• Title/Summary/Keyword: Queue Waiting Line

Search Result 10, Processing Time 0.026 seconds

Queueing Analysis by Menu Management Systems in Cafeteria of the Business Foodservices (카페테리아 식단을 제공하는 사업체 급식소의 식단운영 형태에 따른 대기행렬 분석)

  • 양일선
    • Journal of Nutrition and Health
    • /
    • v.31 no.8
    • /
    • pp.1347-1354
    • /
    • 1998
  • The purposes of this study were to : (a) anlayze wating time, service rate, arrival rate, and coustomer expectations/satisfaction in cafeteria business foodservices and (b) identify the differences in those factors between foodservices by menu managmenet systems. The samples were two business foodservices operated by contract management in Seoul. The queue, laptime , service rate, and arrival rate were measured at each foodservice by stopwatch observation. The menu type, delivery system, number of meals served , servide time, and turnover rate of each foodservic was investigated. Questionnaires were developed to survey customer expectations and satisfaction. Satistical data analysis was completed using the SAS package programs for descriptive analysis and t-test. The mean waiting time of island type dafeteria system with separte set -menu was shorter than that of the other. In both foodservices, arrival rates were not significantly different from one another , but sevice rates were significnatly high in dafeteria menu systems. The peak time of the queue was found out at combination set menu line. The separate set menu line had a higher servide rate than the combination set menu line. The mean waiting time of the island type cafeteria line was shorter than that of the straifth type . At the straight type dafeterial line, both arrival rate and service rate were higher than those of island-type. The results of this study suggested that a separate set-menu would be more desirable than a combination set-menu in case of providing set menu with cafeteria menu.

  • PDF

Comparison of DBR with CONWIP in a Production Line with Constant Processing Times (상수 공정 시간을 갖는 라인 생산 시스템에서 DBR과 CONWIP의 성능 비교 분석)

  • Lee, Hochang;Seo, Dong-Won
    • Journal of the Korea Society for Simulation
    • /
    • v.21 no.4
    • /
    • pp.11-24
    • /
    • 2012
  • We compared a DBR(drum-buffer-rope) system with a CONWIP(constant work-in-process) system in a production line with constant processing times. Based on the observation that a WIP-controlled line production system such as DBR and CONWIP is equivalent to a m-node tandem queue with finite buffer, we applied a max-plus algebra based solution method for the tandem queue to evaluate the performance of two systems. Numerical examples with 6 workstations were also used to demonstrate the proposed analysis. The mathematical analyses support that CONWIP outperforms DBR in terms of expected waiting time and WIP. Unlike the CONWIP case, sequencing workstations in a DBR affects the performance of the system. Delaying a bottleneck station in a DBR reduces expected waiting time.

A Study of Optimization in the Queue, Finite Population (유한모집단 대열기법에 의한 최적화 연구)

  • 오충환
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.1 no.1
    • /
    • pp.37-44
    • /
    • 1978
  • The purpose of this study is to search for an efficient application method in solving delay-phenomenon problems which influence upon total production cost through case study. The method of this study is an experimental study based on cutting time data in lead cutting operations from "Lead Cutting Machine (Stripper)" and its service rate data from a large electronic products company which utilizes conveyor line system for the products "Car Stereo" The procedure of this experimental study is as follows; 1) Using loading(Man-Hour) analysis technique j,1 order to analyse and evaluate Production capacity, efficiency, operation and idle rate assembly charge, waiting and service cost -when its are controlled by stripper operator(server) 2) Establishing adequate waiting time model of finite population caused by the interference of 4 stripper machine which is drawn from mathematical statistics testing, that is, goodness of fit test in the waiting and service rate and to search for optimal solution by utilizing the above mentioned model The experimental result was that amount to 8,546,618won Per year was brought down, that is, by optimum point, it shows a decrease as compared with Present point. The major limitation of this experimental study is that the Queue in the Finite Population, so to speak. it comes from the interference of 4 stripper machine dealt with this case were limited only on the Car Stereo conveyor line. Further study of application of this application method to the areas such as material handling, personnel management marketing and transportation management is strong1y recommended.trong1y recommended.

  • PDF

Comparison of CONWIP with Kanban in a Production Line with Constant Processing Times (상수 공정시간을 갖는 라인 생산 시스템에서 CONWIP과 간반의 성능 비교)

  • Lee, Ho-Chang;Seo, Dong-Won
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.36 no.2
    • /
    • pp.51-65
    • /
    • 2011
  • We compared a CONWIP(constant work-in-process) system with a kanban system in a production line with constant processing times. Based on the observation that a WIP-controlled line production system such as CONWIP and kanban is equivalent to a m-node tandem queue with finite buffer, we applied a max-plus algebra based solution method for the tandem queue to evaluate the performance of two systems. Numerical examples with 6 workstations were used to demonstrate the proposed analysis. The numerical results support the previous studies that CONWIP outperforms kanban in terms of expected waiting time and WIP. Unlike the kanban case, sequencing workstations in a CONWIP does not affect the performance of the system.

