• Title/Summary/Keyword: Railway signalling

Search Result 169, Processing Time 0.025 seconds

Study for trial project of Intelligent Train Control System (MBS) at Korail Bundang Line (분당선 지능형열차제어시스템 (MBS) 시범설비구축 사업에 관한 고찰)

  • Kim, Yun-Bae;Yoon, Ho-Sok
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.339-342
    • /
    • 2008
  • In this paper, the lessons and learns are introduced from the result of the trial project which is the first CBTC(Communication Based Train Control System) at Korail Bundang Line. This project has started end of 2002 and finished recently by Samsung SDS. The main purpose of this project was that new technology was seek for next generation of railway signal control system adapted in Korea. In 2002, there was no any revenue service system using Radio Frequency CBTC in the world at that time. Just a few trial project was on going in USA and EU. In well developed cities, the metro system have been built and old enough therefore they have to be considering re-signalling their existing system with advanced system for increasing availabilities of line usage and safety. This Bundang Line Trial Project was the first Korean CBTC project for above reasons. Most sub systems have been developed using local technology such as Electronics Controlled Interlocking System and Track Circuit Systems etc. Specially, in this project the RF-Communication devices are developed by local technology using DSSS(Direct Sequency Spread Spectrum) instead of FHSS(Frequency Hopping Spread Spectrum). This project has lasted for more than five years originally planned for three years because it was only accessible only night time in the main line from Ori to Suseo about 20km long. Each night only 2 and half hours are available to use the main line. Now the trial project has been done successfully with meet the customer's requirement, therefore the upgrade the mainline of Bundang line and another extension area up to Wangsipli to make revenue service using this new technology. This paper shows this result of the trial project and the strategy of upgrade and extension project as well.

  • PDF

A study of performing Fall-Back operation in RF-CBTC signalling system (RF-CBTC 신호방식에서 Fall-Back 시스템 구축방안)

  • Jeon, Jae-Hun;Kang, Deok-Won;Lee, Jong-Seong
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.145-153
    • /
    • 2011
  • In the system necessary for safety such as the train control system, to make train control information be sent correctly is very important to enable organic movement between trains. In the case of the system such as RF-CBTC (Radio Frequency Communication Based Train Control) the control related information is sent through wireless transmission between on-board system of a train and wayside transmitter. The wayside transmitter collects the running information such as location, velocity from the on-board system and operates the optimizing control by sending the control information such as the target, limited velocity to the on-board system. But, when the communication disconnect or train failure, the critical hazard such as train collision or derailment may be possible because the RF-CBTC depends on the information through wireless communication. This paper discribes of performing Fall-Back system to detect train position in the case of rail break or communication failure to avoid train accident and allows train to be operated safely. It can be implemented with ATP function through track circuits using active-type transformers and axle counters, and allows train to be operated manually in emergency status.

  • PDF

Multi-discipline simulation of light rail transit system using object oriented method (객체지향모델를 이용한 경량전철 시스템의 성능 시뮬레이션)

  • Jeong, Sang-Gi;Jeong, Rak-Gyo;Han, Seok-Yun
    • 시스템엔지니어링워크숍
    • /
    • s.4
    • /
    • pp.70-80
    • /
    • 2004
  • Most rail system related simulations currently used are designed to simulate only one discipline system. This obviously assunes the other discipline system are running regularly not being affected by the system being simulated. In this paper a multi discipline simulator is proposed and its design concept is presented.A multi discipline simulator is the simultor in which major subsystems with different technical discipline are simulated simultaneously. The advantage of the simulator is in that it makes it possible to analyze the systems behavior while other discipline system vary. With this we can identify the possible to analyze the systems ehavior find their solutions. A proto type simulator has bee developed using object oriented programming. Object concept was judged best suitable to model the various multi-discipline self-controlling railway subsystems. It was applied to the target system, which is under development by the Korea Railroad Research institute. The test results show it is very useful in design verification. It could also be a good tool in research and development work to make to improe the system.

  • PDF

A Study on Software Static Analysis Method on IEC 62279 (IEC 62279 규격의 소프트웨어 정적분석에 관한 연구)

  • Jin, Zhe-Huan;Li, Chang-Long;Lee, Jae-Ho;Kim, Jae-Sik;Lee, Key-Seo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.10 no.4
    • /
    • pp.513-519
    • /
    • 2015
  • Static analysis is one of the software source code analysis tools. 9 static analysis methods of three groups are recommended by international electro-technical commission about software safety related standard in IEC 62279. In this paper we choose the proper static analysis method from IEC 62279 about the train wayside communication system, Shorten the time of railway signalling software development using LDRA tools. And it wil be useful to improve the effective development of the safety-related software.

A Study on the Propagation of Harmonic Current in the Traction Power Supply System (철도 전력공급시스템에서의 고조파전류 확대현상에 관한 연구)

  • Oh, K.H.;Chang, S.H.;Han, M.S.;Lee, C.M.;Shin, H.S.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.908-910
    • /
    • 1998
  • Modern AC electric car has PWM(Pulse Width Modulation) -controlled converters, which give rise to higher harmonics. The current harmonics injected from AC electric car is propagated through power feeding circuit. As the feeding circuit is a distributed constant circuit composed of RLC, the capacitance of the feeding circuit and the inductance on the side of power system cause a parallel resonance and a magnification of current harmonics at a specific frequency. The magnified current harmonics usually brings about various problems. That is, the current harmonics makes interference in the adjacent lines of communications and the railway signalling system. Furthermore, in case it flows on the side of power system, not only overheating and vibration at the power capacitors but also wrong operation at the protective devices can occur. Therefore, the exact assessment of the harmonic current flow must be undertaken at design and planning stage for the electric traction systems. From these point of view, this study presents an approach to model and to analyse traction power feeding system focused on the amplification of harmonic current. The proposed algorithm is applied to a standard AT(Auto-transformer)-fed test system in which electric car with PWM-controlled converters is running.

