• Title/Summary/Keyword: Railway facility management

Search Result 59, Processing Time 0.03 seconds

A Study on Managing High-Speed Railway Links and Rolling Stocks Based on the Level of Service (서비스수준(LOS)을 감안한 고속철도 노선 및 차량관리방안)

  • Oh, Jae Kyoung;Kim, Si Gon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.1025-1032
    • /
    • 2017
  • In this paper, the level of service (LOS) is defined for high-speed railway links and rolling stocks. Based on this LOS, how to manage high-speed railway facility is also suggested. The LOS is divided into 6 levels from A to F. The measurement of effectiveness (MOE) for railway links is derived from the relationship between a total delay time and a railway link utilization ratio. Another MOE, volume over capacity (V/C), is also proposed. On the other hand, the LOS for high-speed railway rolling stocks is based on the density of people in a rolling stock. Above all, LOS D is defined to the total number of seats. Then, LOS A is 50% of the LOS D, LOS B is 70% of the LOS D, LOS C is 90% of the LOS D and LOS D~F is defined as the maximum seats and standing people at the level of each. Finally, a method to manage high-speed railway links and rolling stocks is proposed in order to keep the level of service at the target by the government.

3D Track Models Generation and Applications Based on LiDAR Data for Railway Route Management (철도노선관리에서의 LIDAR 데이터 기반의 3차원 궤적 모델 생성 및 적용)

  • Yeon, Sang-Ho;Lee, Young-Dae
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1099-1104
    • /
    • 2007
  • The visual implementation of 3-dimensional national environment is focused by the requirement and importance in the fields such as, national development plan, telecommunication facility deployment plan, railway construction, construction engineering, spatial city development, safety and disaster prevention engineering. The currently used DEM system using contour lines, which embodies national geographic information based on the 2-D digital maps and facility information has limitation in implementation in reproducing the 3-D spatial city. Moreover, this method often neglects the altitude of the rail way infrastructure which has narrow width and long length. There it is needed to apply laser measurement technique in the spatial target object to obtain accuracy. Currently, the LiDAR data which combines the laser measurement skill and GPS has been introduced to obtain high resolution accuracy in the altitude measurement. In this paper, we first investigate the LiDAR based researches in advanced foreign countries, then we propose data a generation scheme and an algorithm for the optimal manage and synthesis of railway facility system in our 3-D spatial terrain information. For this object, LiDAR based height data transformed to DEM, and the realtime unification of the vector via digital image mapping and raster via exactness evaluation is transformed to make it possible to trace the model of generated 3-dimensional railway model with long distance for 3D tract model generation.

  • PDF

An applicable RCM method for Track circuit equipment of AREX's Signalling System (공항철도 궤도회로장치에 대한 RCM 적용 방안)

  • Song, Mi-Ok;Lim, Sung-Soo;Lee, Chang-Hwan;Park, Seung-Keun
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1126-1131
    • /
    • 2008
  • In this paper we introduce an applicable RCM(Reliability centered maintenance) method for Track circuit equipment of AREX's Signalling System. AREX computerize all the process of FRACAS(Failure Reporting, Analysis and Corrective Action System)) by the Facility Management System of Integrated Information System. These datum were analysed and reproduced as the RAMS index value which can be used by maintenance staff for optimizing the maintenance method of the System.

  • PDF

A Standardized Management Plan on the Characteristic Factor of Station to Meet a Customer Service in the Urban Transit (도시철도 고객서비스 만족을 위한 역 특성요소의 표준화 관리방안)

  • Kang, Tae-Soo;Kim, Seong-Ho;Bae, Kyung-Suk
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.3
    • /
    • pp.300-305
    • /
    • 2012
  • The saving of time, which is defined as the demand from passengers and the supply from the urban railway, must be balanced. The selected factors influencing on the balance are the traffic, customer contact facilities, the number of failures, customer complaints(VOC), passenger moving time and transfer stations. Also, the overall ratio of SMRT's 4 lines is generated by differentiating the rate of each attribute in each factor. This is not only to differentiate the stations with peculiar factors but also to standardize criteria of the personalized services. Furthermore, as part of standardization, standard drawings of facility management are prepared for the improvement on the management of human resource and material. The drawings include passenger moving lines, location of safety incidents and also indicate the rating of the factors in each station and overall evaluation rating. In conclusion, this thesis aims to improve customer satisfaction constantly by reducing passenger moving time, through the differentiated management of each station.

Failure Management System for AREX's Signalling System (공항철도 신호시스템의 고장관리 체계)

  • Song, Mi-Ok;Lim, Sung-Soo;Lee, Chang-Hwan;Kim, In-Gyu
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.676-682
    • /
    • 2007
  • In this paper we introduce the Failure Management System for AREX's Signalling System which is applied by RAMS management. The corrective action report is classified into 3 group, scheduled maintenance, non-scheduled maintenance and the reported failure maintenance. The scheduled maintenance is for the failure detected by periodic inspection and it is concerned as the Preventive Maintenance. The reported failure maintenance is for the failure reported by non-maintenance staff and non-scheduled maintenance includes all corrective action except the works of the previous 2 group. RAMS analysis is based on the FRACAS data connected with the corrective action reports. AREX computerize the all process by the Facility Management System of Integrated Information System.

