• Title/Summary/Keyword: Railway construction project management

Search Result 61, Processing Time 0.028 seconds

A Study on the Improvement of Railway Construction Schedule Using KTX Construction Case (경부고속철도 사례분석을 통한 철도건설공기 개선에 관한 연구)

  • Yang, Yeonjong;Chung, Byunghyun
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.662-669
    • /
    • 2012
  • In 2004, KTX operated in Korea on the 5th in the world. But there are various factor on planed schedule delay of Big National Construction Project like Seoul-Busan High Speed Rail Project(Seoul-Busan HSR). For example, Often change of government policy, project management control problem of design and construction, conflict of interested party like environmental organization/resident are the main delay factors. The suggestions for improvement of the construction schedule through the Seoul-Busan HSR will help to make a new leap forward in rail construction.

An Analysis of Installation of Railway Construction Project Management System on Carbon Reduction (철도건설 사업관리시스템 도입에 따른 탄소저감 효과 분석)

  • Park, Jun-Tae;Ahn, Tae-Bong
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.3
    • /
    • pp.382-388
    • /
    • 2017
  • In response to the global warming crisis, the Kyoto protocol was established by major developed countries in 1997. The Paris Agreement, which imposes a carbon reduction obligation for both developed countries and developing countries, was signed in 2015. Regulations and efforts to reduce greenhouse gas emissions accordingly have been implemented. In this study, we analyzed the reduction of carbon emissions computerizing of the traditional project management system for efficient railway construction at Korea Rail Network Authority. We suggest a model that measures two major effects of carbon reduction, stemming from transportation and from a decrease of paper use. In this paper, we calculate the amount of carbon reduction and the economic effect of carbon reduction with application of the construction project management system at Korea Rail Network Authority. The model and methodology in this study are expected to be helpful to measure the carbon reduction performance for similar e-transformation.

A Strategy of Construction through Rationally Adapting JV(Joint Venture) in Large Public Constructions (대형공공공사에 J/V(Joint Venture)시스템의 합리적 도입을 통한 건설사업 효율화 전략)

  • 이태식;김용천;박동찬;선우강;김열규
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.24-29
    • /
    • 2001
  • Despite of the introduction some sorts of the contract and the bid method like CM(Construction management) that will be efficient to manage the construction project. Korean agencies limit to control project management to do large public constructions. In the case of Taiwan, THSRC is apply J/V system in the public construction project, they are accomplishing that expend optimal the cost and save the construction time. To success J/V it has two factors, one is risk management and another is sharing information of construction project. Therefore, we will study to introduce J/V system to our construction project.

  • PDF

A Study of BIM Delivery Model for Railway Construction Project using BIM Function Breakdown Structure (BIM 기능요소 분류체계 도출에 의한 철도시설공사 BIM 기능발주 구성 방안)

  • Kim, Young-Hwan;Kim, Hyeon-Seung;Kang, Leen-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.4
    • /
    • pp.344-353
    • /
    • 2015
  • Recently, the utilization of the BIM system has been extended to cost and resource simulation, visualized management of construction site information and application of augmented reality including basic 3D modeling. Therefore, various BIM functions are being developed for practical applications. However, since clear classification criteria and knowledge information of BIM functions are not sufficient for field engineers, it is difficult to identify the necessary BIM functions for a construction project. This study suggests a BIM function breakdown structure considering the individual functional properties and a process model that can be ordered by applying BIM in a railway construction project. The proposed delivery model is used to obtain a practical utilization of BIM by analyzing features applicable to railway construction projects; model is verified using a case project.

Developing the Management System of the Constructing Railway Safety Test Facilities Using the Model-Based Systems Engineering Approach (모델기반 시스템엔지니어링 접근을 통한 철도안전 시험설비구축 사업 관리체계 개발)

  • Kim, Yun-Mi;Choi, Kyoung-Jin;Cho, Youn-Ok
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1964-1969
    • /
    • 2008
  • A railway is a complex system integrated with a lot of technical elements such as rolling stock, power, signal control, communications, tracks, stations, operation control systems, and so on. As a mass transportation system, a railway could contain potential risks that may result in a high death rate and property losses. Accordingly, Railroad Safety Technology R&D Corps. is adopting the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective project management methods with Systems Engineering techniques. To support that, we propose the more effectual management method of constructing the Railway Safety Test Facilities applying the model-based systems engineering tool to the research.

