• Title/Summary/Keyword: Railway Project

Search Result 574, Processing Time 0.031 seconds

A Preliminary Study of Railway Transport of LNG between TKR~TSR (TKR~TSR간 LNG 철도수송 연계를 위한 기초연구)

  • Ha, Oh-Keun;Hwang, Jae-Sik;Kim, Ick-Hee;Mun, Young-Woo
    • Land and Housing Review
    • /
    • v.6 no.2
    • /
    • pp.61-66
    • /
    • 2015
  • This study is the realization of natural gas as ways to advance the South and the continental railway linking basic research was conducted on railway transport. Summary data on the Status of North Korean railway which was to have reviewed the case of LNG railway transportation in Japan and China is becoming an LNG tank containers by rail transportation is done. In the case of Korea, the stability of railway transportation through the development of LNG tank containers and rail transportation pilot project was tested. It was set up and the basic directions of freight trains transport routes and methods for rail transport 7.5 million tons of natural gas per year. TKR ~ TSR between the LNG transportation business is an existing railway south. North. Russia gas pipeline (PNG) instead of a separate project to replace the business SRX (Silk Road Express) is a symbolic project for the early realization of the Eurasian railway linking policy. This study may give greater meaning to secure the iconic railway transport route for continental transport of containers and bulk cargo (coal, ores, etc.).

A Study on the Seasonal Decomposition of the Railway Passenger Demand (철도수요의 시계열 분해 방법에 대한 연구)

  • 오석문;김동희
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.111-116
    • /
    • 2001
  • This paper introduces how to adopt the X-12-ARIMA to decompose the railway passenger demand of the Korea National Railroad Especially, selecting on proper filters is focused. The trend filter is identical to the low pass filter in the signal Processing field, and so the seasonal filter is to band pass filter too. Some considerations, selecting a filter, are provided from the view-point of the spectrum analysis. The technique introduced in this paper will be adopted to the project that is to develope the forecasting system of Korea railway passenger demand which is a part of the high speed rail information system.

  • PDF

The review and application of UIC 518 standard regarding railway vehicle dynamic performances (철도차량 동적 주행성능 시험 및 인증관련 국제규격 (UIC 518) 고찰 및 적용)

  • Lee Kang-Wun;Park Kil-Bae;Yang Hee-Joo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.125-130
    • /
    • 2005
  • The railway shall be verified with the view point of dynamic performances before delivering to the Customer and the verification procedure shall be followed the Customer's demands or relevant international standard, UIC 518 (Testing and approval of railway vehicles from the point of view of their dynamic behavior-Safety-Track fatigue-Ride quality). In this paper, verification procedures in UIC 518 and the test results for domestic project are summarized.

  • PDF

RUSSIA-NORTH KOREA-SOUTH KOREA: TOWARDS COOPERATION IN THE FIELD OF TRANS-KOREAN RAILWAY PROJECT

  • Sivokon, Vyacheslav V.
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.153-157
    • /
    • 2002
  • The improvement of the situation on the Korean Peninsula, following the June 2000 Summit, has opened up the possibility of reconstructing the railway between the North and the South. The interconnection of the railway systems would allow cargo transportation from the south of the Korean Peninsula to Russia, China and Europe. This could open up a faster and more economical cargo transportation route than the all-water route.(omitted)

  • PDF

Construction of verification process for the railway total safety technology development project (철도종합안전기술개발사업의 성과물 검증 프로세스 구축)

  • Yoon, Hyuk-Jin;Han, Soon-Woo;Kim, Sang-Ahm;Choi, Kyung-Jin;Cho, Yun-Ok
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1187-1192
    • /
    • 2007
  • Recently, many organizations such as, including government, railroad operational, railroad facilities managemental and research authorities have made a lot of efforts to identify and prevent hazards from leading to accidents and solve them all over the railroad industry. Railroad total safety technology development project conducted as one of national R&D projects has established business formation structure based on system engineering as an effort to define and give a solution to facing problems in the field of railroad. This paper is building procedures to verify the outcomes derived from this project. The verification process is the one for verifying the outcome produced in the final stage of the project or during the project. It makes sure that the system is satisfying the system requirements through verification of the outcomes produced after conducting the project for verification. We've made verification plan for technically reasonable verification using verification process developed through this research, and established master verification plan in the level of 15 detailed projects for interim and final outcomes produced.