An IoT-Aware System for Managing Patients' Waiting Time Using Bluetooth Low-Energy Technology

  • Reham Alabduljabbar
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.3
    • /
    • pp.83-92
    • /
    • 2024
  • It is a common observation that whenever any patient arrives at the front desk of a hospital, outpatient clinic, or other health-associated centers, they have to first queue up in a line and wait to fill in their registration form to get admitted. The long waiting time without any status updates is the most common complaint, worrying health officials. In this paper, UrNext, a location-aware mobile-based solution using Bluetooth low-energy (BLE) technology, is presented to solve the problem. Recently, a technology-oriented method has been gaining popularity in solving the healthcare sector's problems, namely the Internet of Things (IoT). The implementation of this solution could be explained through a simple example that when a patient arrives at a clinic for her consultation. There, instead of having to wait in long lines, she will be greeted automatically, receive a push notification telling her that she has been admitted along with an estimated waiting time for her consultation session. This will not only provide the patients with a sense of freedom but would also reduce uncertainty levels that are generally observed, thus saving both time and money. This work aimed to improve clinics' quality of services and organize queues and minimize waiting times in clinics, leading to patient comfortability and reducing the burden on nurses and receptionists. The results demonstrated that the presented system was successful in its performance and helped achieve high usability.

A study on the Waiting Line in the Automated Storage/Retrieval System with Dual Command Policy (이중명령 자동창고의 대기행렬에 관한 연구)

  • Chang, Jin-Ick;Kim, Won-Joong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.4
    • /
    • pp.134-141
    • /
    • 2005
  • Due to the complexity and stochastic nature of automated warehousing system, items are usually queued up at I/O point. We introduce a storage/retrieval policy : dual-command. We present quick approximations to queueing phenomena under these policies. It is assumed that the storage and retrieval arrival pattern follow the same poisson process. We also assumed that storage queue and retrieval queue being operated separately. The approximation attempts are performed under the proposed storage/retrieval policies after we derive S/R machine travel time distributions.

On the Analysis of Transportation Process of Pusan Port (시뮬레이션에 의한 부산항만 운송과정의 분석에 관하여)

  • 박계각
    • Journal of the Korean Institute of Navigation
    • /
    • v.10 no.1
    • /
    • pp.101-127
    • /
    • 1986
  • Transportation provides an infrastructure vital to economic growth, and it is an integral part of production . As a port is the interface between the maritime transport and domestic transport sectors, it certainly plays a key role in any economic development. Therefore, it is doubtless that inadequacy of a nation's port will depress the level of throughput, to the level where it fails to meet the target set by the national economic planning schemes. Korea is surrounded by the seas and the economic structure of Korea consists of processing trades, so that it cannot be overstated that substantial economy in maritime transport coasts can be achieved through the improvement of the port transport system. This paper treats the transportation process in Pusan Port by Queueing Simulation method, and the reasonable size of Pusan Port is suggested from the point of view of efficiency maximization. The results of the analysis are summarized as follows; 1) the utility rate is 47.91 percents in general piers, 85-52 percents in container piers, and waiting time 5.2hrs, in general piers, 0.8 hrs, in container piers, and the probability of maximum queue length 12 ships in general piers, 2 ships in container piers, and the probability of waiting is 44 percents in general piers, 8 percents in container pier. 2) in general piers, the improvement of app. 30 percents in port capacity is desirable for operating effectively concerning the current arrival rate. By introducing the traffic control ion container piers, there is no apparent necessity of port investment, but I is expected to reduce invisible congestion occurred along the waiting line. 3) On Pusan Port, the optimal utility rate and the optimal arrival rate for reducing waiting time are 3.5 to 4.0(hrs./ship) in general piers, 5.1 to 6.0(hrs./ship) in container piers.

  • PDF

A discrete Time Priority Queueing Model with Bursty Arrivals (돌발적인 도착이 있는 우선순위 이산 큐잉 모델)

  • 이미정
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.19 no.10
    • /
    • pp.2014-2027
    • /
    • 1994
  • A queueing model with two input streams of different service priorities is studied. Specifically, IBP+BP/D/1 with head-of-line priority is analyzed. IBP and BP stand for Interrupted Bernoulli Process and Bernoulli Process respectively. The BP-stream customers have the higher service priority over the IBP-stream customers. An exact analysis of this priority queue is presented to derive the distributions of the state of the system at steady state, the waiting time distributions for each class of customers, and the interdeparture time distributions. The numerical results of the analysis are presented to show how the various parameters of the low and high priority arrival processes affect the performance of the system.

  • PDF

Performance Analysis of BIM Labor using Case Analysis (사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석)

  • Kim, Hyoung-Jin;Yoo, Moo-Young;Kim, Jae-Jun;Choi, Chang-Shik
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.31-39
    • /
    • 2017
  • BIM is effective to improve the labor productivity of construction participants. From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.

A Study on Introduction of Bike Exclusive Signal Focused on Traffic Condition (국내 교통여건을 고려한 자전거전용신호 도입방안 연구)

  • Han, Won-Sub;Whang, Sang-Ho;Hyun, Cheol-Seung;Lee, Ho-Won;Oh, Yong-Tae;Lee, Choul-Ki
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.7 no.5
    • /
    • pp.77-89
    • /
    • 2008
  • The bikes are conflicted with the cars and the pedestrian at the intersection and the road with the bike crossing. To establish the bike signal at this section is one method to solve this conflict. According to the survey for the bike road status and the biker's characters which are crossing the road at the intersection, the bike crossing are established with beside the pedestrian crossing and most of the bikers are crossing the street by the pedestrian signal. Also, the bike queue which is waiting the signal change at the stop line was cleared before the closing the pedestrian signal. Considering the result of this survey, TOUCAN crossing signal type in England for bike signal at the place where the bike crossing are established with beside the pedestrian crossing, in which bike rider and pedestrian can cross by the pedestrian signal operation, is suggested. However, at the place where the bike crossing is apart from the pedestrian crossing, the bike signal which is connected to the vehicle signal is suggested. All these types of bike signals can be accepted for the present bike crossing equipments and the biker's characters and be adapted to the police standard traffic signal controller by adjusting the signal time only without any function change.

  • PDF