  • PDF

The Analysis on the Effects of the Failure Reduction Strategies of the Railway Facilities (도시철도 시설물 장애감소 전략과 효과 분석- 서울도시철도공사를 중심으로 -)

  • Yun, Seong-Chan;Park, Jong-Hun;Kim, Sung-Chun;Eum, Sung-Jik
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.6
    • /
    • pp.608-616
    • /
    • 2010
  • Seoul Metropolitan Rapid Transit Corporation, managing the line number 5,6,7 and 8 has inspected and maintained for the maintenance of the facilities spread in the extended 152km and 148 stations. Despite the thorough inspection for prevention of the facility failure, the failure has continuously occurred, due to the environmental factors of the underground, mechanical worn-out caused by frequent use, aging facilities, system error, negligence on use, etc. We have achieved a 53.4% reduction in the number of failure by the end of June, 2010 by breaking the conventional way of inspections and maintenance and by adopting quantitative goal management and new way of work. In this paper, we will analyze the problems of inspections and maintenance of the railway facilities, the failure reduction strategy and the performance of each strategy.

Research on Facility Layout of Prefabricated Building Construction Site

  • Yang, Zhehui;Lu, Ying;Zhang, Xing;Sun, Mingkang;Shi, Yufeng
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.42-51
    • /
    • 2017
  • Due to the high degree of mechanization and the good environmental benefits, the prefabricated buildings are being promoted in China. The construction site layout of the prefabricated buildings has important influence on its safety benefit. However, few scholars have studied the safety problem on it. Firstly, in order to give a follow-up study foreshadowing the characteristics of prefabricated buildings are analyzed, the research assumptions are given and three types of safety buffers are established. And then a mult-objective model for the prefabricated buildings site layout is presented: taking into account the limits of noise, the coverage of the tower crane and the possibility of exceeding boundaries and overlapping, the constraints are and designed established respectively; Based on the improved System Layout Planning (SLP) method, the efficiency\cost\safety interaction matrices among the facilities are also founded for objective function. For the sake of convenience, a hypothetical facility layout case of the prefabricated building is used, the optimal solution of that is obtained in MATLAB with particle swarm algorithm (PSO), which proves the effectiveness of the model presented in this paper.

  • PDF

SMRT STnF Construction and Performance (서울특별시도시철도공사 STnF 구축과 성과)

  • Lee, Jong-Kye;Park, Jong-Hun;Kim, Ki-Chun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2573-2580
    • /
    • 2011
  • SMRT(Seoul Metropolitan Rapid Transit Corporation) changed PC-oriented office system to Smart-Phone oriented mobile office system(STnF: SMRT Talk & Flash), and provided smart phone to all staffs. STnF make it possible not only voice communication between staff, but also to input and inquiry all kind of information related to work(ex: Facility maintenance, Rolling Stock management, office management, Finance, human resource etc.) based on smart phone. STnF conquers the limitation of time and space. All staffs can commute to the site directly to reduce moving time and to share information between staffs, so SMRT improve speed and reliability of work by making a quick decision and action on the spot. After introduction of STnF, within 1 year, the equipment failure ratio fell to 47%. Mobile office system reduced and level-off the step of approval. so enhanced civil customer service. Quantification and scientific movement of work make it fast evolution and development. These business improvement make it possible to put more outstanding manpower on new business and R&D project, and this contributes to company's management effectiveness.

  • PDF

A Study on The Major Environmental Effecting Factors for The Selection Environment-Friendly Railway Corridor (환경 친화적 철도노선대 선정을 위한 주요환경 영향인자에 관한 연구)

  • Kim, Dong-Ki
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.31 no.2
    • /
    • pp.132-138
    • /
    • 2009
  • The energy efficiency and environment-friendly aspect of the railway system would be superior to other on-land transportation systems. In a preliminary feasibility study stage and selection of optimal railway corridor, the energy efficiency and problems related to environment are usually not considered. For the selection of optimal railway corridor, geographical features and facility of management are generally considered. Environment effect factors for the selection of environment-friendly railway corridor are focused and studied in this paper. In this study, various analysis of opinion of specialists (railway, environment, transport, urban planning, survey) and the guideline for construction of environment-friendly railway were accomplished. From these results of various analysis, 7 major categories (topography/geology, flora and fauna, Nature Property, air quality, water quality, noise/vibration, visual impact/cultural assets) were extracted. To select environment friendly railway corridors, many alternatives should be compared optimal corridor must be selected by a comprehensive assessment considering these 7 categories. The investment for railway systems can be encouraged by the considering of main environmental effect factor evaluated with the modified environmental weight factors for environment-friendly railway construction.

Design of Automatic Inspection System for Maintenance of Unmanned Monitoring Facility (무인감시설비 유지보수를 위한 자동점검시스템 설계)

  • Moon, Chaeyoung;Kim, Semin;Ryoo, Kwangki
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2018.05a
    • /
    • pp.515-517
    • /
    • 2018
  • Access to public facilities such as substations, dams and railway facilities is strictly controlled, and unmanned surveillance equipment has been introduced and operated recently due to the development of IT technology and the government's cost reduction policy. However, if an unmanned surveillance system is broken, surveillance space, information leakage caused by intruders, and damage to facilities may occur. Also, it is necessary to check periodical visit by the manager in order to check the surveillance facilities, which causes additional management costs. In order to solve this problem, we designed a system to check the operation status of the unmanned monitoring facility in real time, attempt to recover automatically when a problem occurs, and notify the administrator of the problem. The designed system consists of an NVR that receives and judges information such as image, sound, and lighting condition, and a control device that detects and restores the state of the unmanned monitoring facility. The system proposed in this paper is expected to contribute to the improvement of the economic efficiency due to the minimization of surveillance space due to the failure of the unmanned monitoring facility and the reduction of the inspection cost.

  • PDF