  • PDF

Paris Rive Gauche Project: (Re)developping the City on the City

  • Ernek, Benoit
    • Land and Housing Review
    • /
    • v.5 no.3
    • /
    • pp.123-129
    • /
    • 2014
  • Paris hasn't experienced such excitement since the huge changes brought about by Baron Haussmann in the 19th century. Paris Rive Gauche project, started in 1991, is the largest urban project in city ever since, it represents about 1% of Paris territory. It takes place on a workshops, factories and warehouses area that prospered along the Seine river and the railways in the 19th century. Originally planned as a business quarter, Paris Rive Gauche, developed by SEMAPA for the City of Paris, fosters urban diversity through housing, offices, public facilities, shops, creating a stimulating neighbourhood where 18,000 residents, 30,000 students as well as 60,000 employees will soon croth paths. This project's main principles are urban and social diversity, deployment of public facilites, the development of new university campus inside the city, promotion of industrial patrimony and connecting the old 13th distict to the river and the opposite side. Half of the project is going to be built on a concrete slab that covers the railway tracks which is one of the major performances of this long-term project. This concrete slab represents the new level of the City, about 6 to 8 meters above the railway tracks. We distinguish three families of buildings on the cover : Classic buildings; Bridges buildings and Connection buildings, these last guarantee the linkage between old and new level of the City.

A study on the exchange Kaesong area sightseeing train movement by the inter-Korean Railway Connection (남북철도 연결에 따른 개성지역 관광열차 운행에 대한 연구)

  • Park, Hong-Soon
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.570-575
    • /
    • 2004
  • This paper deals with the exchange of tourists and the operation of sightseeing train encouraged by the inter-Korean cross-border railway project. First of all, how the inter-Korean cross-border railway project has developed will be discussed. After this, the present tourism state, facilities, the state of railways and roads of North Korea, and major tourist attraction around the Kyonguisun will be shown. And then, several aspects on the agreements between the Korean National Railroad (KORAIL) and North Korean railroad system will be summarized. And, finally, the economic effect of the line including the operation schedule of the Kyonguisun sightseeing train, the demand forecast, the computation of railway fare, and profit sharing will be depicted.

  • PDF

Characteristics of High Speed Railway Noise (고속철도소음 특성)

  • Kang, Dae-Joon;Lee, D.G.;Jang, S.K.
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.11b
    • /
    • pp.541-546
    • /
    • 2002
  • Railway noise is one of the main causes of environmental impact. Whenever a new railway line is planned or a housing project near an existing railway is proposed, an estimate of the relevant levels is usually required. For this, it is necessary to quantify those parameters that affect the railway noise. Therefore we investigated the noise and vibration level which 107 high speed trains generated passing through the block of test railway track between Chunan and Chungwon. This paper presents the status and characteristics of the high speed railway noise and an accurate prediction of the high speed railway noise.

  • PDF

Characteristics of High Speed Railway Noise (고속철도소음 특성)

  • Daejoon Kang;D. G. Lee;S. K. JANG
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.11a
    • /
    • pp.356.2-356
    • /
    • 2002
  • Railway noise is one of the main causes of environmental impact. Whenever a new railway line is planned or a housing project near an existing railway is proposed, an estimate of the relevant levels is usually required. For this, it is necessary to quantify those parameters that affect the railway noise. Therefore we investigated the noise and vibration level which 107 high speed trains generated passing through the block of test railway track between Chunan and Chungwon. This paper presents the status and characteristics of the high speed railway noise and an accurate prediction of the high speed railway noise.

  • PDF

Study for trial project of Intelligent Train Control System (MBS) at Korail Bundang Line (분당선 지능형열차제어시스템 (MBS) 시범설비구축 사업에 관한 고찰)

  • Kim, Yun-Bae;Yoon, Ho-Sok
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.339-342
    • /
    • 2008
  • In this paper, the lessons and learns are introduced from the result of the trial project which is the first CBTC(Communication Based Train Control System) at Korail Bundang Line. This project has started end of 2002 and finished recently by Samsung SDS. The main purpose of this project was that new technology was seek for next generation of railway signal control system adapted in Korea. In 2002, there was no any revenue service system using Radio Frequency CBTC in the world at that time. Just a few trial project was on going in USA and EU. In well developed cities, the metro system have been built and old enough therefore they have to be considering re-signalling their existing system with advanced system for increasing availabilities of line usage and safety. This Bundang Line Trial Project was the first Korean CBTC project for above reasons. Most sub systems have been developed using local technology such as Electronics Controlled Interlocking System and Track Circuit Systems etc. Specially, in this project the RF-Communication devices are developed by local technology using DSSS(Direct Sequency Spread Spectrum) instead of FHSS(Frequency Hopping Spread Spectrum). This project has lasted for more than five years originally planned for three years because it was only accessible only night time in the main line from Ori to Suseo about 20km long. Each night only 2 and half hours are available to use the main line. Now the trial project has been done successfully with meet the customer's requirement, therefore the upgrade the mainline of Bundang line and another extension area up to Wangsipli to make revenue service using this new technology. This paper shows this result of the trial project and the strategy of upgrade and extension project as well.

  • PDF