• Title/Summary/Keyword: Railway Schedule

Search Result 99, Processing Time 0.034 seconds

Test and Analysis of Voltage Drop according to Load Capacity in Traction Power Supply System (전기철도 일형식 부하 크기에 따른 전압강하 측정 및 분석)

  • Kim, Joo-Rak;Jang, Dong-Uk;Chang, Sang-Hoon;Lee, Young-Heum
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.940-947
    • /
    • 2011
  • Load capacity varies according to a day of the week in traction power supply system, because time schedule in railway is changed as demand for passengers and freights. Therefore, Voltage drop also varies as load capacity. In Korea railway, Voltage collected from catenary in train is decreased, as load supplied traction power supply system is increased. Therefore, investigation about voltage drop should be performed, before development of countermeasure against voltage drop. The investigation can be performed by simulation or field test. Naturally, field test is more precise than simulation. In addition, field test should be carried out at peak load. This paper presents test and analysis about voltage drop in railway. The test is performed in both a day of the week and weekend. The analysis is figured out comparison load capacity between two days and voltage drop across terminal.

  • PDF

Conceptual Simulation Model for Evaluating Availability of Railway System (철도 시스템 가용성능 시뮬레이션 개념 모형)

  • Kim, Jong-Woon;Kim, Hee-Wook;Ohn, Jung-Ghun;Kwon, Tae-Soo;Jeong, Do-Sik
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1241-1245
    • /
    • 2011
  • High RAM performance and efficient operation plan and maintenance equipment and policies are needed for improving the system availability performance such as punctuality and schedule adherence while reducing life cycle cost. Because railway systems are repairable, complex and have multi-echelon maintenance support structure, it is much complicated to set RAM performance targets and operation and maintenance plan. It is not easy to solve these problem by mathematical method and simulation can be consider for them. This article suggests the conceptual simulation model for analysing availability of railway system which has complex system structure and operation/maintenance environment.

  • PDF

A Basic Study on the Railway Safety Management Based on Risk Assessment Approach (위험도 평가기법을 적용한 철도시스템의 안전관리)

  • Kim Sang Am;Wang Jong Bae;Kwak Sang Log;Lee Dong Ha
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.223-228
    • /
    • 2003
  • Risk Management does not mean accepting a risk but having a good grasp of, eliminating and controling the exact causes of known hazards. Good safety management plan or system for the safety of any systems need to include the procedures about standing safety goals, related technical information, time schedule, audit programs, etc at least. In this paper the summeries on general risk assessment techniques and the examples of risk assessment system and railway risk management strategies used in UK, Australia and Canada are introduced, and applicable establishment procedures for domestic railway industries are proposed.

  • PDF

Measurement and Analysis of Voltage Drop in Traction Power Supply System (전기철도 급전시스템의 안정화를 위한 전압강하 측정 결과 분석)

  • Kim, Joo-Rak;Lee, Young-Heum
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2210-2211
    • /
    • 2011
  • Load capacity varies according to a day of the week in traction power supply system, because time schedule in railway is changed as demand for passengers and freights. Therefore, Voltage drop also varies as load capacity. In Korea railway, Voltage collected from catenary in train is decreased, as load supplied traction power supply system is increased. Therefore, investigation about voltage drop should be performed, before development of countermeasure against voltage drop. The investigation can be performed by simulation or field test. Naturally, field test is more precise than simulation. In addition, field test should be carried out at peak load. This paper presents test and analysis about voltage drop in railway. The test is performed in both a day of the week and weekend. The analysis is figured out comparison load capacity between two days and voltage drop across terminal.

  • PDF

A study on the exchange Kaesong area sightseeing train movement by the inter-Korean Railway Connection (남북철도 연결에 따른 개성지역 관광열차 운행에 대한 연구)

  • Park, Hong-Soon
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.570-575
    • /
    • 2004
  • This paper deals with the exchange of tourists and the operation of sightseeing train encouraged by the inter-Korean cross-border railway project. First of all, how the inter-Korean cross-border railway project has developed will be discussed. After this, the present tourism state, facilities, the state of railways and roads of North Korea, and major tourist attraction around the Kyonguisun will be shown. And then, several aspects on the agreements between the Korean National Railroad (KORAIL) and North Korean railroad system will be summarized. And, finally, the economic effect of the line including the operation schedule of the Kyonguisun sightseeing train, the demand forecast, the computation of railway fare, and profit sharing will be depicted.

  • PDF

A LOGIT based Traffic Assignment Model Considering Passenger Transfer on Railway Network (철도 네트워크에서 환승수요를 고려한 다항로짓 기반 통행배정 모형 연구)

  • Park, Bum-Hwan;Rho, Hag-Lae;Cheon, Seung-Hoon;Lee, Jin-Sun
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.3
    • /
    • pp.276-284
    • /
    • 2011
  • In our study, we present a new LOGIT-based traffic assignment model applicable to intercity railway network. Most traffic assignment models have been developed for public transit assignment in urban area, so that they are known to produce unrealistic results in intercity railway demand analysis. Especially, since the introduction of KTX, more passengers are using a route including KTX service and the schedule becomes more compatible with transfer. Our study presents a new LOGIT-based traffic assignment model considering passenger transfer. To do so, we suggest a new route search algorithm to find K paths with non increasing order in the utility value.

