Study for trial project of Intelligent Train Control System (MBS) at Korail Bundang Line

분당선 지능형열차제어시스템 (MBS) 시범설비구축 사업에 관한 고찰

  • Published : 2008.06.12

Abstract

In this paper, the lessons and learns are introduced from the result of the trial project which is the first CBTC(Communication Based Train Control System) at Korail Bundang Line. This project has started end of 2002 and finished recently by Samsung SDS. The main purpose of this project was that new technology was seek for next generation of railway signal control system adapted in Korea. In 2002, there was no any revenue service system using Radio Frequency CBTC in the world at that time. Just a few trial project was on going in USA and EU. In well developed cities, the metro system have been built and old enough therefore they have to be considering re-signalling their existing system with advanced system for increasing availabilities of line usage and safety. This Bundang Line Trial Project was the first Korean CBTC project for above reasons. Most sub systems have been developed using local technology such as Electronics Controlled Interlocking System and Track Circuit Systems etc. Specially, in this project the RF-Communication devices are developed by local technology using DSSS(Direct Sequency Spread Spectrum) instead of FHSS(Frequency Hopping Spread Spectrum). This project has lasted for more than five years originally planned for three years because it was only accessible only night time in the main line from Ori to Suseo about 20km long. Each night only 2 and half hours are available to use the main line. Now the trial project has been done successfully with meet the customer's requirement, therefore the upgrade the mainline of Bundang line and another extension area up to Wangsipli to make revenue service using this new technology. This paper shows this result of the trial project and the strategy of upgrade and extension project as well.

Keywords