보관리 방안의 고찰, 대한건축학회연합논문집 v.11 n.03 (통권39호), p.228