Changes in the Rail Freight Policy of the UK focusing on Grants (영국 철도화물정책의 변화 - 보조금제도를 중심으로 -)

  • Lee Yong-Sang
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.441-448
    • /
    • 2006
  • Following the recent privatization of the UK railway system there has been an increase in the volume of rail freight. It. Influential factors include the problem of road congestion, and policies towards increasing grants. With a focus on grants (government subsidies), this paper examines changes in rail freight, and the tasks facing the UK railway. I attempt to explain recent trends in rail freight grants and changes that have positively influenced the rail freight. In particular, I demonstrate the trends in rail freight and scheme which link the government and industry. Moreover, I explain the grants scheme and method of calculation, concisely. Finally I reveal the characteristics of UK rail grants scheme. In this paper, I argue that grants have played an important role of in the development of freight and that rail freight is more environment friendly than road transport. This paper have a many important aspects. Namely, an account of the introduction of the grant scheme of UK. Also, I explore the method of calculation of these grants. It will give some lessons for Korea rail. In conclusion, I note some suggestions and those problems which impede the freight transport. In future, the problems of some of these problems should be addressed, For example, the lack of infrastructure and development of an adequate train time schedule in case of rail freight have to be improved.

Development of the Transportation History DB System for the Scheduling and Seat Inventory Control (열차계획 및 열차좌석관리를 위한 수송실적 데이터베이스 시스템 개발)

  • 오석문;김영훈;황종규;김용규;이종우
    • Proceedings of the KSR Conference
    • /
    • 1998.05a
    • /
    • pp.23-30
    • /
    • 1998
  • The construction of the transportation history database system is to serve the scheduling and seat inventory controling. Recently, lots of countries have been faced with the advance era because of the new railway transportation system, like the high speed railway and/or magnetic levitation vehicle system. This can be reasonably translated as those of operators are willing to provide the more various and high quality schedule to the customer. Those operators' these ideas make possible to forecast that scheduling process is going to be complicated more and more The seat inventory control, so to speak Yield Management System(YMS), goes a long way to improve the total passenger revenue at the railway business. The YMS forecasts the number of the last reservation value(DCP# END) and recommends the optimal values on the seat sales. The history database system contains infra-data(ie, train, seat, sales) that will be the foundation of scheduling and seat inventory control application programs. The development of the application programs are reserved to the next step. The database system is installed on the pc platform(IBM compatible), using the DB2(RDBMS). And at next step, the platform and DBMS will be considered whether they can meet the users' requirement or not.

  • PDF

Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space (수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안)

  • Han, Seon Ju;Kim, Hyeon Seung;Park, Sang Mi;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.601-610
    • /
    • 2018
  • Since the building construction works are repeated vertically in a limited space, there is not a great need for the location information of each activity in the schedule management. On the other hand, civil engineering works such as road and railway projects consist of a large number of earthworks, long bridges, and long tunnels. These types of work should be controlled in a horizontal space according to the linear axis of several tens of kilometers. In other words, since most of the activities are managed in the unit of distance from the start point to the end point, it is possible to improve the efficiency of the schedule management by linking the location information of the activity with the schedule data in the schedule management system. This study presents a methodology for creating a linear schedule chart specific to a project with horizontal work space and compares the convenience with the existing Gantt chart. In addition, the methodology of linking linear schedule chart to the 4D CAD system, which is a typical BIM technology in the construction phase, is presented to improve the usability of BIM. The practical applicability of the proposed methodology was verified statistically.

An Algorithm for train conflict detection and resolution occurring in large station with high density traffic (대형.고밀도역 역내 열차 경합 검지 및 해소를 위한 수리 모형 및 해법)

  • Park, Bum-Hwan;Kim, Kyung-Min;Hong, Soon-Heum;Kim, Young-Hoon;Ahn, Jin;Lee, Young-Su;Ha, Sung-Tae
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1466-1474
    • /
    • 2007
  • In large station with high density traffic, trains is hardly controlled by CTC but by station dispatcher because CTC has difficulties in monitoring all states of affairs happening within the station such as departs and arrivals of many trains from different lines and shunting trains between yards and platforms, etc. Therefore station dispatcher has to make quick decision about how to schedule all trains including trains to arrive and depart before long. And such decisions become harder when an unexpected delay occurs. This study suggests a mathematical model and algorithm about how to detect in advance and resolve efficiently the conflicts occurring within a station and it will be shown how to reduce delay using our approach by means of analysing the schedule of ChyungRyangRi station.

  • PDF