  • PDF

A Study on the Protection Wire Type Decision of Catenary System in the 350km/h High Speed Line (350km/h급 고속전차선로 보호선의 선종결정 기법에 관한 연구)

  • Lee, Hack-Pyo;Seo, Ki-Bum;Park, Jae-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.12
    • /
    • pp.1818-1823
    • /
    • 2015
  • In this paper, we analyzed the optimal configuration of protection wire that have been installed in the electric railway power supply system. Protection wires are to suppress the ground potential rise when the short circuit fault between contact wire-rail(C-F), and protect the electronics equipments(signalling and communication) that are facility the wayside. The role of protection wires must be feed back quickly the fault current to the substation when a short circuit fault occurs. In this paper, we proposed that only one line to install the protection wire. Comparing how to newly proposed and existing system, most of the performance is similar. The reason is that most of the current flowing in the protection wire near the location where the fault occurred. There is no problem even if in one line for human safe and the low impedance of the return circuit in dimension to ensure the safety of the facility during the fault. To ensure safety during an fault occurs, it is sufficient even by one line. But, In the protection wire of facilities planning it is necessary to design taking into account the potential utility.

Amendment Research of Safety Standard of Urban Railroad Vehicle for LRT (경전철 차량 안전기준 적용을 위한 개정 연구)

  • Hong, Jai-Sung;Lee, An-Ho;Cho, Bong-Kwan;Cho, Hong-Shik
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.441-445
    • /
    • 2008
  • LRT is eco-friendly transportation system and can be constructed at less than half cost of subway. Therefore many local governments have planned to construct a various type of LRT and some of them were already under construction. In Para. 2 of Art. 22 of the "Enforcement Decree of Urban Railroad Act" - safety standard of urban railroad vehicle, It can't be operated if "structures and devices" don't come up to standard required to safety operation. Constructor or operator should give an order or operate according to safety standard in Art. 3 of the Safety Standard of Urban Railroad Vehicle. Safety Standard of Urban Railroad Vehicle of 2000 was reformed once to tighten fire safety standard in 2004 after subway accident in Daegue. It was entirely made for medium and large-sized electric motor car. LRT, based on driverless operation and articulated bogie, has different safety standard in signalling devices and the axle load. etc. So many institutes related LRT have required to amend. In this paper, we described features of LRT vehicle and necessity of amendment and discussed how it should be amended.

  • PDF

The Study on Centralization & Electronic for Maintenance Efficiency of Ground Signaling System (지상신호설비의 유지보수 효율화를 위한 집중화 및 전자화 연구)

  • Baek, Jong-Hyen;Kim, Yong-Kyu;Lee, Kang-Mi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.8
    • /
    • pp.2983-2988
    • /
    • 2010
  • The train control system used in Gyeongbu-line is classified in ATC, IXL and CTC. Domestic railway signaling systems are being developed by electrification. In these systems the electrification of interlocking reaches 57% and the safety equipments of railway crossings in trackside devices have completed their development into an integrated system. Block systems of all the existing sections have not yet electrified and integrated so that they need a number of complement in terms of construction and maintenance. For ABS currently used in existing domestic lines, and LEU being installed in Gyeongbu and Honam lines, although a train is controlled by the signaling information of the same train in the same location, the system is separately installed so that the same information is separately divided and transmitted at the each distinct system. Therefore, in the conventional ABS and LEU, there are a lot of duplicate installed compartments such as lamp detection and a power supply unit. Hence, we have a lot of problems: for maintenance, a lot of manpower and costs need to be invested and the overall manufacturing costs get higher, as well as the construction costs by duplicate. Therefore, this paper suggest design to develop an integrated electronic Block Control Unit by the integration of the currently used ABS, and communication and electronic technology. We are to monitor and manage the block systems in the corresponding station by integrating. And we are to transmit information together with LEU, which is an ATS wayside transmitter.

Verification of safety integrity for vital data processing device through quantitative safety analysis (정량적 안전성 분석을 통한 Vital 데이터 처리장치의 안전무결성 요구사항 검증)

  • Choi, Jin-Woo;Park, Jae-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4863-4870
    • /
    • 2015
  • Currently, as a priority to secure the safety of the railway signalling system, verification for satisfy of the safety integrity requirements(SIR) is required to the essential elements. Safety Integrity Requirements(SIR) verification is performed based on the system safety analysis. But the probability of securing basic data for system safety analysis significantly dropped because there is no experience yet performed in the country. Therefore we are had to rely on a qualitative analysis. There are methods such as qualitative risk analysis matrix, and risk graphs. The qualitative analysis is wide, the width of the accident. However, the reliability of the result is significantly less has a disadvantage. Therefore, it should be parallel quantitative safety analysis of the system/products in order to compensate for the disadvantages of the qualitative analysis. This paper presents a quantitative safety analysis method to overcome the disadvantages of the qualitative analysis. And through a result, highly reliable Safety Integrity Requirements(SIR) verification measures proposed. Verification results, the dangerous failure incidence for vital data processing device was calculated to be $1.172279{\times}10^{-9}$. The result was verified to exceed the required safety integrity targets more.