DOI QR코드

DOI QR Code

Performance Analysis of BIM Labor using Case Analysis

사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석

  • 김형진 (한양대학교 일반대학원 건축공학과) ;
  • 유무영 (한양대학교 일반대학원 건축공학과) ;
  • 김재준 (한양대학교 건축공학과) ;
  • 최창식 (한양대학교 건축공학과)
  • Received : 2017.09.15
  • Accepted : 2017.09.18
  • Published : 2017.09.30

Abstract

BIM is effective to improve the labor productivity of construction participants. From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.

Keywords

References

  1. Barison, M., Santos, E. T. (2010). An overview of BIM Specialists, Journal of International Conference on Computing in Civil and Building Engineering, pp. 141-148.
  2. Engineeringengineer, laborunitprice, National Statistical Office, http://kosis.kr/statHtml/statHtml. do?orgId=372&tblId=TX_37201_A000 (2016).
  3. Ham, N. H., Kim, J. J. (2015). A case study on BIM Operating and Performance Measurement in Construction Phase, Journal of KIBIM, 5(2), pp. 1-11. https://doi.org/10.13161/kibim.2015.5.2.001
  4. Han, M. G. (2001). A Simulation for Optimum Working Process System at Bank Windows, Journal of Korea Spatial Informantion Society, Masters Thesis, Chonanm National University, pp. 1-48.
  5. Joseph, J. (2011). BIM titles and job descriptions: How do they fit in your organizational structure?. Autodesk University
  6. Kang, T. W., Won, J. S., Lee, G. (2013). A Study on the Development Direction of a BIM Performance Assessment Tool, Journal of Korea Spatial Informantion Society, 21(1), pp. 53-62.
  7. Kendall, D. G. (1953). Stochastic processes occurring in the theory of queues and their analysis by the method of the imbedded Markov chain, Journal of the Annals of Mathematical Statistics, pp. 338-354.
  8. Kim, E. J., Kim, J. H,. Huh, Y. K. (2016). A Case Study on Practical Uses of BIM in Building Construction, Journal of the Architectural Institute of Korea Structure & Construction, 32(12), pp. 69-75. https://doi.org/10.5659/JAIK_SC.2016.32.12.69
  9. Lee, G., Harrison, K. P., Jong, S. W. (2012). D3 City project-Economic impact of BIM-assisted design validation, Journal of Automation in Construction, 22(2012), pp. 577-586. https://doi.org/10.1016/j.autcon.2011.12.003
  10. Neelamkavil, J., S. Ahamed. (2012). The return on investment from BIM-driven projects in construction, Institute for Research in Construction, National Research Council of Canada: Ottawa, (2012).
  11. Park, C. S,. Park, H. T. (2010). Improving Constructability Analysis Tasks by Applying BIM Technology, Journal of the Korea Institute of Construction Engineering and Management, 11(2), pp. 137-146. https://doi.org/10.6106/KJCEM.2010.11.2.137
  12. Park, G. H. (2011). (A) study on the effect of pre-detecting errors using BIM in the pre-construction phase, Masters Thesis, Yonsei University, (2011).
  13. Park, J. S. (2014). A Workflow Time Analysis Applying the Queueing Model, Journal of the Korea Society for Simulation, 23(3), pp. 1-9. https://doi.org/10.9709/JKSS.2014.23.3.001
  14. Uhm, M. Y., Park, Y. H., Won, J. S., Lee, G. (2013). A Study on the Development Direction and Priority of the BIMBased Hospital Design Validation Technology, Journal of the Architectural Institute of Korea, pp. 147-155.

Cited by

  1. BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea vol.2019, pp.None, 2017, https://doi.org/10.1155/2019/4163625