Performance Analysis of BIM Labor using Case Analysis |
Kim, Hyoung-Jin
(한양대학교 일반대학원 건축공학과)
Yoo, Moo-Young (한양대학교 일반대학원 건축공학과) Kim, Jae-Jun (한양대학교 건축공학과) Choi, Chang-Shik (한양대학교 건축공학과) |
1 | Barison, M., Santos, E. T. (2010). An overview of BIM Specialists, Journal of International Conference on Computing in Civil and Building Engineering, pp. 141-148. |
2 | Engineeringengineer, laborunitprice, National Statistical Office, http://kosis.kr/statHtml/statHtml. do?orgId=372&tblId=TX_37201_A000 (2016). |
3 | Ham, N. H., Kim, J. J. (2015). A case study on BIM Operating and Performance Measurement in Construction Phase, Journal of KIBIM, 5(2), pp. 1-11. DOI |
4 | Han, M. G. (2001). A Simulation for Optimum Working Process System at Bank Windows, Journal of Korea Spatial Informantion Society, Masters Thesis, Chonanm National University, pp. 1-48. |
5 | Joseph, J. (2011). BIM titles and job descriptions: How do they fit in your organizational structure?. Autodesk University |
6 | Kang, T. W., Won, J. S., Lee, G. (2013). A Study on the Development Direction of a BIM Performance Assessment Tool, Journal of Korea Spatial Informantion Society, 21(1), pp. 53-62. |
7 | Kendall, D. G. (1953). Stochastic processes occurring in the theory of queues and their analysis by the method of the imbedded Markov chain, Journal of the Annals of Mathematical Statistics, pp. 338-354. |
8 | Kim, E. J., Kim, J. H,. Huh, Y. K. (2016). A Case Study on Practical Uses of BIM in Building Construction, Journal of the Architectural Institute of Korea Structure & Construction, 32(12), pp. 69-75. DOI |
9 | Lee, G., Harrison, K. P., Jong, S. W. (2012). D3 City project-Economic impact of BIM-assisted design validation, Journal of Automation in Construction, 22(2012), pp. 577-586. DOI |
10 | Neelamkavil, J., S. Ahamed. (2012). The return on investment from BIM-driven projects in construction, Institute for Research in Construction, National Research Council of Canada: Ottawa, (2012). |
11 | Park, C. S,. Park, H. T. (2010). Improving Constructability Analysis Tasks by Applying BIM Technology, Journal of the Korea Institute of Construction Engineering and Management, 11(2), pp. 137-146. DOI |
12 | Park, G. H. (2011). (A) study on the effect of pre-detecting errors using BIM in the pre-construction phase, Masters Thesis, Yonsei University, (2011). |
13 | Park, J. S. (2014). A Workflow Time Analysis Applying the Queueing Model, Journal of the Korea Society for Simulation, 23(3), pp. 1-9. DOI |
14 | Uhm, M. Y., Park, Y. H., Won, J. S., Lee, G. (2013). A Study on the Development Direction and Priority of the BIMBased Hospital Design Validation Technology, Journal of the Architectural Institute of Korea, pp. 147-155. |