  • PDF

Development of Risk Analysis Method for Railway Facility Management (철도시설물 관리를 위한 리스크 분석기법 적용 방법론 연구)

  • Kang, Leen-Seok;Park, Seo-Young;Youn, Seon-Mi;Kim, Hyun-Soo
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.341-344
    • /
    • 2006
  • Most construction companies recognize the necessity of risk management. The practical application, however, is not easy because of the absence of systematic procedure for risk management and the difficulty in objectification of subjective risk factors. This study suggests a systematic procedure and a web-based analysis system. In the first place for those researches, this study analyzes the present condition of risk management in the railway facility construction industry. Finally, this study defines risk management procedures as preparation, identification, analysis, response and risk analysis method to manage potential risks in the railway construction project.

  • PDF

Management of RAMS for Railway System in view of System Life Cycle (시스템 수명주기 관점에서의 철도시스템 RAMS 관리 방안)

  • Lee, Chang-Hwan;Park, Byoung-Noh;Ahn, Heon-Chan
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.221-225
    • /
    • 2011
  • The railway system consists of many items such as sub-systems, equipments and parts to accomplish the required function. Also the railway system is very complex system that these items are connected with interface among items. According with this complexity, the process of system engineering is applied to the construction of new railway project to manage systematically. In addition, the research about system engineering is progressing in recent. The RAMS management is one part of system engineering, and is to assure the required safety and performance. Also, this RAMS should be managed through system life cycle. This paper show the case study of management of RAMS during construction and operation phase in respect of system life cycle. As a result of this research, the best way of RAMS management based on system engineering in operation phase for railway system is suggested.

  • PDF

A Study on Improving the Constructing System of Railway Safety Test Facilities (철도안전성능시험설비 구축 체계 개선에 관한 연구)

  • Kim, Yun-Mi;Choi, Kyoung-Jin;Cho, Youn-Ok
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2034-2039
    • /
    • 2010
  • As a mass transportation system, a railway contains potential risks that may result in a high death rate and property losses. Accordingly, Railroad Safety Technology R&D Corps. is adopting the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective project management methods with Systems Engineering techniques. When a system or a service is realized, such as the Railway Total Safety Project, it needs to be verified by requirements and the process of verification is to check whether customers/stakeholders requirements have been properly transformed into a system or a service. Recently, building the standardized verification system up could be the solution to reduce possible system-failed risks. To support that, we propose the more effectual verification method of constructing the Railway Safety Test Facilities applying the systems engineering tool to the research.

  • PDF

Basic Study on Electrified Railway Design Management using VE(Value Engineering) Techniques (VE 기법을 이용한 철도 설계관리에 관한 기초연구)

  • Cho, Rae-Hyuck;Hwang, Sung-Gwang
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.849-855
    • /
    • 2005
  • Railway fields are complicatedly connected with engineering such as physics, civil engineering, architecture engineering, electrical engineering (Telecommunication, signal, catenary, system), machine engineering and performance phase of project in domestic railway can be divided with four steps : planning, design, supervision, construction. Value Engineering is needed to reduce the cost of long period construction duration and periodically maintenance. Currently, railway design is difficult to act optimum design due to limited time, short of manpower, downsized of design company. therefore, VE concept in Design must require In order to solve this problem. it is called Design Management. This paper presents both item of design management and total design management tool of practical aspects, and describes LCC (Life Cycle Cost) analyze process and accomplishment process for applying VE concept

  • PDF

A Development Plan for PMIS based on Total Life Cycle (전수명주기를 고려한 PMIS개발 방안)

  • Park, Soo-Choong;Lee, Seong-Gwon;Jung, Kye-Young;Kim, Jae-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1282-1288
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF