• Title/Summary/Keyword: Railroad roadbed

Search Result 95, Processing Time 0.027 seconds

Evaluation on the Applicability of the Conventional Roadbed Stiffness for High Speed Concrete Track (일반철도 노반 강성조건에서의 고속철도용 콘크리트 궤도의 적용성 검토)

  • Lee, Jin Wook;Lee, Seong Hyeok;SaGong, Myung;Lyu, Tae Jin
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.1
    • /
    • pp.40-46
    • /
    • 2013
  • Based on Korean railway design standards, the thicknesses of the reinforced roadbeds of conventional and high speed railways are different, and so too, for the size distribution of the ballast particles. Accordingly, considerable cost would be required to increase operating speeds of conventional lines, in particular related to changing from a ballasted track system to a ballastless one. In this study, applicability of a roadbed which supports conventional ballasted track, for use as a ballastless track for a high speed rail line was examined. A reinforced roadbed for a conventional railway is 20cm thick, and the type of material used for a conventional reinforced roadbed is M-40 (crushed gravel for road embankments). A dynamics test was conducted to evaluate the occurrence of the permanent settlement of the track substructure. These results suggest that, without changes to the track substructure, an operational speed of 400km/h is feasible with a ballastless track. This result; however, is from laboratory experiments. Further studies, such as numerical analyses or field validation, are required.

Characteristics of Displacement of the Reinforced Roadbed Materials with Cyclic Loading (동적하중 재하시 강화노반 재료별 침하 특성)

  • 황선근;이성혁;최찬용
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.2
    • /
    • pp.70-76
    • /
    • 2002
  • In this study, performance of reinforced railroad roadbeds with the reinforced roadbed materials were investigated through the real scale roadbed tests. It was also found that the reinforced roadbed with reinforced roadbed materials has less elastic and plastic settlement than the one with soil. The slag roadbed was more effective than the crushed stone roadbed with the same condition for load distribution. Therefore considering overall characteristics of reinforced roadbed material, the optimum thickness was recommended as 50 cm. Furthermore the real scale model test under the simulated rainfall condition, the settlement in the slag roadbed was about 8 times smaller than the settlement in the soil roadbed.

Railroad Disaster Prevention System and Railroad Weather-Related Accidents and incidents according to Precipitation (철도방재시스템과 강우에 인한 철도기상사고)

  • Pakr, Jong-Kil;Jung, Woo-Sik;Kim, Hi-Man;Kim, Eun-Byul;Lee, Jae-Su
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2014-2020
    • /
    • 2010
  • This paper aims to find out characteristics of railroad weather-related accidents and incidents and to proposes the plan of railroad disaster prevention according to the precipitation. For this, we make the database about the railroad weather-related accidents and incidents and analysis the relationship between the hourly and cumulative precipitation and railroad accidents. The results are as follows; The weather events that have the most occurrence frequency of railroad weather-related accidents and incidents is a rainfall of the precipitation and then the cause of that was the falling rocks and the collapsed roadbed. The rainfall patterns of collapsed roadbed were classified into 4 groups. When the variation of hourly rainfall is 10/15 mm/hr over, we need to consider the caution/stop of train operation and a speed limit, respectively.

  • PDF

A Study on Field Behavioral Characteristics of the Roadbed according to the Speed Increase in High-Speed Train (HEMU-430x)

  • Eum, Ki-Young;Lee, Jee-Ha;Park, Young-Kon
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.78-84
    • /
    • 2013
  • This paper is about the first experiment in Korea that was conducted on speeding increase up with rail speeds at 430km/h at high speed railway of designed 350km/h. and analysis data collected on vibration accelerations of roadbed. There are barely references on roadbed behavior measurement with rail speeds more than 350 km/h in Korea as it has never been conducted the experiment on it. So the experiments were confirmed the reliability through crosschecking the figures/values from respective sensors and measuring devices after measuring EMS and ICP types. Based on the study, values of vibration acceleration were less than 12% compared with the ones that conducted while speeding up of HEMU-430X. Also, figures of HSB for concrete bed tracks were 52% against the standard. According to the results, all the performance evaluation of vibration acceleration for roadbeds in transition zones is under the standard.

Optimal Section of Ballasted Asphalt Track Considering Design Lifetime and Economic Feasibility (설계수명 및 경제성을 고려한 유도상 아스팔트 궤도의 최적 단면 산정)

  • Lee, Seonghyeok;Lee, Jinwook;Lee, Hyunmin
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.3
    • /
    • pp.241-251
    • /
    • 2015
  • Compared with ballasted track (BT), ballasted asphalt track (BAT) has been increasingly adopted in many countries due to its more greatly reduced reinforced roadbed thickness and smaller cumulative plastic deformation, and its advantages in terms of maintenance. In this respect, the authors' previous research includes analysis of BAT sections that show performance similar to that of BT sections of the present specifications; reliability verification of the analysis results through real-sized static and dynamic train-load tests were performed. Based on previous research, this paper estimates the track lifetime using the strain of the lower roadbed according to reinforced roadbed thickness; using probabilistic LCC analysis, this paper presents a BAT section that satisfies the design lifetime and that has performance similar to or higher than that of BT.

A Study on the Behavior during Constructing of Rigid Reinforced Roadbed to apply for the Slab Track (콘크리트궤도용 강성보강노반의 시공 중 거동에 관한 연구)

  • Kim, Ki-Hwan;Kim, Dae-Sang;Park, Seong-Yong;Park, Jong-Sik;Yoo, Chung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1774-1785
    • /
    • 2011
  • In this paper, Rigid Reinforced Roadbed(RRR) which is expected to have highly applicability to railroad roadbed, was introduced and field tests results were analyzed. Full scale model with 5m height concerning a single track railroad roadbed was constructed. The model had four different sections, which was to assess the effect of geogrid length, spacing, and connection method on deformation characteristics of RRR. Laser displacement meter, earth pressure cell, piezometer, and strain gauge were installed in order to analyze the behavior of reinforced embankment during construction. Horizontal displacements caused by compaction at each section were 20~30% below the displacement limit that of general reinforced retaining wall, which showed that RRR was very stable structure. Maximum tensile strength of reinforcement was withing 10% of the long-term design strength.

  • PDF

Evaluation of the Roadbed Behavior During Tilting-train Operation in Curved Track Using Numerical Analysis (틸팅차량의 곡선부 운행시 수치해석을 이용한 노반거동 평가)

  • Jeon, Sang-Soo;Eum, Gi-Young;Kim, Jae-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.6
    • /
    • pp.115-126
    • /
    • 2007
  • The tilting-train is very attractive to the railroad users in the world because it runs with high speed in curved track using pre-existing infrastructure. The tilting-train has a unique allowable speed and mechanism expecially in curved track. Therefore, it should be evaluated in terms of the stability of the train operation and roadbed. In this study, when the tilting-train is being operated with the allowable speed, the behavior of the roadbed is evaluated by examining the settlement and bearing capacity of the roadbed. Additionally, the stability of the roadbed is estimated in the condition of soft roadbed influenced by the weather effects and cyclic train loading. The numerical results show that the roadbed settlements satisfy the allowable settlement when Young's moduli of the upper roadbed and in-situ soil are more than $2,300t/m^2\;and\;3,300t/m^2$, respectively, in the continuous welded rail (CWR) and $3,800t/m^2\;and\;4,600t/m^2$, respectively, in the rail joint.

A Study on the Applicability of the Reinforced Railroad Roadbed Method by Field Test (현장부설시험을 통한 철도 강화노반공법의 적용성에 관한 연구)

  • 황선근;신민호;이성혁;최찬용;이시한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.215-222
    • /
    • 2000
  • The reinforced roadbed should have the ability to spread out the load intensity lower than the bearing capacity of the subgrade of track structure as well as to prevent the softening of roadbed by providing appropriate stiffness in the roadbed, thus fully supports the track structures. Full scale reinforced roadbeds with several different types of monotoring sensors was also constructed to evaluate the performance of each reinforced roadbed through the continuous monitoring while the train operation. In this study, Field tests such as PLT, SASW were also carried out at each reinforced roadbed. The results of the field and lab tests, installation and calibration of sensors, as well as construction condition of the reinforced roadbed are presented.

  • PDF

Performance of Railway Roadbed Reinforced by Acrylate in Laboratory Experiment (실내실험을 통한 아크릴레이트의 철도노반 보강 성능)

  • Yoon, Hwan-Hee;Son, Min;Kim, Jin-Hwan;Kim, Dong-Hyun;Kim, Byung-Hyun;Jung, Hyuk-Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.20 no.1
    • /
    • pp.9-19
    • /
    • 2021
  • This paper deals with the reinforcement performance of acrylate for reinforcing the settled railway roadbed. Concrete tracks have the advantage of reducing track maintenance costs and high resistance to track destruction. However, roadbed settlement is occurring in some construction sections, and the safety of railways is a serious concern because of difficulties in maintenance. Currently, maintenance through the track restoration method is being carried out in Korea as a way of roadbed settlement in concrete tracks, but continuous re-settlement can occur because the roadbed itself cannot be reinforced, and there are very few cases of reinforcement of railway roadbeds and field application. So the development of reinforcement materials and construction methods to reinforce railway roadbeds is required. Therefore, in this paper, acrylate was selected as reinforcement material for railway roadbed, and the reinforcement performance of acrylate was analyzed through experiment. As a result, it was analyzed that the acrylate can penetrate into a permeability coefficient of 1×10-4 cm/sec, and secure uniaxial compression strength of 0.5 MPa/30min or more and stiffness of 80 MPa or more.

Roadbed Behavior in Managanese Crossing of Turnout System (분기기 망간 크로싱부 노반거동)

  • Jeon, Sang-Soo;Eum, Ki-Young;Kim, Jae-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.2
    • /
    • pp.45-57
    • /
    • 2008
  • The improved turnout system is developed to speed-up the pre-existing railroad. The research has been actively carried out far the improved turnout system and the impact factor is estimated using the data sets achieved from the dynamic wheel-load field tests in both the conventional and the improved turnout system. In this study, the track performance and roadbed behavior are examined for the conventional and improved turnout system using the estimated impact factor. Dynamic wheel load and rail pressure are evaluated to assess the track performance. Roadbed stress and settlements are estimated using numerical analysis. Additionally, the stability of roadbed is estimated in soft roadbed condition influenced by the weather effects and cyclic train loading. The results show that dynamic wheel load, rail pressure, roadbed stress, and roadbed settlements in the improved turnout system substantially decrease compared with those in the conventional turnout system.